← Back
Public elementary, junior or senior high
P.S. 150 Charles James Fox
1050 TIFFANY STREET · BIN 2005681
💬 Discuss this project
1958Year Built
3Stories
W1Building Class
R7-1Zoning
160,854 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 2 unresolved · 12 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 120,832 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 2 filings · 20 docs
Floor 3Under Construction9p · 1 filing · 20 docs
Floor 2
Floor 1
Basement6p · 2 filings · 20 docs
Sub-BasementUnder Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION1803/22/2026
DOE 040103/22/2026
DOE X 150 040303/22/2026
DEPT OF EDUCATION PS 150103/22/2026
NYC DOE 0103/22/2026
DEPT OF EDUCATION,X150503/22/2026
P.S. 150 D.O.E.803/22/2026
BOE C.S. 150203/22/2026
PS 150 DEPT OF EDUCATION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES1003/21/2026
GREENMAN PEDERSEN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERLAST SCAFFOLDING INCGeneral Contractor607/08/2026
AKM CONSTRUCTION SERVICE*General Contractor607/08/2026
FORSYTHE P&H CORPPlumbing508/05/2026
ENVIROTRAC LTDGeneral Contractor407/08/2026
SCHWERDTFEGER, MARCUSElectrical303/21/2026
FLORENTINE ARTISTIC IRONElectrical303/21/2026
LUPINSKI, MAREKElectrical303/21/2026
CHAYUT, ALLENElectrical303/21/2026
SURAJ RAMDEOElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
DORION NORTON ELECL CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317907/05/2024
Building Lifecycle
All (148)Filed (17)Permit Issued (15)Signed Off (4)Violation (60)Inspection (4)Objection (18)Special Inspection (30)
08/14/2026
Filed — Alteration
FILE MECHANICAL WORK TO INSTALL (3)THREE OUTDOOR HVAC UNITS AT ROOF ABOVE BASEMENT OF PUBLIC SCHOOL X150 FOR AUDITORIUM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01432212-I1
08/04/2026
Permit issued — Plumbing
X00640243-S1-PL
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Other
07/29/2026
Filed — Alteration
Remove existing asphalt pavement, concrete sidewalk, curb, other surfaces required for installation of new water service lines. Trench &remove existing surfaces required for installation of new water service. restore all distrubed surfaces to orig conditi
X01422910-S1
07/28/2026
Filed — Alteration
Remove existing asphalt pavement, concrete sidewalk, curb, other surfaces required for installation of new water service lines. Trench &remove existing surfaces required for installation of new water service. restore all distrubed surfaces to orig conditi
X01422910-I1
07/28/2026
Special inspection requirement — Sprinkler Systems
07/24/2026
Violation issued (ECB, open)
Construction
07/24/2026
Violation issued (ECB, open)
Construction
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Mechanical Systems
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Objection resolved — Addressed
11/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2025
Objection raised — Other
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/24/2025
Filed — Alteration
Interior and exterior alteration of existing building. No change in use, egress, or occupancy.
X01307595-S1
10/24/2025
Filed — Alteration
Interior and exterior alteration of existing building. No change in use, egress, or occupancy.
X01307595-I1
10/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/23/2025
Special inspection requirement — Masonry
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/17/2025
Violation issued (ECB, closed)
Construction
09/17/2025
Violation issued (ECB, closed)
Construction
09/17/2025
Violation issued (ECB, closed)
Construction
09/03/2025
Permit issued — Plumbing
X00640243-S1-PL
01/22/2025
Signed off — Alteration
FN/PS150X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR FOR SOIL REMEDIATION, RELATED TO LLW#121775 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01044906-I1
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, closed)
Construction
11/07/2024
Violation issued (ECB, closed)
Construction
11/07/2024
Violation issued (ECB, open)
Construction
10/02/2024
Permit issued — Plumbing
X00640243-S1-PL
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2024
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
07/15/2024
Special inspection requirement — Duct leakage testing, insulation and design
07/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
07/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
07/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/15/2024
Special inspection requirement — Structural Steel - Welding
07/15/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
07/15/2024
Special inspection requirement — Maintenance information
07/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/15/2024
Special inspection requirement — Shutoff dampers
07/15/2024
Special inspection requirement — Post-installed Anchors
07/15/2024
Special inspection requirement — Structural Steel - Details
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
07/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/12/2024
Objection resolved — Addressed
07/11/2024
Objection raised — Other
07/10/2024
Filed — Alteration
FN/PS150X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR FOR SOIL REMEDIATION, RELATED TO LLW#121775 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01044906-P1
07/05/2024
Filed — Alteration
Add an air conditioning system at the existing Auditorium.
X00793179-P1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP08/04/2026
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP09/03/2025
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP10/02/2024
DOB NOWConstruction FenceSigned-offENVIROTRAC LTD06/17/2024
DOB NOWConstruction FenceSigned-offENVIROTRAC LTD06/12/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP10/23/2023
DOB NOWConstruction FenceSigned-offAKM CONSTRUCTION SERVICE*06/21/2023
DOB NOWStructuralPermit IssuedAKM CONSTRUCTION SERVICE*06/21/2023
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING02/10/2023
DOB NOWSupported ScaffoldSigned-offEVERLAST SCAFFOLDING02/10/2023
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP11/16/2022
DOB NOWGeneral ConstructionPermit IssuedAKM CONSTRUCTION SERVICE*11/14/2022
DOB NOWSidewalk ShedSigned-offEVERLAST SCAFFOLDING09/20/2022
DOB NOWSupported ScaffoldSigned-offEVERLAST SCAFFOLDING09/20/2022
DOB NOWConstruction FenceSigned-offAKM CONSTRUCTION SERVICE*09/15/2022
BISOTISSUEDARORA CONSTRUCTION INC01/27/2021
BISMHISSUEDMEC-CON ASSOCIATES INC02/26/2019
BISMHISSUEDMEC-CON ASSOCIATES INC11/28/2018
BISOTISSUEDAECOM USA INC08/26/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/14/2009
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/14/2009
BISPLISSUEDEAGLE 1 MECHANICAL, INC03/30/2007
BISOTISSUEDAMCC CORPORATION03/29/2007
BISOTISSUEDAMCC12/11/2006
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC12/04/2006
BISEQISSUEDAMCC12/28/2005
BISEQISSUEDAMCC12/28/2005
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.11/28/2005
BISOTISSUEDAMCC08/11/2005
BISPLISSUEDA. BERWIND PLUMBING & HEATING08/11/2005
BISEQISSUEDAMCC08/11/2005
BISOTISSUEDONYX DOOR SPECIALTIES01/13/1997
2 projects · most recent 08/14/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026——Air Conditioning Systems
Cooling
Daikin DC6TE09030AA 95,000 BTU · Condensing Unit ×3
07/05/2024——Air Conditioning Systems
Cooling
Trane OANE480D3 40 tons · Heat Pump Outdoor ×2
2 projects · most recent 07/29/2026
Water/Sanitary Storm
FiledStatusContractorScope
07/29/2026——Water/Sanitary
06/26/2023Permit IssuedFORSYTHE P&H CORPStorm
9 projects · most recent 04/09/2026
General Wiring
FiledStatusContractorScope
04/09/2026Permit IssuedHI-RITE ELECTRIC CORPGeneral Wiring
03/16/2026CompleteANCO ELECTL CONTCTNG INC—
01/28/2026CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
09/16/2025CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
11/25/2024CompleteEVEREST ELECTRIC CORP—
11/30/2022CompleteRODEL ELEC'L CONTR'S, INGeneral Wiring
08/17/2022CompleteSTANCO SYSTEM ELEC'L CONT—
05/26/2021CompleteDORION NORTON ELECL CONTGeneral Wiring
03/20/2020CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
3 projects · most recent 07/29/2026
Steel
FiledStatusContractorScope
07/29/2026——1 scope_items
07/05/2024——Steel
06/26/2023Permit IssuedFORSYTHE P&H CORPSteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/28/2026Sprinkler Systems—special
07/16/2026Mechanical Systems—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Final—progress
07/16/2026Energy Code Compliance Inspections—progress
07/16/2026HVAC-R and service water heating equipment—energy_progress
07/16/2026HVAC-R and service water piping design and insulation—energy_progress
11/20/2025Structural Stability – Alterations of existing buildings—special
10/24/2025Fire-Resistance Rated Construction—progress
10/23/2025Masonry—special
10/23/2025Fire-Resistant Penetrations and Joints—special
10/23/2025Fire-Resistant Penetrations and Joints—special
07/15/2024Shutoff dampers—energy_progress
07/15/2024Structural Steel - Welding—special
07/15/2024Structural Steel - Details—special
07/15/2024Structural Steel - High Strength Bolting—special
07/15/2024Fire-Resistant Penetrations and Joints—special
07/15/2024Mechanical SystemsMIKHAIL ZEYGMANspecial
07/15/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
07/15/2024Post-installed Anchors—special
07/15/2024Energy Code Compliance Inspections—progress
07/15/2024FinalMIKHAIL ZEYGMANprogress
07/15/2024Maintenance information—energy_progress
07/15/2024HVAC-R and service water heating system controls—energy_progress
07/15/2024HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 150Education—
Project X01422910 Alteration · Objections · 07/28/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026X00640243-P1Request digital key ↗
08/24/2026X00640243-P3Request digital key ↗
08/24/2026X00640243-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
08/08/2013220325967Open ↗
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸BISWORK PERMIT APPLICATION2
01/14/2009210107711Open ↗
01/14/2009210107720Open ↗
▸Seals & Professional Certifications58
▸DOB NOWSpecial Inspector Seal & Signature18
08/28/2026X00640243-I1Open ↗
08/28/2026X00640243-I1Open ↗
08/28/2026X00640243-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/24/2026X00640243-P1Open ↗
08/24/2026X00640243-P2Open ↗
08/24/2026X00640243-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026X00640243-P1Open ↗
08/28/2026X00640243-I1Open ↗
08/28/2026X00640243-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/10/2013220325967Open ↗
10/28/2009210107720Open ↗
10/28/2009210107711Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/08/2013220325967Open ↗
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/08/2013220325967Open ↗
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026X00752685-I1Open ↗
08/13/2026X00752695-I1Open ↗
08/13/2026X01044906-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
08/31/2013220325967Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026X00640243-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/10/2013220325967Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/24/2026X00640243-P3Open ↗
08/24/2026X00640243-P1Open ↗
08/24/2026X00640243-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/15/2026X01422910-S1Open ↗
08/15/2026X01422910-I1Open ↗
08/13/2026X00752690-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026X00752690-I1Open ↗
08/13/2026X01044906-I1Open ↗
08/13/2026X00752695-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/31/2013220325967Open ↗
10/28/2009210107720Open ↗
10/28/2009210107711Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2009210107720Open ↗
10/28/2009210107711Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/15/2026X00640243-S1Open ↗
08/15/2026X00640243-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/08/2013220325967Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
08/08/2013220325967Open ↗
01/15/2009210107720Open ↗
01/14/2009210107711Open ↗
▸DOB NOWAI1 Form1
08/13/2026X00640243-I1Open ↗
▸Other Documents21
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/15/2026X01422910-S1Open ↗
08/15/2026X01422910-I1Open ↗
08/13/2026X00640243-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/13/2026X00752690-I1Open ↗
08/13/2026X00752695-I1Open ↗
08/13/2026X00752685-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026X00793179-I1Open ↗