← Back
QUEENS
106-02 ROCKAWAY BEACH BOULEVARD
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 6 docs
Floor 621p · 1 filing · 20 docs
Floor 520p · 1 filing · 20 docs
Floor 420p · 1 filing · 20 docs
Floor 320p · 1 filing · 20 docs
Floor 220p · 1 filing · 20 docs
Floor 1Under Construction27p · 2 filings · 20 docs
Cellar22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1 HOLLAND9309/13/2026
STEEL CONSTRUCTION1007/08/2026
TRISTAR DEVELOPING803/22/2026
IMPERIEX CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROFESSIONAL DESIGN CONSULTANTS LL403/21/2026
T F CUSANELLI FILLETTI ARCHITECT803/21/2026
LOUIS STRIAR803/21/2026
ACE CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STANDARD CONCRETE AND EXCGeneral Contractor2407/08/2026
A M A HOLDINGSScaffold407/08/2026
STEEL CONSTRUCTION LLCGeneral Contractor407/08/2026
P & D MECHANICAL CORPFire Protection207/08/2026
DC BUILDING SERVICES INCFire Protection207/08/2026
TRISTAR DEVELOPING INCGeneral Contractor203/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
SOLAR ENERGY SYSTEMS INCGeneral Contractor107/02/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOMERUN SOLAR8772106/29/2026
WHITESTONE ASSOCIATES ENG81441103/04/2026
Building Lifecycle
All (236)Filed (31)Permit Issued (35)Signed Off (6)Violation (28)Inspection (26)Objection (80)Special Inspection (30)
07/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/30/2026
Permit issued — Solar
Q01369045-I1-SL
06/29/2026
Filed — Alteration
Q01369045-I1
06/29/2026
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
05/11/2026
Signed off — Alteration
INDIRECTLY ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - SELF-STORAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01246565-I1
05/11/2026
Signed off — Alteration
INDIRECTLY ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINE - SELF-STORAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01246566-I1
05/11/2026
Signed off — Alteration
Q01246567-I1
05/11/2026
Signed off — Alteration
Q01246568-I1
05/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2026
Permit issued — Sign
Q01246566-I1-SG
05/04/2026
Permit issued — Sign
Q01246567-I1-SG
05/04/2026
Permit issued — Sign
Q01246568-I1-SG
05/04/2026
Permit issued — Sign
Q01246565-I1-SG
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/26/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/09/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/09/2026
Special inspection requirement — Air barrier continuity plan testing
Mudar Khantamr
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
03/09/2026
Special inspection requirement — Final
RAYMOND PANCHARI
03/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Mudar Khantamr
03/09/2026
Special inspection requirement — Concrete - Cast-In-Place
Mudar Khantamr
03/09/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mudar Khantamr
03/09/2026
Special inspection requirement — Deep Foundation Elements
03/09/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Mudar Khantamr
03/09/2026
Special inspection requirement — Sprayed fire-resistant materials
Mudar Khantamr
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mudar Khantamr
03/09/2026
Special inspection requirement — Exterior lighting power
Mudar Khantamr
03/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Mudar Khantamr
03/09/2026
Special inspection requirement — Masonry
Mudar Khantamr
03/09/2026
Special inspection requirement — Electrical motors and elevators
Mudar Khantamr
03/09/2026
Special inspection requirement — Subgrade Inspections
Mudar Khantamr
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Mudar Khantamr
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
03/09/2026
Special inspection requirement — Lowest Floor Elevation
Mudar Khantamr
03/09/2026
Special inspection requirement — Lighting controls
Mudar Khantamr
03/09/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
03/09/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
03/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
03/09/2026
Special inspection requirement — Interior lighting power
Mudar Khantamr
03/09/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
03/09/2026
Special inspection requirement — Metering
Mudar Khantamr
03/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2026
Filed — New Building
HEREWITH FILING FOR THE INSTALLATION OF NEW PLUMBING SYSTEM IN PROPOSED 6-STORY SELF STORAGE BUILDING.
Q00608821-P5
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/03/2026
Permit issued — Sprinklers
Q00608821-S3-EW-SP
03/03/2026
Permit issued — Sprinklers
Q00608821-S3-EW-SD
02/25/2026
Signed off — Alteration
Q00737008-I1
02/25/2026
Special inspection requirement — Masonry
Mudar Khantamr
02/25/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mudar Khantamr
01/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/12/2026
Filed — Alteration
NEW CURB CUT INSTALLATION
Q00672056-P1
Latest 60 of 236 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSOLAR ENERGY SYSTEMS INC06/30/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC05/04/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC05/04/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC05/04/2026
DOB NOWSignSigned-offA.M.A HOLDINGS INC05/04/2026
DOB NOWSprinklersSigned-offDC BUILDING SERVICES INC03/03/2026
DOB NOWSprinklersSigned-offDC BUILDING SERVICES INC03/03/2026
DOB NOWCurb CutPermit IssuedSTANDARD CONCRETE AND EXC12/16/2025
DOB NOWCurb CutPermit IssuedSTANDARD CONCRETE AND EXC12/15/2025
DOB NOWCurb CutPermit IssuedSTANDARD CONCRETE AND EXC12/15/2025
DOB NOWCurb CutPermit IssuedSTANDARD CONCRETE AND EXC12/15/2025
DOB NOWStandpipeSigned-offBLETSAS P&H CORP10/24/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/09/2025
DOB NOWConstruction FenceSigned-offSTANDARD CONCRETE AND EXC05/14/2025
DOB NOWMechanical SystemsSigned-offTRISTAR DEVELOPING INC04/15/2025
DOB NOWSuspended ScaffoldPermit IssuedIMPERIEX CONSTRUCTION INC01/03/2025
DOB NOWGeneral ConstructionPermit IssuedSTANDARD CONCRETE AND EXC12/09/2024
DOB NOWEarth WorkSigned-offSTANDARD CONCRETE AND EXC12/09/2024
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/07/2024
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP10/30/2024
DOB NOWStandpipeSigned-offP & D MECHANICAL CORP10/29/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/30/2024
DOB NOWGeneral ConstructionPermit IssuedSTANDARD CONCRETE AND EXC05/31/2024
DOB NOWGeneral ConstructionSigned-offSTANDARD CONCRETE AND EXC05/31/2024
DOB NOWConstruction FenceSigned-offSTANDARD CONCRETE AND EXC05/20/2024
DOB NOWGeneral ConstructionPermit IssuedSTANDARD CONCRETE AND EXC12/19/2023
DOB NOWConstruction FenceSigned-offSTANDARD CONCRETE AND EXC12/15/2023
DOB NOWFoundationSigned-offSTANDARD CONCRETE AND EXC12/15/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC11/17/2023
DOB NOWGeneral ConstructionPermit IssuedSTANDARD CONCRETE AND EXC08/30/2023
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC08/18/2023
DOB NOWStructuralSigned-offSTANDARD CONCRETE AND EXC06/29/2023
DOB NOWConstruction FenceSigned-offSTANDARD CONCRETE AND EXC04/14/2023
DOB NOWSupport of ExcavationPermit IssuedSTANDARD CONCRETE AND EXC04/06/2023
DOB NOWConstruction FenceSigned-offSTANDARD CONCRETE AND EXC07/14/2022
1 project · most recent 03/04/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2026Signed-offTRISTAR DEVELOPING INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg LW1821HRSM 18,000 BTU · Ptac ×1
Heat / Cool
Samsung AM144BXVGFR/AA 144,000 BTU · Vrf Outdoor ×11
AM072BXVGFR/AA 72,000 BTU · Vrf Outdoor ×1
Heating
Indeeco UHP961 SERIES P-961U5000V-T 8,553 BTU · Electric Heater ×13
WLI SERIES 934U02000V 5,115 BTU · Electric Heater ×12
Ventilation
Fantech SER1100 1,400 CFM · Erv ×6
Greenheck SQ-18-07-0700-B 15,000 CFM · Exhaust Fan ×1
SQ-98-VG 300 CFM · Exhaust Fan ×1
Canarm GSQ180-D1100EC 3,000 CFM ×1
S&P Usa Ventilation Systems SQB36 4,500 BTU · Exhaust Fan ×1
1 project · most recent 03/04/2026
Sprinkler System
FiledStatusContractorScope
03/04/2026Signed-offDC BUILDING SERVICES INCSprinkler System
1 project · most recent 03/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/04/2026Signed-offT & T PLUMBING INCStorm, Water/Sanitary
8 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedANTONIO CERIELLO ELEC INC3 meters, 1 new_meters
04/10/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
11/04/2025CompleteWCK ELECTRIC CORP.General Wiring
06/05/2024CompleteKWONG MING ELECTRIC INC—
02/02/2024CancelledARSENIO NYC ELECTRICAL IN1 meters, 1 new_meters
12/04/2023CompleteRICHARD NEU—
11/30/2023CompleteARSENIO NYC ELECTRICAL IN1 meters, 1 new_meters
07/13/2022CompleteURBAN TECH ELECTRIC INCGeneral Wiring
1 project · most recent 03/04/2026
Steel Concrete
FiledStatusContractorScope
03/04/2026Signed-offDC BUILDING SERVICES INCSteel, Concrete
1 project · most recent 03/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/12/2025Permit IssuedIMPERIEX CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
07/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/26/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/09/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/09/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/07/2026Pass-Final PL - UndergroundPassView ↗
01/05/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
12/31/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
06/29/2026Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
06/29/2026Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
03/09/2026Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
03/09/2026Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
03/09/2026Electrical motors and elevatorsMudar Khantamrenergy_progress
03/09/2026Air barrier continuity plan testingMudar Khantamrenergy_progress
03/09/2026Concrete - Cast-In-PlaceMudar Khantamrspecial
03/09/2026Deep Foundation Elements—special
03/09/2026Subsurface Investigations (Borings/Test Pits)Mudar Khantamrspecial
03/09/2026Sprayed fire-resistant materialsMudar Khantamrspecial
03/09/2026Fire-Resistant Penetrations and JointsMudar Khantamrspecial
03/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMudar Khantamrspecial
03/09/2026Wall Panels, Curtain Walls, and VeneersMudar Khantamrspecial
03/09/2026MasonryMudar Khantamrspecial
03/09/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mudar Khantamrspecial
03/09/2026Subgrade InspectionsMudar Khantamrspecial
03/09/2026Fire-Resistance Rated ConstructionMudar Khantamrprogress
03/09/2026Energy Code Compliance InspectionsMudar Khantamrprogress
03/09/2026Lowest Floor ElevationMudar Khantamrprogress
03/09/2026Lighting controlsMudar Khantamrenergy_progress
03/09/2026Fenestration air leakageMudar Khantamrenergy_progress
03/09/2026Insulation placement and R valuesMudar Khantamrenergy_progress
03/09/2026Fenestration and door U-factor and product ratingsMudar Khantamrenergy_progress
03/09/2026Interior lighting powerMudar Khantamrenergy_progress
03/09/2026Fenestration areasMudar Khantamrenergy_progress
Latest 25 of 111.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/26/2026Q00737008-I1Request digital key ↗
08/26/2026Q00737008-P1Request digital key ↗
08/23/2026Q00672067-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
02/08/2024440812747Open ↗
12/14/2023440812747Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/14/2023440812747Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026Q00608821-S7Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-P5Open ↗
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/26/2026Q00737008-P1Open ↗
08/26/2026Q00737008-I1Open ↗
08/23/2026Q00672067-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026Q00608821-P1Open ↗
09/01/2026Q00608821-S2Open ↗
09/01/2026Q00608821-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q00608821-P1Open ↗
09/23/2026Q00608821-P1Open ↗
09/01/2026Q00608821-S2Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/14/2023440812747Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2023440812747Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-S4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00608821-S4Open ↗
08/13/2026Q00608821-I1Open ↗
▸BISSTREET TREE CHECKLIST1
12/14/2023440812747Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed5
08/13/2026Q00608821-S7Open ↗
08/13/2026Q00608821-S1Open ↗
08/13/2026Q00608821-S2Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/14/2023440812747Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/23/2026Q00608821-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-S7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00608821-I1Open ↗
08/13/2026Q00608821-S7Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00608821-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/14/2023440812747Open ↗
▸BISADDITIONAL INFORMATION1
02/08/2024440812747Open ↗
▸Other Documents34
▸DOB NOWFlood Plan Emergency Temporary Flood Shields12
08/23/2026Q00608821-P4Open ↗
08/23/2026Q00608821-S2Open ↗
08/23/2026Q00608821-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/23/2026Q00608821-P3Open ↗
08/23/2026Q00608821-I1Open ↗
08/13/2026Q00608821-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/23/2026Q00608821-I1Open ↗
08/23/2026Q00608821-P3Open ↗
08/13/2026Q00608821-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00608821-I1Open ↗
08/23/2026Q00608821-P3Open ↗
08/13/2026Q00608821-P5Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00608821-I1Open ↗
08/13/2026Q00608821-S3Open ↗
▸DOB NOWManufacturer's Specifications2
08/20/2026Q01158875-I1Open ↗
08/13/2026Q01158875-P1Open ↗
▸DOB NOWCalculations2
08/20/2026Q01158875-I1Open ↗
08/13/2026Q01158875-P1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)2
08/13/2026Q00608821-S4Open ↗
08/13/2026Q00608821-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00608821-S7Open ↗
08/13/2026Q00608821-S4Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00608821-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00608821-S4Open ↗