← Back
Multi-story retail building (2+)
106-09 ROCKAWAY BOULEVARD
QUEENS · South Ozone Park · BIN 4247525
💬 Discuss this project
1920Year Built
2Stories
K2Building Class
R4Zoning
9,394 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: GAP GENERATION CHURCH · 5,523 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 3 docs
Floor 12p · 1 filing · 3 docs
Cellar3p · 1 filing · 3 docs
Filed — no permit issued3p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/12/2021$2.4M—— → —$255/sf building
08/10/2018$2.3M—INTERNATIONAL DIVERSIFIED SERVICES LLC → Private party$245/sf building
05/31/2016$1.3M—TOPAZ ENTERPRISES, INC. → INTERNATIONAL DIVERSIFIED SERVICES LLC$138/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABILLAMA &BASSOCIATES202/16/2022
TECHNEMOTION DESIGN112/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM EXPEDITING DRAFTING DESIGN403/21/2026
HIGHRISE GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AM EXPEDITING DRAFTING &General Contractor303/21/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244102/16/2022
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Violation (11)Inspection (4)Special Inspection (1)
08/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/21/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/16/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2022
Permit issued — General Construction
Q00673462-I1-GC
02/22/2022
Permit issued — Plumbing
Q00642554-I1-PL
02/16/2022
Filed — Alteration
FILING TO RELOCATE EXITING LAVATORY AND INSTALL NEW TOILET IN EXECUTIVE BATHROOMON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00673545-I1
02/16/2022
Filed — Alteration
FILING TO INSTALL NON-LOAD BEARING PARTITION AND DOOR AT FIRST FLOOR OFFICE ACCESS STAIR ENCLOSURE AND INCIDENTAL REPAIRS TO EXECUTIVE BATHROOM IN SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00673462-I1
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/08/2021
Filed — Alteration
MINOR INTERIOR RENOVATION TO CAP & REMOVE GAS METER VALVE, GAS SERVICE VALVE & BOILERS TO AN EXISTING 2 STORY BUILDING W/ CELLAR.
Q00642554-I1
10/09/2020
Violation issued (ECB, closed)
Construction
09/05/2020
Violation issued (FDNY_ORDER, closed)
07/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2018
Violation issued (ECB, closed)
Plumbing
04/11/2018
Violation issued (ECB, closed)
Construction
10/26/1990
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
10/26/1990
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
12/13/1989
Violation issued (ECB, closed)
Public Assembly
10/04/1989
Violation issued (ECB, closed)
Public Assembly
11/10/1986
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAM EXPEDITING DRAFTING &02/24/2022
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN02/22/2022
2 projects · most recent 02/16/2022
Water/Sanitary Gas
FiledStatusContractorScope
02/16/2022——Water/Sanitary
12/08/2021Signed-offCREATIVE MECHANICAL INCGas
1 project · most recent 02/02/2022
General Wiring
FiledStatusContractorScope
02/02/2022Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/21/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/16/2022Fail-Final General Construction Non-Directive 14FailView ↗
03/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/02/2022Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00642554-I1Request digital key ↗
08/26/2026Q00673545-I1Request digital key ↗
08/26/2026Q00673462-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
03/02/2022421658995Open ↗
04/03/2019421658995Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00642554-I1Open ↗
08/26/2026Q00673545-I1Open ↗
08/26/2026Q00673462-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/03/2019421658995Open ↗
04/03/2019421658995Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/03/2019421658995Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/03/2019421658995Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00673545-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/03/2019421658995Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/03/2019421658995Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00642554-I1Open ↗
08/26/2026Q00673545-I1Open ↗
08/26/2026Q00673462-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/03/2019421658995Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/03/2019421658995Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/03/2019421658995Open ↗