← Back
BuildNYC
Two family frame
1052 EAST 95TH STREET
BROOKLYN · Canarsie · BIN 3229325
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
1,008 sfGross Floor Area
2Units
3 Active Violations ▸FDNY Report ↗
Two family frame · 5,000 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Horizontal extension and interior renovation2 filings · 12 docs
Floor 1Horizontal extension and interior renovation2 filings · 12 docs
CellarHorizontal extension and interior renovation2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 1052 E 95 St103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aaaa Consulting108/31/2026
Architect Associates102/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectural Design Solutions103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963102/13/2026
Building Lifecycle
All (64)Filed (2)Violation (7)Objection (40)Special Inspection (15)
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
10/02/2026
Objection raised — Scope
09/29/2026
Objection raised — Scope
09/29/2026
Objection raised — Cost
09/29/2026
Objection raised — Scope
09/28/2026
Objection raised — Scope
09/28/2026
Objection raised — Scope
09/28/2026
Objection raised — Scope
09/28/2026
Objection raised — Scope
09/28/2026
Objection raised — Scope
08/31/2026
Filed — Alteration
TO PROPOSE HORIZONTAL EXTENSION AT REAR YARD OF THEEXISTING TWO-STORIED BUILDING. INCLUDING PARTIAL DEMOLITION AND INTERIOR RENOVATION WORK AS PER PLAN TO COMPLY ECBVIOLATION #39167977L AND STOP WORK ORDER #3A37201.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01448844-I1
08/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Mohammad Islam
08/20/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Mohammad Islam
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Islam
08/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Islam
08/20/2026
Special inspection requirement — Subgrade Inspections
Mohammad Islam
08/20/2026
Special inspection requirement — Final
Mohammad Islam
08/20/2026
Special inspection requirement — Footing and Foundation
Mohammad Islam
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Cost
03/09/2026
Objection raised — Scope
02/13/2026
Filed — Alteration
B01341626-I1
02/13/2026
Special inspection requirement — Wood – Seismic Resistance
01/02/2026
Special inspection requirement — Concrete - Cast-In-Place
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Subgrade Inspections
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Vertical Masonry Foundation Elements
IGOR LISOVENKO
01/02/2026
Special inspection requirement — Final
11/21/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2025
Violation issued (ECB, open)
Construction
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDPro Custom Solar02/15/2019
BISPLISSUEDAdvance Plumbing & Heating Co05/11/2001
BIS—ISSUEDThe Apple GP03/10/2000
1 project · most recent 03/01/2019
FiledStatusContractorScope
03/01/2019CompleteIsland Electric—
1 project · most recent 08/31/2026
Concrete Wood
FiledStatusContractorScope
08/31/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/20/2026Concrete - Cast-In-PlaceMohammad Islamspecial
08/20/2026Exterior Insulation and Finish Systems (EIFS)Mohammad Islamspecial
08/20/2026Fire-Resistant Penetrations and JointsMohammad Islamspecial
08/20/2026Structural Stability – Alterations of existing buildingsMohammad Islamspecial
08/20/2026Subgrade InspectionsMohammad Islamspecial
08/20/2026FinalMohammad Islamprogress
08/20/2026Footing and FoundationMohammad Islamprogress
02/13/2026Wood – Seismic Resistance—special
01/02/2026Concrete - Cast-In-PlaceIGOR LISOVENKOspecial
01/02/2026Exterior Insulation and Finish Systems (EIFS)IGOR LISOVENKOspecial
01/02/2026Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
01/02/2026Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
01/02/2026Subgrade InspectionsIGOR LISOVENKOspecial
01/02/2026Vertical Masonry Foundation ElementsIGOR LISOVENKOspecial
01/02/2026Final—progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/15/2026B01448844-I1Request digital key ↗
08/15/2026B01341626-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/05/2019340659503Open ↗
▸BISWORK PERMIT APPLICATION1
02/15/2019340659503Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
09/15/2026B01448844-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B01341626-I1Open ↗
08/27/2026B01341626-I1Open ↗
08/27/2026B01341626-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/15/2026B01448844-I1Open ↗
08/18/2026B01341626-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/05/2019340659503Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/05/2019340659503Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/05/2019340659503Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/21/2019340659503Open ↗
02/05/2019340659503Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
05/21/2019340659503Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/05/2019340659503Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/21/2019340659503Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/21/2019340659503Open ↗
02/05/2019340659503Open ↗
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
05/21/2019340659503Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/21/2019340659503Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/21/2019340659503Open ↗
02/05/2019340659503Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/05/2019340659503Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
09/15/2026B01448844-I1Open ↗