← Back
Old law tenement
Br Affordable
1056 BOSTON ROAD · BIN 2004404
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R6Zoning
11,070 sfGross Floor Area
10Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Old law tenement · Owner of record: BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION · 2,366 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 3 docs
Bulkhead1p · 1 filing · 3 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARRY CONSTRUCTION GROUP607/08/2026
LEMLE WOLFF CONSTRUCTION1007/08/2026
APARTMENT REHABILITATION CORP1704/09/2026
BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC610/01/2025
R.J. MCGEE ENGINEERING, PLLC406/25/2025
ASR ENGINEERING PC107/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2003/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
HARRY CONSTRUCTION GROUPGeneral Contractor203/21/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803706/25/2025
Building Lifecycle
All (120)Filed (11)Permit Issued (7)Signed Off (6)Violation (56)Inspection (4)Objection (6)Special Inspection (30)
04/08/2026
Signed off — Alteration
Interior renovation work of corridors, cellar, roof replacement, parapet work, and facade work as per plan. Boiler, and water heater replacement under separate filing X01002969-I1 .No change to use, egress, or occupancy under this filing.
X00990991-I1
01/08/2026
Signed off — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X01047911-I1, X00990991-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048241-I1
10/23/2025
Signed off — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080469-I1
10/23/2025
Permit issued — Suspended Scaffold
X01080469-I1-SC
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/01/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X01047911-I1, X00990991-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048241-P2
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2025
Signed off — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00990991, X01048234;& INITIAL FILING FOR 1 BOILER REPLACEMENT. ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047911-S1
09/11/2025
Signed off — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00990991, X01048234;& INITIAL FILING FOR 1 BOILER REPLACEMENT. ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047911-I1
09/10/2025
Filed — Alteration
REPLACEMENT OF EXISTING INDIRECT HWH WITH 2 NEW INDIRECT HWHS PROVIDED AS PER PLAN. IN CONJUNCTION TO ALT2 FILINGS X01047911-I1, X00990991-I1 NO CHANGE TO USE EGRESS OF OCCUPANCY UNDER THIS FILING.
X01048241-P1
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/16/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/09/2025
Permit issued — Boiler Equipment
X01047911-S1-BE
06/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/26/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
06/26/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
06/25/2025
Filed — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00990991, X01048234;& INITIAL FILING FOR 1 BOILER REPLACEMENT. ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047911-P1
06/22/2025
Filed — Alteration
SUBSEQUENT FILING FOR 1 NEW BOILER PROVIDED AS PER PLAN IN CONJUNCTION TO ALT 2 FILINGS X00990991, X01048234;& INITIAL FILING FOR 1 BOILER REPLACEMENT. ALL AS PER PLAN NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01047911-S1
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/28/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
04/11/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01078623-I1
12/09/2024
Permit issued — Plumbing
X01048241-I1-PL
12/09/2024
Permit issued — Boiler Equipment
X01047911-I1-BE
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
C
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
A
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
C
11/28/2024
Violation issued (HPD, closed)
B
11/28/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
B
10/16/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP10/23/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/09/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING12/09/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING12/09/2024
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP08/07/2024
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/15/2024
DOB NOWMechanical SystemsSigned-offLEMLE WOLFF CONSTR06/24/2024
BIS—ISSUEDGREAT AMERICAN CONST. CORP.06/01/1994
BISPLISSUEDSKYVIEW HTG&AIR CON CORP07/21/1993
BISEQRE-ISSUEDGREAT AMERICAN CONST. CORP.10/01/1992
BIS—ISSUEDGREAT AMERICAN CONST. CORP.10/01/1992
3 projects · most recent 03/27/2025
Boiler Controls
FiledStatusContractorScope
03/27/2025CompleteSTX ELECTRICAL CORPBoiler Controls
02/11/2025CompleteSTX ELECTRICAL CORP—
07/17/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
10/02/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/29/2025Tenant Protection Plan Compliance—special
09/05/2025Tenant Protection Plan Compliance—special
06/26/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/26/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/26/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/26/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/26/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/26/2025Heating SystemsSAMI HAJJAR P.Especial
05/28/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/28/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/28/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/28/2025Heating SystemsSAMI HAJJAR P.Especial
05/28/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/22/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/22/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/22/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/22/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/22/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/22/2025Heating SystemsSAMI HAJJAR P.Especial
10/16/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/16/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/16/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/16/2024FinalSAMI HAJJAR P.Eprogress
10/16/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
Latest 25 of 50.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026X01047911-P1Request digital key ↗
08/21/2026X01047911-S1Request digital key ↗
08/21/2026X01047911-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026X00990991-P1Open ↗
08/20/2026X00990991-I1Open ↗
08/18/2026X01048241-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X01047911-I1Open ↗
09/23/2026X01047911-S1Open ↗
09/23/2026X01047911-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X01047911-S1Open ↗
09/23/2026X01047911-I1Open ↗
09/15/2026X00990991-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026X00990991-P1Open ↗
08/20/2026X00990991-I1Open ↗
08/18/2026X01048241-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00990991-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026X00990991-P1Open ↗
08/20/2026X00990991-I1Open ↗
08/13/2026X00990991-P2Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01080469-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01080469-I1Open ↗