← Back
Two family brick
1052 STERLING PLACE
BROOKLYN · BIN 3032040
💬 Discuss this project
1906Year Built
4Stories
B1Building Class
R6Zoning
3,040 sfGross Floor Area
2Units
Two family brick · 2,405 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 4 docs
Floor 45p · 3 filings · 20 docs
Floor 36p · 3 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 14p · 2 filings · 9 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METROPOLIS HVAC CONTRACTORS1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.403/26/2025
RESTAURANT DESIGN AND DEVELOPMENT308/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RDDNY DESIGN BUILD303/21/2026
JCBP DESIGN STUDIOS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METROPOLIS HVAC CONTRA INGeneral Contractor107/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CARUSONE & CHERRES ARCHIT6166403/26/2025
Building Lifecycle
All (34)Filed (7)Permit Issued (3)Inspection (9)Special Inspection (15)
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/26/2025
Filed — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING TWO FAMILY TOWNHOUSE, NEW KITCHEN AND TOILET PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08005553-P2
03/11/2025
Special inspection requirement — Maintenance information
JORGE CHERRES
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
03/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JORGE CHERRES
03/11/2025
Special inspection requirement — Permanent certificate
JORGE CHERRES
03/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
JORGE CHERRES
03/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
JORGE CHERRES
10/03/2024
Filed — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING TWO FAMILY TOWNHOUSE, NEW KITCHEN AND TOILET PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08005553-P1
09/30/2024
Special inspection requirement — Permanent certificate
JORGE CHERRES
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
09/30/2024
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
09/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
JORGE CHERRES
09/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JORGE CHERRES
09/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
JORGE CHERRES
09/30/2024
Special inspection requirement — Maintenance information
JORGE CHERRES
06/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2024
Permit issued — Plumbing
B08005553-I1-PL
05/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2022
Permit issued — Plumbing
B08005553-I1-PL
09/29/2022
Filed — Alteration
B08005566-I1
09/26/2022
Filed — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING TWO FAMILY TOWNHOUSE, NEW KITCHEN AND TOILET PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08005553-I1
08/22/2022
Filed — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING TWO FAMILY TOWNHOUSE, NEW FLOOR, WALL AND CEILING FINISHES, NEW KITCHEN COUNTERS, NEW LIGHTING THROUGHOUT THE HOUSE, NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00785404-I1
05/16/2022
Permit issued — General Construction
B00730814-I1-GC
05/11/2022
Filed — Alteration
B00730814-I1
05/04/2022
Special inspection requirement — Final
Vincent Liotta
12/28/2021
Filed — Alteration
B00639551-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOE PARZIALE PLUMBING CO04/12/2024
DOB NOWPlumbingPermit IssuedJVR PLBG AND HEATING INC10/11/2022
DOB NOWGeneral ConstructionPermit IssuedMETROPOLIS HVAC CONTRA IN05/16/2022
1 job · most recent 03/26/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2025Permit IssuedJOE PARZIALE PLUMBING COGas, Water/Sanitary
1 job · most recent 09/17/2021
General Wiring
FiledStatusContractorScope
09/17/2021Permit IssuedVOLTRON ELECTL CONTNG CORGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/11/2025Maintenance informationJORGE CHERRESenergy_progress
03/11/2025Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
03/11/2025Energy Code Compliance InspectionsJORGE CHERRESprogress
03/11/2025HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
03/11/2025Permanent certificateJORGE CHERRESenergy_progress
03/11/2025HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
03/11/2025HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
09/30/2024Permanent certificateJORGE CHERRESenergy_progress
09/30/2024Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
09/30/2024Energy Code Compliance InspectionsJORGE CHERRESprogress
09/30/2024HVAC-R and service water heating equipmentJORGE CHERRESenergy_progress
09/30/2024HVAC-R and service water piping design and insulationJORGE CHERRESenergy_progress
09/30/2024HVAC-R and service water heating system controlsJORGE CHERRESenergy_progress
09/30/2024Maintenance informationJORGE CHERRESenergy_progress
05/04/2022FinalVincent Liottaprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00639551-I1Request digital key ↗
08/29/2026B00730814-I1Request digital key ↗
08/28/2026B00785404-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026B08005553-P2Open ↗
08/13/2026B08005553-P1Open ↗
08/13/2026B08005566-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00639551-I1Open ↗
08/29/2026B00730814-I1Open ↗
08/22/2026B08005553-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B08005553-P2Open ↗
09/01/2026B08005553-P2Open ↗
08/25/2026B00730814-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B08005553-P2Open ↗
08/23/2026B08005553-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00639551-I1Open ↗
08/29/2026B00730814-I1Open ↗
08/22/2026B08005553-P2Open ↗
Showing 3 of 7 on file for this type