Mansion type or town house
1053 OCEAN PARKWAY
BROOKLYN · BIN 3171135
💬 Discuss this project
2022Year Built
2.75Stories
A7Building Class
R5Zoning
5,819 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Mansion type or town house · Owner of record: 1053 OCEAN PARKWAY LLC · 6,000 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 2 docs
Floor 319p · 6 filings · 20 docs
Floor 216p · 5 filings · 20 docs
Floor 119p · 6 filings · 20 docs
Cellar19p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1053 OCEAN PARKWAY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1003/21/2026
PRESTON NYC203/21/2026
CITY EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. GENERAL CONTR CORPGeneral Contractor2407/08/2026
NESS MECHANICAL P & H INCPlumbing607/08/2026
LENS ELECTRIC, INCElectrical103/22/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
PRESTON NYC LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC4161004/22/2026
Building Lifecycle
All (150)Filed (13)Permit Issued (25)Signed Off (7)Violation (4)Inspection (21)Objection (52)Special Inspection (28)
06/02/2026
Permit issued — Plumbing
B00581640-I1-PL
04/22/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES, NEW GAS FIXTURES, NEW HOT WATER HEATERS & ASSOCIATED SANITARY, DOMESTIC AND GAS PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH MAIN NB FILING.
B00581640-P2
02/27/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/06/2026
Signed off — Alteration
B00620625-I1
02/06/2026
Signed off — Alteration
B00581633-I1
02/04/2026
Signed off — Alteration
FOUNDATION WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION AS PER PLANS FILED HEREWITH.
B00582567-I1
02/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/06/2025
Signed off — Alteration
Filing Sprinkler plan in conjunction with NB #B00577471-I1
B00744365-I1
08/20/2025
Violation issued (ECB, closed)
Construction
08/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/24/2025
Permit issued — Curb Cut
B00651681-I1-CC
06/23/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY 8 FT HEIGHT CONSTRUCTION FENCE AS PER PLAN FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08003055-I1
05/20/2025
Permit issued — Plumbing
B00581640-I1-PL
04/15/2025
Signed off — Alteration
SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION AS PER PLANS FILED HEREWITH.
B00703943-I1
03/28/2025
Signed off — Alteration
B00581756-I1
03/04/2025
Permit issued — Support of Excavation
B00703943-I1-SE
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/10/2025
Objection resolved — Addressed
01/03/2025
Special inspection requirement — Fenestration areas
ELIAS RASABI
01/03/2025
Special inspection requirement — Protection of exposed foundation insulation
ELIAS RASABI
01/03/2025
Special inspection requirement — Metering
ELIAS RASABI
01/03/2025
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
01/03/2025
Special inspection requirement — Interior lighting power
ELIAS RASABI
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
01/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
01/03/2025
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/03/2025
Special inspection requirement — Electrical motors and elevators
ELIAS RASABI
01/03/2025
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
01/03/2025
Special inspection requirement — Exterior lighting power
ELIAS RASABI
01/03/2025
Special inspection requirement — Lighting controls
ELIAS RASABI
01/03/2025
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
01/03/2025
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
01/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
12/26/2024
Objection resolved — Addressed
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2024
Objection resolved — Addressed
11/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/19/2024
Objection raised — Other
11/07/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Zoning
10/23/2024
Filed — New Building
Construction of a Single Family House as per the plans filed herewith.
B00577471-P1
10/17/2024
Permit issued — General Construction
B00577471-I1-GC
09/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2024
Objection raised — Scope
08/27/2024
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES, NEW GAS FIXTURES, NEW HOT WATER HEATERS & ASSOCIATED SANITARY, DOMESTIC AND GAS PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH MAIN NB FILING.
B00581640-P1
08/23/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ELIAS RASABI
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/13/2024
Permit issued — Plumbing
B92777090-I1-PL
08/12/2024
Permit issued — Plumbing
B28895587-I1-PL
08/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC06/02/2026
DOB NOWCurb CutPermit IssuedMNC GENERAL CONTR CORP06/24/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC05/20/2025
DOB NOWSupport of ExcavationSigned-offMNC GENERAL CONTR CORP03/04/2025
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP10/17/2024
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC08/13/2024
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC08/12/2024
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC05/31/2024
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP10/20/2023
DOB NOWMechanical SystemsSigned-offMNC GENERAL CONTR CORP10/18/2023
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP10/18/2023
DOB NOWStructuralSigned-offMNC GENERAL CONTR CORP10/18/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/03/2023
DOB NOWMechanical SystemsSigned-offMNC GENERAL CONTR CORP10/24/2022
DOB NOWStructuralSigned-offMNC GENERAL CONTR CORP10/24/2022
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP10/20/2022
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP10/20/2022
DOB NOWConstruction FenceSigned-offMNC GENERAL CONTR CORP09/22/2022
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC05/24/2022
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP05/18/2022
DOB NOWFoundationSigned-offMNC GENERAL CONTR CORP05/13/2022
DOB NOWSupport of ExcavationSigned-offMNC GENERAL CONTR CORP05/13/2022
DOB NOWMechanical SystemsSigned-offMNC GENERAL CONTR CORP05/11/2022
DOB NOWStructuralSigned-offMNC GENERAL CONTR CORP05/11/2022
DOB NOWConstruction FenceSigned-offPRESTON NYC LLC12/21/2021
BIS—ISSUEDPRESTON NYC LLC01/10/2022
BISOTISSUEDWHIRLWIND CONTRACTING CORP05/20/1993
1 project · most recent 04/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2026Signed-offNESS MECHANICAL P & H INCGas, Water/Sanitary
1 project · most recent 01/20/2023
General Wiring
FiledStatusContractorScope
01/20/2023Permit IssuedLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
02/27/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
02/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
01/03/2025Fenestration areasELIAS RASABIenergy_progress
01/03/2025Protection of exposed foundation insulationELIAS RASABIenergy_progress
01/03/2025MeteringELIAS RASABIenergy_progress
01/03/2025Lighting in dwelling unitsELIAS RASABIenergy_progress
01/03/2025Interior lighting powerELIAS RASABIenergy_progress
01/03/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
01/03/2025Fire-Resistance Rated ConstructionELIAS RASABIprogress
01/03/2025Energy Code Compliance InspectionsELIAS RASABIprogress
01/03/2025Electrical motors and elevatorsELIAS RASABIenergy_progress
01/03/2025Air barrier - visual inspectionELIAS RASABIenergy_progress
01/03/2025Exterior lighting powerELIAS RASABIenergy_progress
01/03/2025Lighting controlsELIAS RASABIenergy_progress
01/03/2025Fenestration air leakageELIAS RASABIenergy_progress
01/03/2025Insulation placement and R valuesELIAS RASABIenergy_progress
01/03/2025Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
08/23/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesELIAS RASABIspecial
08/23/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
05/23/2022Sprinkler SystemsELIAS RASABIspecial
05/23/2022Fire-Resistant Penetrations and JointsELIAS RASABIspecial
03/22/2022Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
03/22/2022Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
03/22/2022Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
03/22/2022Subgrade InspectionsELIAS RASABIspecial
12/03/2021Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
09/14/2021Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
Latest 25 of 28.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00620625-I1Request digital key ↗
08/31/2026B00581756-I1Request digital key ↗
08/31/2026B00581633-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
08/20/2024340910642Open ↗
04/14/2022340839613Open ↗
11/23/2021322102489Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/20/2024340910642Open ↗
08/20/2024340910642Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/20/2024340910642Open ↗
▸BISWORK PERMIT APPLICATION1
01/12/2022322102489Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
08/13/2026B00577471-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
08/13/2026B00577471-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00577471-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00620625-I1Open ↗
08/31/2026B00581756-I1Open ↗
08/31/2026B00582567-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/25/2026B00744365-I1Open ↗
09/05/2026B00703943-I1Open ↗
09/05/2026B00703943-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026B00577471-I1Open ↗
08/26/2026B00577471-I1Open ↗
08/26/2026B00577471-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/20/2024340910642Open ↗
04/14/2022340839613Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
08/13/2026B00577471-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
01/12/2022322102489Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/20/2024340910642Open ↗
▸BISSTREET TREE CHECKLIST1
08/20/2024340910642Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00577471-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00577471-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00577471-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/12/2022322102489Open ↗
▸BISRODENT CONTROL1
01/12/2022322102489Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00581633-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/14/2026B00582567-I1Open ↗
08/13/2026B00577471-I1Open ↗
08/13/2026B00703943-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/14/2026B00582567-I1Open ↗
08/13/2026B00703943-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/14/2026B00582567-I1Open ↗
08/13/2026B00703943-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/12/2022322102489Open ↗
01/12/2022322102489Open ↗
01/12/2022322102489Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
01/12/2022322102489Open ↗
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/12/2022322102489Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
01/12/2022322102489Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
08/20/2024340910642Open ↗
04/14/2022340839613Open ↗
▸BISEFILING COVER SHEET1
11/23/2021322102489Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/20/2024340910642Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
08/13/2026B00577471-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
08/20/2024340910642Open ↗
04/14/2022340839613Open ↗
▸DOB NOWSite Survey: Initial2
08/23/2026B00577471-I1Open ↗
08/13/2026B00577471-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00577471-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00703943-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00577471-I1Open ↗