← Back
Five to six families
1051 SUMMIT AVNUE
BRONX · BIN 2115019
💬 Discuss this project
2006Year Built
3Stories
C2Building Class
R7-1Zoning
8,760 sfGross Floor Area
6Units
Rent Stabilized45 Open Violations ▸
Five to six families · Owner of record: SUMMIT PROPERTY GARDENS 2 LLC · 3,825 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUMMIT PROPERTY GARDENS 2 LLC903/22/2026
KINGS COLLEGE REAL ESTATE303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2016$751K—— → —$86/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.607/14/2025
ADVANCED ENGINEERING & INSPECT. PLL507/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEVM EXPEDITORS1603/21/2026
ELLIPSES DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION BUILD USA INCGeneral Contractor1007/08/2026
PRECISION BUILDERS USAGeneral Contractor303/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE20501107/14/2025
Building Lifecycle
All (141)Filed (11)Permit Issued (5)Signed Off (4)Violation (60)Inspection (11)Objection (20)Special Inspection (30)
07/01/2026
Violation issued (HPD, open)
B
02/05/2026
Signed off — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-I1
08/18/2025
Signed off — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-S4
08/14/2025
Special inspection requirement — Shutoff dampers
PAUL MARINO
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
08/14/2025
Special inspection requirement — Final
JAMES SCHAEFER
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
08/14/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
08/14/2025
Special inspection requirement — Heating Systems
PAUL MARINO
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
08/14/2025
Special inspection requirement — Maintenance information
PAUL MARINO
07/21/2025
Special inspection requirement — Exterior lighting power
PAUL MARINO
07/21/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
07/21/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
07/21/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
07/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
07/16/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/14/2025
Filed — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-A1
07/14/2025
Filed — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-P8
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
07/14/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
07/14/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
07/14/2025
Special inspection requirement — Exterior lighting power
PAUL MARINO
07/14/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
07/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
03/05/2025
Signed off — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-S2
03/05/2025
Signed off — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-S3
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
03/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
03/05/2025
Special inspection requirement — Heating Systems
PAUL MARINO
03/05/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/06/2024
Violation issued (HPD, open)
C
11/06/2024
Violation issued (HPD, open)
C
04/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2024
Violation issued (ECB, closed)
Construction
01/21/2024
Violation issued (HPD, closed)
C
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, open)
C
01/21/2024
Violation issued (HPD, closed)
A
01/21/2024
Violation issued (HPD, closed)
C
01/21/2024
Violation issued (HPD, closed)
C
01/10/2024
Violation issued (HPD, closed)
B
01/10/2024
Violation issued (HPD, closed)
B
12/14/2023
Filed — Alteration CO
ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORY + CELLAR, EXISTING 3 FAMILY PROPOSED 4 FAMILY.
X00569687-P6
12/10/2023
Violation issued (HPD, closed)
C
12/10/2023
Violation issued (HPD, closed)
C
12/10/2023
Violation issued (HPD, closed)
C
12/10/2023
Violation issued (HPD, closed)
B
12/10/2023
Violation issued (HPD, closed)
B
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2023
Violation issued (HPD, open)
I
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPRECISION BUILD USA INC05/04/2023
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILD USA INC05/02/2023
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC01/27/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/07/2022
DOB NOWGeneral ConstructionPermit IssuedPRECISION BUILDERS USA09/13/2022
BISPLISSUEDA P PLUMBING&HEATING INC02/26/2007
BISEQISSUEDAQUINO GENERAL CONSTRUCTION INC.12/06/2006
BIS—ISSUEDAQUINO GENERAL CONSTRUCTION INC.09/26/2006
BISEQISSUEDAQUINO GENERAL CONSTRUCTION INC.09/26/2006
BISEQISSUEDAQUINO GENERAL CONSTRUCTION INC.08/01/2006
BIS—ISSUEDAQUINO GENERAL CONSTRUCTION INC.08/01/2006
1 project · most recent 07/14/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2025Signed-offPRECISION BUILD USA INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GL06NA. 6,000 BTU · Fan Coil Indoor ×2
MSZ-GL09NA. 9,000 BTU · Fan Coil Indoor ×2
MSZ-GL18NA. 12,000 BTU · Fan Coil Indoor ×2
MUZGL18NA. 21,600 BTU · Heat Pump Outdoor ×2
MXZ2C20NA3. 25,500 BTU · Vrf Outdoor ×2
Ventilation
Nutone AEN110. 50 CFM · Exhaust Fan ×2
QTXEN150. 100 CFM · Kitchen Exhaust ×2
1 project · most recent 07/14/2025
Sprinkler System
FiledStatusContractorScope
07/14/2025Signed-offPARAMOUNT SERVICES, LLCSprinkler System
1 project · most recent 07/14/2025
Water/Sanitary
FiledStatusContractorScope
07/14/2025Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
2 projects · most recent 10/25/2023
General Wiring
FiledStatusContractorScope
10/25/2023Permit IssuedTFK ELECTRIC CORPGeneral Wiring
11/16/2022CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 07/14/2025
FiledStatusContractorScope
07/14/2025Signed-offPRECISION BUILD USA INC1 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/16/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/31/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/14/2025Shutoff dampersPAUL MARINOenergy_progress
08/14/2025HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
08/14/2025FinalJAMES SCHAEFERprogress
08/14/2025Energy Code Compliance InspectionsPAUL MARINOprogress
08/14/2025Mechanical SystemsPAUL MARINOspecial
08/14/2025Heating SystemsPAUL MARINOspecial
08/14/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
08/14/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
08/14/2025HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
08/14/2025Maintenance informationPAUL MARINOenergy_progress
07/21/2025Exterior lighting powerPAUL MARINOenergy_progress
07/21/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
07/21/2025Fenestration areasPAUL MARINOenergy_progress
07/21/2025Fenestration air leakagePAUL MARINOenergy_progress
07/21/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/21/2025Fire-Resistance Rated ConstructionPAUL MARINOprogress
07/21/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/14/2025Fire-Resistance Rated ConstructionPAUL MARINOprogress
07/14/2025Fenestration air leakagePAUL MARINOenergy_progress
07/14/2025Fenestration areasPAUL MARINOenergy_progress
07/14/2025Exterior lighting powerPAUL MARINOenergy_progress
07/14/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
07/14/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
03/05/2025HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
Latest 25 of 59.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026X00569687-P1Request digital key ↗
08/22/2026X00569687-A1Request digital key ↗
08/22/2026X00569687-P8Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026X00569687-P5Open ↗
08/13/2026X00569687-P1Open ↗
08/13/2026X00569687-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00569687-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026X00569687-P6Open ↗
09/01/2026X00569687-P6Open ↗
09/01/2026X00569687-P6Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026X00569687-P6Open ↗
08/31/2026X00569687-S4Open ↗
08/31/2026X00569687-S4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026X00569687-A1Open ↗
08/22/2026X00569687-P8Open ↗
08/22/2026X00569687-P6Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/13/2026X00569687-P5Open ↗
08/13/2026X00569687-P6Open ↗
08/13/2026X00569687-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00569687-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00569687-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00569687-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00569687-I1Open ↗
▸Other Documents18
▸DOB NOWDHCR Document17
08/13/2026X00569687-P2Open ↗
08/13/2026X00569687-P1Open ↗
08/13/2026X00569687-A1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00569687-I1Open ↗