← Back
BuildNYC
Garden apartments
1050 WHEELER AVENUE
BRONX · BIN 2023431
💬 Discuss this project
1950Year Built
3Stories
C9Building Class
R6Zoning
66,000 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized56 Active Violations 51 unresolved · 5 paperwork only 1 likely answered 2 old, status unconfirmed ▸
Garden apartments · Owner of record: Wheeler Housing · 40,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStandpipe riser installation2 filings · 7 docs
Floor 6Standpipe riser installation2 filings · 7 docs
Floor 5Standpipe riser installation2 filings · 7 docs
Floor 4Standpipe riser installation2 filings · 7 docs
Floor 3Standpipe riser installation3 filings · 10 docs
Floor 2Standpipe riser installation3 filings · 10 docs
Floor 1Curb cut and sidewalk work4 filings · 12 docs
CellarStandpipe riser installation3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wheeler Housing903/22/2026
CCP403/21/2026
NY Sandy 12 CBPG203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2026$6.3M—WHEELER HOUSING, LLC → DPC HOLDINGS II LLC$95/sf building
03/31/2026$4.1M—DPC HOLDINGS II LLC → TYH WHEELER LLC$62/sf building
07/08/2020$9.3M—NYSANDY12 CBP9 LLC → WHEELER HOUSING, LLC$141/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Issac & Stern Architects105/16/2022
Associates304/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants403/21/2026
Building Lifecycle
06/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/06/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30SQ FT AT EAST WALL (30 SQ FT) AND NORTH WALL (30…
HPD violation · closed
03/18/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3V, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD violation · closed
03/18/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING, SOUTH AND EAST IN THE…
HPD violation · closed
03/18/2026
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM…
HPD violation · open
216 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDLeardon Boiler Works01/29/2018
BISOTISSUEDJoseph & Son Restoration10/28/2016
BISBLISSUEDG. Bauer11/20/1991
1 project · most recent 03/10/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
03/10/2022——Air Conditioning Systems, Ventilation Systems
1 project · most recent 03/21/2022
Storm Water/Sanitary
FiledStatusContractorScope
03/21/2022——Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/15/2022Fire-Resistant Penetrations and Joints—special
03/10/2022Heating Systems—special
03/01/2022Sprinkler Systems—special
03/01/2022Standpipe Systems—special
01/25/2022Fire-Resistant Penetrations and Joints—special
01/07/2022Final—progress
01/07/2022Mechanical Systems—special
85 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account