← Back
Two stories - detached, small or mid-size
106-12 95 AVENUE
QUEENS · Ozone Park (North) · BIN 4197237
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4AZoning
1,360 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,521 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivil
Roof2p · 1 filing · 6 docs
Attic1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2023$701K—Private party → Private party$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC612/30/2025
TOM PETERSEN ARCHITECT, LLC111/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC1203/21/2026
SUNCO CAPITAL203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPITAL CTT CORPGeneral Contractor704/09/2026
SUNCO CAPITAL LLCGeneral Contractor203/21/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527512/30/2025
THOMAS PETERSEN ARCHITECT7854111/05/2024
Building Lifecycle
All (65)Filed (7)Permit Issued (6)Signed Off (2)Inspection (8)Objection (12)Special Inspection (30)
01/15/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Nasir Khanzada
01/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
01/15/2026
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
01/15/2026
Special inspection requirement — Concrete - Cast-In-Place
Nasir Khanzada
01/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
01/15/2026
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
01/15/2026
Special inspection requirement — Footing and Foundation
Nasir Khanzada
01/15/2026
Special inspection requirement — Maintenance information
Nasir Khanzada
01/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
01/15/2026
Special inspection requirement — Masonry
Nasir Khanzada
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
01/15/2026
Special inspection requirement — Final
Nasir Khanzada
01/15/2026
Special inspection requirement — Interior lighting power
Nasir Khanzada
01/15/2026
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
01/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
01/15/2026
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
01/15/2026
Special inspection requirement — Metering
Nasir Khanzada
01/15/2026
Special inspection requirement — Fenestration areas
Nasir Khanzada
01/12/2026
Objection resolved — Addressed
01/05/2026
Objection raised — Scope
12/30/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION ONE TO TWO FAMILY DWELLING WITH SECOND FLOOR FRONTAND REAR EXTENSION
Q00911600-P2
12/15/2025
Special inspection requirement — Final
Nasir Khanzada
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
12/15/2025
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
12/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
12/15/2025
Special inspection requirement — Masonry
Nasir Khanzada
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
12/15/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
12/15/2025
Special inspection requirement — Maintenance information
Nasir Khanzada
12/15/2025
Special inspection requirement — Concrete - Cast-In-Place
Nasir Khanzada
12/15/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Nasir Khanzada
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
12/15/2025
Special inspection requirement — Metering
Nasir Khanzada
10/29/2025
Signed off — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR CONVERSIONONE TO TWO FAMILY DWELLING WITHSECOND FLOOR FRONT AND REAREXTENSION
Q00911632-I1
10/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Permit issued — Plumbing
Q00911632-I1-PL
09/23/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/11/2025
Filed — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR CONVERSIONONE TO TWO FAMILY DWELLING WITHSECOND FLOOR FRONT AND REAREXTENSION
Q00911632-P1
06/05/2025
Signed off — Alteration
Q00911635-I1
06/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Filed — Alteration CO
APPLICATION FILED FOR CONVERSION ONE TO TWO FAMILY DWELLING WITH SECOND FLOOR FRONTAND REAR EXTENSION
Q00911600-P1
11/21/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/13/2024
Permit issued — Solar
Q01134588-I1-SL
11/05/2024
Filed — Alteration
Q01134588-I1
10/15/2024
Permit issued — Plumbing
Q00911632-I1-PL
08/23/2024
Permit issued — Structural
Q00911600-I1-GC-CX
08/23/2024
Permit issued — Earth Work
Q00911600-I1-FO-EA
08/14/2024
Permit issued — Construction Fence
Q00911635-I1-FN
08/24/2023
Objection resolved — Addressed
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection resolved — Addressed
08/17/2023
Objection resolved — Addressed
08/16/2023
Objection raised — Fire_Protection
08/16/2023
Objection raised — Zoning
08/16/2023
Objection raised — Mechanical
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC09/23/2025
DOB NOWSolarPermit IssuedSUNCO CAPITAL LLC11/13/2024
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN10/15/2024
DOB NOWStructuralPermit IssuedCAPITAL CTT CORP08/23/2024
DOB NOWEarth WorkPermit IssuedCAPITAL CTT CORP08/23/2024
DOB NOWConstruction FenceSigned-offCAPITAL CTT CORP08/14/2024
2 projects · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025CompleteBERGER QUALITY ELEC'L CON—
10/04/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 12/30/2025
Wood
FiledStatusContractorScope
12/30/2025Permit IssuedCAPITAL CTT CORPWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
01/15/2026Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
01/15/2026Interior lighting powerNasir Khanzadaenergy_progress
01/15/2026Fenestration air leakageNasir Khanzadaenergy_progress
01/15/2026Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
01/15/2026Air barrier - visual inspectionNasir Khanzadaenergy_progress
01/15/2026Insulation placement and R valuesNasir Khanzadaenergy_progress
01/15/2026Maintenance informationNasir Khanzadaenergy_progress
01/15/2026Fenestration areasNasir Khanzadaenergy_progress
01/15/2026MeteringNasir Khanzadaenergy_progress
01/15/2026Footing and FoundationNasir Khanzadaprogress
01/15/2026FinalNasir Khanzadaprogress
01/15/2026Structural Wood FrameNasir Khanzadaprogress
01/15/2026Energy Code Compliance InspectionsNasir Khanzadaprogress
01/15/2026Fire-Resistance Rated ConstructionNasir Khanzadaprogress
01/15/2026MasonryNasir Khanzadaspecial
01/15/2026Concrete - Cast-In-PlaceNasir Khanzadaspecial
01/15/2026Construction Utilizing CLT or SCL, Type IVNasir Khanzadaspecial
01/15/2026Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/15/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
12/15/2025Concrete - Cast-In-PlaceNasir Khanzadaspecial
12/15/2025Construction Utilizing CLT or SCL, Type IVNasir Khanzadaspecial
12/15/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/15/2025MasonryNasir Khanzadaspecial
12/15/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
12/15/2025FinalNasir Khanzadaprogress
Latest 25 of 63.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00911632-I1Request digital key ↗
08/24/2026Q00911632-P1Request digital key ↗
08/24/2026Q00911635-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00911600-P2Open ↗
08/13/2026Q00911600-P1Open ↗
08/13/2026Q00911600-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00911600-P2Open ↗
08/13/2026Q00911600-I1Open ↗
08/13/2026Q00911600-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00911600-I1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
09/15/2026Q00911632-I1Open ↗
09/01/2026Q00911600-P2Open ↗
09/01/2026Q00911600-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/15/2026Q00911632-I1Open ↗
09/01/2026Q00911600-P2Open ↗
09/01/2026Q00911600-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00911632-P1Open ↗
08/24/2026Q00911632-I1Open ↗
08/24/2026Q00911635-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q00911600-P1Open ↗
08/17/2026Q00911600-I1Open ↗
08/15/2026Q00911600-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00911632-I1Open ↗
08/24/2026Q00911632-P1Open ↗
08/21/2026Q01134588-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00911600-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q00911600-P1Open ↗
08/13/2026Q00911600-I1Open ↗
08/13/2026Q00911600-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00911600-P1Open ↗
08/13/2026Q00911600-P2Open ↗
08/13/2026Q00911600-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00911600-P2Open ↗
08/13/2026Q00911600-P1Open ↗
08/13/2026Q00911600-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q00911600-P1Open ↗
08/17/2026Q00911600-I1Open ↗
08/15/2026Q00911600-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00911600-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00911600-I1Open ↗