Miscellaneous utility property
106-21 BEACH CHANNEL DRIVE
QUEENS · BIN 4539810
💬 Discuss this project
0Year Built
—Stories
U9Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Miscellaneous utility property · Owner of record: NYC Department of Environmental Protection · 222,521 sf lot · 0 FAR built
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1NYC Wastewater Resiliency Program, New York City Environment3 filings · 6 docs
Sub-BasementNYC Wastewater Resiliency Program, New York City Environment5 filings · 10 docs
Site & exteriorDemolition of holder tank1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Environmental Protection1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hazen and Sawyer602/11/2025
B4 Architecture108/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hazen & Sawyer1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Russo Development EnterprisesGeneral Contractor107/08/2026
Building Lifecycle
All (26)Filed (7)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (16)
07/25/2025
Signed off — Alteration
PROPOSED: dismantling and removal of abandoned empty steel gas tank. No change of use, egress or occupancy.
Q01033428-I1
02/11/2025
Filed — Alteration
DEP ROCKAWAY WRRF, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F-03. CHLORINATION BUILDING, HEATING PLANT, TUNNEL A, REMOVE & REPLACE LIGHTING, REMOVE & REPLACE EXISTING CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01178316-I1
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/07/2025
Special inspection requirement — Final
02/07/2025
Special inspection requirement — Post-installed Anchors
11/27/2024
Filed — Alteration
DEP ROCKAWAY WRRF, EAST CENTRAL PIPE GALLERY, AERATION TAKES SIDE & END PIPE GALLERY, PRIMARY SCUM BUILDING PIPE GALLERY, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F05. REMOVE & REPLACE EXIST CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01140211-I1
11/27/2024
Filed — Alteration
Q01140285-I1
11/11/2024
Special inspection requirement — Final
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2024
Special inspection requirement — Post-installed Anchors
11/11/2024
Special inspection requirement — Final
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/11/2024
Special inspection requirement — Post-installed Anchors
10/24/2024
Filed — Alteration
DEP ROCKAWAY WRRF, EAST CENTRAL PIPE GALLERY, AERATION TAKES SIDE & END PIPE GALLERY, PRIMARY SCUM BUILDING PIPE GALLERY, NYC WASTEWATER RESILIENCY PROGRAM ASSIGNMENT RLCY-RO-02-J18G-F06. REMOVE & REPLACE EXIST CONDUIT & WIRE AS PER PLANS SUBMITTED.
Q01111314-I1
10/24/2024
Filed — Alteration
Q01114967-I1
09/13/2024
Special inspection requirement — Post-installed Anchors
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/13/2024
Special inspection requirement — Final
08/20/2024
Permit issued — General Construction
Q01033428-I1-GC
08/12/2024
Filed — Alteration
PROPOSED: dismantling and removal of abandoned empty steel gas tank. No change of use, egress or occupancy.
Q01033428-I1
04/10/2024
Special inspection requirement — Final
LAZAR KESIC
03/19/2024
Filed — Alteration
Q00905244-I1
02/09/2024
Violation issued (FDNY_NOV, closed)
07/18/2023
Special inspection requirement — Post-installed Anchors
07/17/2023
Special inspection requirement — Mechanical Systems
07/17/2023
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRusso Development Enterprises08/20/2024
BISMHISSUEDWDF06/03/2020
BISMHISSUEDWDF07/18/2019
BISMHISSUEDWDF12/11/2018
BISMHISSUEDWDF12/20/2017
BISEQISSUEDTri Borough Scaffolding11/05/2014
BISBLISSUEDApproved Oil Co of Brooklyn01/25/2013
2 projects · most recent 08/23/2019
General Wiring
FiledStatusContractorScope
08/23/2019CompleteA Tech Electric EnterprisesGeneral Wiring
04/19/2018CompleteMaraj ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/07/2025Fire-Resistant Penetrations and Joints—special
02/07/2025Final—progress
02/07/2025Post-installed Anchors—special
11/11/2024Final—progress
11/11/2024Fire-Resistant Penetrations and Joints—special
11/11/2024Post-installed Anchors—special
11/11/2024Final—progress
11/11/2024Fire-Resistant Penetrations and Joints—special
11/11/2024Post-installed Anchors—special
09/13/2024Post-installed Anchors—special
09/13/2024Fire-Resistant Penetrations and Joints—special
09/13/2024Final—progress
04/10/2024FinalLAZAR KESICprogress
07/18/2023Post-installed Anchors—special
07/17/2023Mechanical Systems—special
07/17/2023Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYC Wastewater Resiliency ProgramGovernment / CivicSub-basement, Floor 1
Project Q01178316 Alteration · Approved · 02/11/2025
Project Q01140211 Alteration · Approved · 11/27/2024
Project Q01140285 Alteration · Approved · 11/27/2024
Project Q01114967 Alteration · Approved · 10/24/2024
New York City Environmental ProtectionGovernment / CivicSub-basement
Project Q01111314 Alteration · Approved · 10/24/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00905244-I1Request digital key ↗
08/21/2026Q01033428-I1Request digital key ↗
08/21/2026Q01111314-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
12/17/2018440455071Open ↗
12/20/2017440455071Open ↗
11/03/2014440181919Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
01/16/2013420803072Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01114967-I1Open ↗
08/20/2026Q01178316-I1Open ↗
08/13/2026Q01140211-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/26/2015440181919Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01033428-I1Open ↗
▸Trade Schedules & Equipment2
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/29/2013420803072Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/16/2013420803072Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/16/2013420803072Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/13/2017440455071Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/13/2017440455071Open ↗
▸BISNYCECC ANALYSIS1
12/13/2017440455071Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/13/2017440455071Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/21/2026Q01114967-I1Open ↗
08/13/2026Q01178316-I1Open ↗
08/13/2026Q01140285-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/26/2015440181919Open ↗
01/29/2013420803072Open ↗
▸BISSUPERSEDING LETTER1
12/17/2018440455071Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/26/2015440181919Open ↗
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/20/2017440455071Open ↗
▸BISCOST AFFIDAVIT1
12/13/2017440455071Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
12/13/2017440455071Open ↗
11/03/2014440181919Open ↗
▸Other Documents1
▸BISEMERGENCY WORK NOTIFICATION1
01/24/2013420803072Open ↗