← Back
BuildNYC
Elevator apt, fireproof without stores
106-20 SHORE FRONT PARKWAY
QUEENS · BIN 4303818
💬 Discuss this project
1963Year Built
13Stories
D3Building Class
R5Zoning
292,677 sfGross Floor Area
240Units
LL97 CoveredRent Stabilized26 Active Violations 2 likely answered ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 106-20 Shorefront Associates · 213,600 sf lot · 1.37 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAlma Realty CORP4p · 2 filings · 6 docs
Site & exteriorAlma Realty CORP2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
106-20 Shorefront Realty2603/22/2026
Alma Realty1803/22/2026
106-20 Shorefront Associates1003/22/2026
101-10 Shorefront Parkway Realty503/21/2026
1 Beach 105 Realty203/21/2026
Prompt203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Structural Consulting Services302/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vordonia Contracting SUGeneral Contractor703/21/2026
Uphold ConstructionGeneral Contractor303/21/2026
Kefa ConstructionGeneral Contractor303/21/2026
RC3 Electricspecialty_contractor303/21/2026
Tri City WaterPlumbing203/21/2026
Fast Track Electricspecialty_contractor203/21/2026
Fast Track Electricspecialty_contractor203/21/2026
York ScaffoldingGeneral Contractor103/21/2026
Go Pro Plumbing & Heating Co IPlumbing103/21/2026
Bridgeworks of Greater New YorkGeneral Contractor103/21/2026
Petroleum Tank CleanersGeneral Contractor103/21/2026
PSGGeneral Contractor103/21/2026
Fast Track ElectricGeneral Contractor109/12/2014
Peter Miceli PlumbingPlumbing106/16/2010
Tradeline PlumbingPlumbing111/05/2008
Wasoff Plumbing & UtilitiesPlumbing108/04/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Structural Consulting Services1919302/27/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 02/21/2025, status Swarmp
11/10/2026
Elevator Category 1 inspection report filed
07/17/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE BATHROOM LOCATED AT APT 10E,…
HPD violation · open
07/17/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10E, 10th STORY, 3rd APARTMENT FROM SOUTH…
HPD violation · open
07/17/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
237 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFast Track Electric03/06/2025
DOB NOWAntennaSigned-offFast Track Electric03/04/2025
DOB NOWAntennaSigned-offRC3 Electric08/12/2019
BISOTISSUEDUphold Construction04/01/2019
BISEQISSUEDVordonia Contracting & Supplies03/20/2019
BISOTISSUEDUphold Construction04/05/2018
BISEQISSUEDVordonia Contracting & Supplies03/16/2018
BISOTISSUEDUphold Construction01/10/2018
BISOTISSUEDUphold Construction07/28/2017
BISEQISSUEDVordonia Contracting & Supplies02/10/2017
BISOTISSUEDVordonia Contracting & Supplies08/08/2016
BISEQISSUEDVordonia Contracting & Supplies03/16/2016
BISOTISSUEDVordonia Contracting & Supplies11/04/2015
BISOTISSUEDVordonia Contracting & Supplies09/22/2015
BISEQISSUEDVordonia Contracting & Supplies08/19/2015
BISOTISSUEDKefa Construction08/14/2015
BISOTISSUEDKefa Construction01/22/2015
BISOTISSUEDFast Track Electric09/12/2014
BISEQISSUEDKefa Construction08/11/2014
BISOTISSUEDKefa Construction08/11/2014
BISOTISSUEDVordonia Contracting & Supplies01/15/2013
BISEQISSUEDVordonia Contracting & Supplies01/15/2013
BISPLISSUEDMarathon Mechanical05/02/2012
BISBLISSUEDPeter Agliardo Contractor05/02/2012
BISOTISSUEDKefa Construction04/27/2012
BISEQISSUEDKefa Construction04/27/2012
BISPLISSUEDMarathon Mechanical02/22/2012
BISFBISSUEDPeter Agliardo Contractor02/22/2012
BISBLISSUEDPeter Agliardo Contractor09/27/2011
BIS—ISSUEDVordonia Contracting & Supplies07/05/2011
BISFBISSUEDStuart N Schwartz11/22/2010
BISPLISSUEDPeter Miceli Plumbing06/16/2010
BISPLISSUEDTri City Water04/09/2009
BISFSISSUEDStuart N Schwartz11/05/2008
BISPLISSUEDTradeline Plumbing11/05/2008
BISPLISSUEDTri City Water02/26/2008
BIS—ISSUEDVordonia Contracting & Supplies01/29/2008
BISOTISSUEDVordonia Contracting & Supplies10/19/2006
BISPLISSUEDWasoff Plumbing & Utility08/04/2004
BISFSISSUEDStuart N Schwartz08/04/2004
+ 9 more permits on file
3 projects · most recent 04/07/2025
FiledStatusContractorScope
04/07/2025Permit IssuedStar Electrical Contractors—
03/14/2025Permit IssuedTrincity Electric—
10/14/2024Permit IssuedQec Electrical Svce—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/24/2023Concrete - Cast-In-PlaceJames Faheyspecial
02/24/2023Subgrade InspectionsJames Faheyspecial
02/22/2023Tenant Protection Plan ComplianceJames Faheyspecial
02/22/2023FinalJames Faheyprogress
155 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account