← Back
BuildNYC
Two family brick
106-20 ASTORIA BOULEVARD
QUEENS · East Elmhurst · BIN 4623255
💬 Discuss this project
2021Year Built
3Stories
B1Building Class
R6BZoning
1,956 sfGross Floor Area
2Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Two family brick · Owner of record: 106-18 Astoria · 909 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof9p · 2 filings · 20 docs
Floor 45p · 1 filing · 20 docs
Floor 39p · 2 filings · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 1Foundation and structural work16p · 3 filings · 20 docs
Cellar12p · 2 filings · 20 docs
Site & exteriorSupport of excavation1p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 Avenue407/08/2026
106-18 Astoria103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2019$990K—Private party → 106-18 ASTORIA LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tan Architect712/20/2022
Flushing206/09/2021
Z&T Engineering205/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Chang Hwa Tan203/21/2026
HT Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B T RefinishingGeneral Contractor1107/08/2026
Village P & H NYPlumbing407/08/2026
Village P H NYPlumbing203/22/2026
Splen ConstructionGeneral Contractor107/08/2026
Village P & H NYFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T Engineering591912/20/2022
Flushing Engineering Service4373206/09/2021
Building Lifecycle
12/04/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/18/2024
§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL . IN THE BATHROOM LOCATED AT APT UNIT1, 1st STORY,…
HPD violation · open
01/10/2023
Signed off — Alteration
PROPOSED 4 STORY NEW BUILDING
Q00478222-I1
12/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/23/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fei Zeng
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSplen Construction12/02/2022
DOB NOWPlumbingSigned-offVillage P & H NY03/25/2022
DOB NOWSprinklersSigned-offVillage P & H NY03/25/2022
DOB NOWEarth WorkSigned-offB T Refinishing07/15/2021
DOB NOWFoundationPermit IssuedB T Refinishing07/14/2021
DOB NOWEarth WorkSigned-offB T Refinishing06/29/2021
DOB NOWFoundationPermit IssuedB T Refinishing06/09/2021
DOB NOWSupport of ExcavationSigned-offB T Refinishing05/22/2021
BIS—ISSUEDSafety Pro Construction10/14/2022
BIS—ISSUEDSafety Pro Construction02/17/2022
BIS—ISSUEDSafety Pro Construction11/23/2021
1 project · most recent 11/30/2022
General Wiring
FiledStatusContractorScope
11/30/2022CompleteEric & NG ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/23/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
12/23/2022Maintenance informationFei Zengenergy_progress
12/20/2022Maintenance informationFei Zengenergy_progress
12/20/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
10/21/2022Energy Code Compliance InspectionsFei Zengprogress
10/21/2022Sprinkler SystemsFei Zengspecial
10/10/2022Sprinkler SystemsFei Zengspecial
10/10/2022Energy Code Compliance InspectionsFei Zengprogress
10/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
10/07/2022Maintenance informationFei Zengenergy_progress
07/26/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFei Zengspecial
07/26/2022Maintenance informationFei Zengenergy_progress
05/27/2022Sprinkler SystemsFei Zengspecial
05/27/2022Energy Code Compliance InspectionsFei Zengprogress
06/09/2021Excavations - Sheeting, Shoring, and BracingKY FUspecial
06/09/2021FinalKY FUprogress
06/09/2021Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
05/19/2021Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
05/18/2021FinalFei Zengprogress
05/18/2021Footing and FoundationFei Zengprogress
05/18/2021Concrete - Cast-In-PlaceFei Zengspecial
04/19/2021Excavations - Sheeting, Shoring, and BracingKY FUspecial
04/14/2021FinalKY FUprogress
134 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account