← Back
Three families
106-05 49TH AVENUE
QUEENS · Corona · BIN 4049122
💬 Discuss this project
2023Year Built
3Stories
C0Building Class
R5Zoning
2,500 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 106-05 49TH AVE REALTY LLC · 2,535 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Floor 319p · 2 filings · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYNAMO CONST GROUP103/22/2026
10605 49TH AVE REALTY803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2015$845K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC704/23/2025
VATCHE GHAZARIAN, PE104/06/2023
FLUSHING ENGINEERING SERVICE PC105/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM1203/21/2026
PLL CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRAVITY CONSTRUCTION US IGeneral Contractor507/08/2026
TRI-NORTH CONTRACTING CORGeneral Contractor507/08/2026
DYNAMO CONST GROUP LLCGeneral Contractor407/08/2026
DYNASTY CONTRACTING LLCGeneral Contractor407/08/2026
CHAMP PLUMBING & HTG CORPPlumbing207/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519804/23/2025
BUILDING CONSULTING ENGIN1034204/23/2025
Building Lifecycle
All (75)Filed (9)Permit Issued (13)Signed Off (5)Violation (1)Inspection (11)Objection (6)Special Inspection (30)
05/13/2026
Signed off — Alteration
INSTALL PLUMBING FIXTURES, GAS APPLIANCES/EQUIPMENT, SPRINKLER SYSTEM AND RELATED PIPING.
Q08013037-I1
03/17/2026
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH (5) NEW BUILDING APPLICATIONS DOB NOW JOB # Q00706130, Q00705808, Q00704837, Q00704837, Q00680015 & Q00635002
Q00802698-I1
03/09/2026
Signed off — Alteration
INSTALL NEW CURB CUT
Q01213617-I1
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/12/2025
Signed off — Alteration
HEREWITH FILED FOR BERMING/SLOPING/BENCHING (SE) PLANS IN CONJUNCTION WITH NB DOB JOB NO Q00635002, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00855158-I1
06/11/2025
Signed off — Alteration
Q00043480-I1
06/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2025
Permit issued — Curb Cut
Q01213617-I1-CC
05/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2025
Permit issued — Sprinklers
Q08013037-I1-PL
04/25/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
TONY ONYEAGORO
04/25/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
04/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
04/23/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES, GAS APPLIANCES/EQUIPMENT, SPRINKLER SYSTEM AND RELATED PIPING.
Q08013037-P1
04/22/2025
Filed — Alteration
INSTALL NEW CURB CUT
Q01213617-I1
04/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
04/21/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
TONY ONYEAGORO
04/21/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
01/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/02/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/02/2025
Special inspection requirement — Masonry
Younes Abouyaala
01/02/2025
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
01/02/2025
Special inspection requirement — Ventilation and air distribution system
Vatche Ghazarian
01/02/2025
Special inspection requirement — Wood – Seismic Resistance
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/02/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
01/02/2025
Special inspection requirement — Protection of exposed foundation insulation
Vatche Ghazarian
01/02/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Vatche Ghazarian
01/02/2025
Special inspection requirement — Final
Vatche Ghazarian
01/02/2025
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
01/02/2025
Special inspection requirement — Fenestration air leakage
Vatche Ghazarian
01/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vatche Ghazarian
01/02/2025
Special inspection requirement — Insulation placement and R values
Vatche Ghazarian
01/02/2025
Special inspection requirement — Footing and Foundation
Vatche Ghazarian
01/02/2025
Special inspection requirement — Air barrier - visual inspection
Vatche Ghazarian
01/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vatche Ghazarian
01/02/2025
Special inspection requirement — Interior lighting power
Vatche Ghazarian
01/02/2025
Special inspection requirement — Metering
Vatche Ghazarian
01/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vatche Ghazarian
01/02/2025
Special inspection requirement — Fenestration areas
Vatche Ghazarian
01/02/2025
Special inspection requirement — Structural Wood Frame
Vatche Ghazarian
12/23/2024
Filed — New Building
NEW BUILDING - THREE STORY, THREE FAMILY RESIDENCE
Q00635002-P2
12/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/27/2024
Permit issued — Foundation
Q00635002-I1-GC-CX
05/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/12/2024
Permit issued — Sprinklers
Q08013037-I1-EW-SP
03/18/2024
Permit issued — Sprinklers
Q08013037-I1-PL
10/04/2023
Violation issued (ECB, closed)
Construction
09/28/2023
Permit issued — Construction Fence
Q00802698-I1-FN
09/28/2023
Permit issued — Mechanical Systems
Q00635002-I1-GC-CX
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
08/30/2023
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTRI-NORTH CONTRACTING COR05/19/2025
DOB NOWSprinklersSigned-offCHAMP PLUMBING & HTG CORP05/08/2025
DOB NOWFoundationPermit IssuedTRI-NORTH CONTRACTING COR08/27/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.04/12/2024
DOB NOWSprinklersSigned-offCHAMP PLUMBING & HTG CORP03/18/2024
DOB NOWConstruction FenceSigned-offTRI-NORTH CONTRACTING COR09/28/2023
DOB NOWMechanical SystemsPermit IssuedGRAVITY CONSTRUCTION US I09/28/2023
DOB NOWFoundationPermit IssuedGRAVITY CONSTRUCTION US I08/29/2023
DOB NOWEarth WorkPermit IssuedDYNAMO CONST GROUP LLC04/29/2023
DOB NOWSupport of ExcavationSigned-offDYNAMO CONST GROUP LLC04/29/2023
DOB NOWConstruction FenceSigned-offGRAVITY CONSTRUCTION US I04/28/2023
DOB NOWConstruction FenceSigned-offDYNASTY CONTRACTING LLC10/12/2021
DOB NOWConstruction FenceSigned-offDYNASTY CONTRACTING LLC05/15/2018
BIS—ISSUEDDYNASTY CONTRACTING LLC11/12/2021
1 project · most recent 12/23/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/23/2024Permit IssuedTRI-NORTH CONTRACTING CORVentilation Systems
Ventilation
Delta Breeze SLM70 80 CFM · Exhaust Fan ×7
1 project · most recent 04/23/2025
FiledStatusContractorScope
04/23/2025Signed-offRRP PLUMBING CORP36 heads
1 project · most recent 04/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/23/2025Signed-offCHAMP PLUMBING & HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteHV ELECTRIC CORPGeneral Wiring
1 project · most recent 12/23/2024
Steel Concrete Wood
FiledStatusContractorScope
12/23/2024Permit IssuedTRI-NORTH CONTRACTING CORSteel, Concrete, Wood
1 project · most recent 12/23/2024
Earthwork
FiledStatusContractorScope
12/23/2024Permit IssuedTRI-NORTH CONTRACTING COREarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
04/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
04/25/2025Sprinkler SystemsYounes Abouyaalaspecial
04/25/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesTONY ONYEAGOROspecial
04/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
04/21/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesTONY ONYEAGOROspecial
04/21/2025Sprinkler SystemsYounes Abouyaalaspecial
01/02/2025Structural Steel - WeldingYounes Abouyaalaspecial
01/02/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/02/2025Wood – Seismic Resistance—special
01/02/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/02/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
01/02/2025Structural Wood FrameVatche Ghazarianprogress
01/02/2025Footing and FoundationVatche Ghazarianprogress
01/02/2025FinalVatche Ghazarianprogress
01/02/2025Fire-Resistance Rated ConstructionVatche Ghazarianprogress
01/02/2025Protection of exposed foundation insulationVatche Ghazarianenergy_progress
01/02/2025Fenestration air leakageVatche Ghazarianenergy_progress
01/02/2025HVAC-R and service water heating equipmentVatche Ghazarianenergy_progress
01/02/2025Insulation placement and R valuesVatche Ghazarianenergy_progress
01/02/2025Ventilation and air distribution systemVatche Ghazarianenergy_progress
01/02/2025Air barrier - visual inspectionVatche Ghazarianenergy_progress
01/02/2025HVAC-R and service water heating system controlsVatche Ghazarianenergy_progress
01/02/2025Interior lighting powerVatche Ghazarianenergy_progress
01/02/2025MeteringVatche Ghazarianenergy_progress
01/02/2025Fenestration and door U-factor and product ratingsVatche Ghazarianenergy_progress
Latest 25 of 101.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q00802698-I1Request digital key ↗
08/24/2026Q00855158-I1Request digital key ↗
08/21/2026Q00635002-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
03/04/2026421792527Open ↗
03/02/2026421311333Open ↗
05/23/2024440758609Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/20/2026440758609Open ↗
▸BISWORK PERMIT APPLICATION1
03/10/2022421945131Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/20/2024440758609Open ↗
▸Zoning, Tax Lot & Property Records23
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00635002-P2Open ↗
08/13/2026Q01213617-I1Open ↗
08/13/2026Q00635002-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P1Open ↗
08/13/2026Q00635002-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/13/2026Q00635002-P2Open ↗
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 33
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P2Open ↗
08/13/2026Q00635002-P1Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
08/27/2021421792527Open ↗
08/27/2021421792527Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P2Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/08/2016421346617Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/06/2024440758609Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/08/2016421359522Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/06/2024440758609Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/06/2024440758609Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00635002-I1Open ↗
▸Seals & Professional Certifications60
▸DOB NOWSpecial Inspector Seal & Signature39
09/01/2026Q00635002-P2Open ↗
09/01/2026Q00635002-P2Open ↗
09/01/2026Q00635002-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00635002-P2Open ↗
09/01/2026Q00635002-P2Open ↗
09/01/2026Q00635002-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026Q00635002-P2Open ↗
08/21/2026Q00635002-P1Open ↗
08/21/2026Q00635002-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/02/2016421311333Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/23/2024440758609Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/02/2016421311333Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/23/2024440758609Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P2Open ↗
08/13/2026Q00635002-P1Open ↗
▸BISGAS CUT-OFF1
03/10/2022421945131Open ↗
▸BISELECTRIC CUT-OFF1
03/10/2022421945131Open ↗
▸BISSEWER CUT-OFF1
03/10/2022421945131Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist3
08/21/2026Q00635002-P2Open ↗
08/21/2026Q00635002-I1Open ↗
08/14/2026Q00635002-P1Open ↗
▸BISSTREET TREES SITE PLAN2
01/20/2026440758609Open ↗
01/20/2026440758609Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/10/2022421945131Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/10/2022421945131Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/10/2022421945131Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/06/2024440758609Open ↗
▸BISSTREET TREE CHECKLIST1
06/06/2024440758609Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00635002-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00635002-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00635002-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/10/2022421945131Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/10/2022421945131Open ↗
03/10/2022421945131Open ↗
03/10/2022421945131Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/10/2022421945131Open ↗
▸BISLANDMARKS APPROVAL1
03/10/2022421945131Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/20/2026440758609Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/20/2026440758609Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/10/2022421945131Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
09/17/2021421945131Open ↗
08/27/2021421792527Open ↗
08/08/2016421359522Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/10/2022421945131Open ↗
09/17/2021421945131Open ↗
08/27/2021421792527Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/23/2024440758609Open ↗
▸Other Documents24
▸BISBPP - SUPPORTING DOCUMENTATION10
01/20/2026440758609Open ↗
01/20/2026440758609Open ↗
01/20/2026440758609Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026Q00635002-P2Open ↗
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00635002-P2Open ↗
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00635002-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00635002-P2Open ↗
08/21/2026Q00635002-I1Open ↗
08/14/2026Q00635002-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00635002-I1Open ↗
08/13/2026Q00855158-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/07/2024440758609Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
06/20/2024440758609Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00635002-I1Open ↗