← Back
BuildNYC
Elevator apt, miscellaneous
1050 WESTCHESTER AVENUE
BRONX · BIN 2006022
💬 Discuss this project
1928Year Built
1Stories
D9Building Class
C4-4Zoning
67,339 sfGross Floor Area
65Units
LL97 Covered6 Active Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: DTRD Realty · 14,271 sf lot · 4.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDtrd Realty13p · 2 filings · 15 docs
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 4 docs
CellarDtrd Realty2p · 2 filings · 15 docs
Site & exteriorDtrd Realty5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DTRD Realty3607/08/2026
Pro Empire Construction203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Omfpe Consulting206/05/2022
Dooling & Company Architects101/23/2020
Haider Engineering, P.E.107/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
SNR Expediting Design203/21/2026
Alba Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C J Construction PaintingGeneral Contractor1003/21/2026
MNK EnterprisesScaffold407/08/2026
C & J Construction and PaintingScaffold307/08/2026
GJ PlumbingPlumbing307/08/2026
Patriot ElectricElectrical303/22/2026
Sandha General ContractingGeneral Contractor203/21/2026
Allstate SprinklerFire Protection305/11/2022
Whitestone PlumbingPlumbing110/03/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mastrogiacomo Engineering4237206/05/2022
Building Lifecycle
11/02/2026
Closed: Full stop work order issued under job # 220638273 due to no approved plan on site at time of inspection , stop all fire suppression work under…
DOB violation · closed on the city's record
07/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/21/2026
Closed: Failure to file 2023 external low pressure inspection
DOB violation · closed on the city's record
05/11/2026
Elevator Category 1 inspection report filed
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
119 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTVS Mechanical07/07/2022
DOB NOWBoiler EquipmentSigned-offTVS Mechanical02/02/2022
DOB NOWSupported ScaffoldSigned-offC & J Construction and Painting01/26/2021
DOB NOWSidewalk ShedSigned-offMNK Enterprises07/13/2020
DOB NOWSupported ScaffoldSigned-offC & J Construction and Painting02/10/2020
DOB NOWSidewalk ShedSigned-offMNK Enterprises07/11/2019
BISPLISSUEDWhitestone Plumbing10/03/2022
BISSDISSUEDAllstate Sprinkler05/11/2022
BISPLISSUEDGJ Plumbing12/07/2021
BISPLISSUEDGJ Plumbing12/07/2020
BIS—ISSUEDC & J Construction and Painting06/05/2020
BISOTISSUEDC & J Construction and Painting06/05/2020
BIS—ISSUEDC & J Construction and Painting06/05/2020
BISSPISSUEDAllstate Sprinkler05/12/2020
BIS—ISSUEDC & J Construction and Painting04/27/2020
BIS—ISSUEDC & J Construction and Painting04/27/2020
BIS—ISSUEDC & J Construction and Painting03/04/2020
BIS—ISSUEDC & J Construction and Painting03/04/2020
BISOTISSUEDC & J Construction and Painting03/04/2020
BISEQISSUEDC & J Construction and Painting03/04/2020
BISPLISSUEDGJ Plumbing01/15/2020
BISSPISSUEDAllstate Sprinkler05/13/2019
BIS—ISSUEDC & J Construction and Painting03/29/2019
BIS—ISSUEDC & J Construction and Painting03/29/2019
BIS—ISSUEDC & J Construction and Painting10/12/2018
BISEQISSUEDC & J Construction and Painting10/12/2018
BISOTISSUEDC & J Construction and Painting06/26/2018
BISOTISSUEDC & J Construction and Painting04/05/2018
BISOTISSUEDC & J Construction and Painting01/09/2018
BISOTISSUEDSandha General Contracting04/27/2012
BISEQISSUEDSandha General Contracting04/27/2012
BISOTISSUEDN/A11/14/1995
8 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026CompleteMarcel Electrical Contracting—
10/13/2022CompletePatriot ElectricGeneral Wiring
05/23/2022CompletePatriot ElectricGeneral Wiring
03/25/2022CompletePatriot ElectricGeneral Wiring
03/15/2021CompletePatriot ElectricGeneral Wiring
12/10/2020CompleteTuxedo Electrical Contracting—
03/16/2020CompleteL J Electrical ServiceGeneral Wiring
06/27/2019CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/20/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/21/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/26/2022HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
06/26/2022Maintenance informationMICHAEL MASTROGIACOMOenergy_progress
06/26/2022HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
06/26/2022HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
05/31/2022Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
05/31/2022Heating SystemsMICHAEL MASTROGIACOMOspecial
09/01/2021Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
09/01/2021HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
09/01/2021HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
09/01/2021Heating SystemsMICHAEL MASTROGIACOMOspecial
09/01/2021Maintenance informationMICHAEL MASTROGIACOMOenergy_progress
06/27/2019FinalSunil Saigalprogress
135 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account