← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1058 UNIVERSITY AVENUE
BRONX · BIN 2129665
💬 Discuss this project
2022Year Built
7Stories
D1Building Class
R7-1Zoning
22,755 sfGross Floor Area
26Units
Rent Stabilized4 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1058 Goldstar · 5,380 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1069 Realty 05 LLC63p · 5 filings · 20 docs
Bulkhead1069 Realty 05 LLC1p · 1 filing · 4 docs
Floor 71069 Realty 05 LLC55p · 4 filings · 20 docs
Floor 61069 Realty 05 LLC56p · 4 filings · 20 docs
Floor 51069 Realty 05 LLC54p · 4 filings · 20 docs
Floor 41069 Realty 05 LLC53p · 4 filings · 20 docs
Floor 31069 Realty 05 LLC53p · 4 filings · 20 docs
Floor 2Unit 254p · 4 filings · 20 docs
Floor 1Unit 156p · 6 filings · 20 docs
Cellar1069 Realty 05 LLC55p · 4 filings · 20 docs
Site & exterior1069 Realty 05 LLC17p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1069 Realty 054807/08/2026
1058 Bronx1103/21/2026
48 Realty807/08/2026
1058 Goldstar403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/19/2022$2.0M—1058 BRONX LLC → 1058 GOLDSTAR LLC$88/sf building
10/05/2018$1.5M—YANKEE POINT LLC → 1058 BRONX LLC— not available
07/11/2017$980K—Private party → YANKEE POINT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BSD Consulting803/21/2026
Avalon Designs1403/21/2026
Green Studio403/21/2026
SMR Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YCK DevelopersGeneral Contractor1607/08/2026
Manhattan D EnterprisesScaffold407/08/2026
Design N SafetyScaffold403/21/2026
Star Electrical ContractorsGeneral Contractor303/22/2026
YCK DevelopersScaffold303/21/2026
A Plus 1 ManagementScaffold303/21/2026
DoriaScaffold207/08/2026
A. M. Plumbing CompanyPlumbing207/08/2026
S&R Electrical & MechanicalsElectrical203/21/2026
Prime Piping & HeatingFire Protection107/08/2026
Willy L ZambranoElectrical103/21/2026
Mabe GroupGeneral Contractor107/08/2026
Creative Plumbing inPlumbing107/08/2026
S&R Electrical & MechanicalsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394407/31/2023
Skyline Rigging7880103/09/2023
HRF Services5616406/17/2020
Building Lifecycle
08/27/2026
Elevator Category 1 inspection report filed
06/11/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
06/11/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM…
HPD violation · open
06/11/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES TO HOPPER DOOR AT COMPACTOR CLOSET, 1st STORY
HPD violation · closed
06/11/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND IT'S ASSEMBLIES TO BULKHEAD DOOR AT 1st PUBLIC HALL BULKHEAD FROM…
HPD violation · closed
177 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYCK Developers10/24/2023
DOB NOWCurb CutSigned-offYCK Developers10/24/2023
DOB NOWMechanical SystemsSigned-offYCK Developers05/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offDoria05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offDoria03/09/2023
DOB NOWConstruction FenceSigned-offYCK Developers02/06/2023
DOB NOWStructuralSigned-offYCK Developers02/06/2023
DOB NOWSprinklersSigned-offAmb Mechanical01/25/2023
DOB NOWPlumbingSigned-offA. M. Plumbing Company01/18/2023
DOB NOWConstruction FenceSigned-offA Plus 1 Management01/03/2023
DOB NOWStructuralSigned-offAB Builders NY01/03/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises12/23/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises12/23/2022
DOB NOWPlumbingSigned-offA. M. Plumbing Company12/05/2022
DOB NOWPlumbingSigned-offAB Plumbing09/01/2022
DOB NOWConstruction FenceSigned-offDesign N Safety05/10/2021
DOB NOWConstruction FenceSigned-offDesign N Safety03/12/2021
BIS—ISSUEDYCK Developers02/13/2023
BIS—ISSUEDMabe Group10/27/2022
BIS—ISSUEDA Plus 1 Management10/20/2022
BIS—ISSUEDAvid Developers & Construction05/31/2022
BIS—ISSUEDAvid Developers & Construction05/31/2022
BIS—ISSUEDAvid Developers & Construction05/27/2022
BISOTISSUEDAJ Construction Design Builders03/27/1996
4 projects · most recent 04/07/2023
General Wiring
FiledStatusContractorScope
04/07/2023CompleteStar Electrical Contractors—
01/19/2023CompleteS&R Electrical & MechanicalsGeneral Wiring
01/19/2023CompleteS&R Electrical & Mechanicals—
12/21/2022CompleteSolas Electrical—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/08/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/01/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/04/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/25/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/26/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/21/2023Heating SystemsFAHAD FATEHspecial
03/21/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/21/2023FinalFAHAD FATEHprogress
03/21/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/21/2023Shutoff dampersFAHAD FATEHenergy_progress
03/21/2023Maintenance informationFAHAD FATEHenergy_progress
03/21/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
03/21/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
03/21/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
03/21/2023Mechanical SystemsFAHAD FATEHspecial
03/21/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/15/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/15/2023Sprinkler SystemsFAHAD FATEHspecial
02/08/2023Sprinkler SystemsPaul Raymondspecial
02/08/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
02/01/2023Fire-Resistance Rated ConstructionPaul Raymondprogress
02/01/2023Maintenance informationPaul Raymondenergy_progress
02/01/2023HVAC and service water heating system controls Paul Raymondenergy_progress
02/01/2023HVAC insulation and sealing Paul Raymondenergy_progress
02/01/2023HVAC and service water heating equipment Paul Raymondenergy_progress
02/01/2023FinalPaul Raymondprogress
02/01/2023Energy Code Compliance InspectionsPaul Raymondprogress
02/01/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
Latest 25 of 30.
175 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account