Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
Switch Inc. Electrical Contracting
Electrical
1
03/21/2026
Fire Out
Fire Protection
1
06/01/2000
Building Lifecycle
07/24/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
07/16/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/29/2023
Boiler inspection report filed
Initial · no defects · Accepted
07/20/2022
Boiler inspection report filed
Initial · no defects · Accepted
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account