← Back
Primarily 2 family with 1 store or office
106 5 AVENUE
BROOKLYN · Park Slope · BIN 3018823
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6AZoning
2,400 sfGross Floor Area
3Units
8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,300 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 2 docs
Floor 14p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
102106FIFTHAVELLC GMAIL COM109/15/2026
GSR CONTRACTOR106/27/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ISHAC DESIGN ARCHITECTS PC208/13/2026
IKRA CONSULTING LLC106/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISHAC DESIGN ARCHITECTS P3918208/13/2026
Building Lifecycle
All (23)Filed (3)Permit Issued (1)Violation (9)Inspection (1)Special Inspection (9)
08/13/2026
Filed — Alteration
Replace existing stone lintels and window sills, repair damaged cracks in the facade, provide new cement joints between bricks, prime and paint facade, no change in occupancy use or egress.
B01444862-I1
08/12/2026
Special inspection requirement — Masonry
NABIL ISHAC
08/12/2026
Special inspection requirement — Final
NABIL ISHAC
08/07/2026
Violation issued (ECB, open)
Construction
08/07/2026
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
07/02/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2026
Permit issued — Sidewalk Shed
B01409801-I1-SH
06/17/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01409801-I1
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2022
Filed — Alteration
B08009473-I1
10/06/2022
Special inspection requirement — Interior lighting power
NABIL ISHAC
10/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
NABIL ISHAC
09/23/2022
Special inspection requirement — Insulation placement and R values
NABIL ISHAC
09/23/2022
Special inspection requirement — Lighting controls
NABIL ISHAC
09/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NABIL ISHAC
09/23/2022
Special inspection requirement — Final
NABIL ISHAC
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
06/28/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2017
Violation issued (HPD, open)
B
03/31/2017
Violation issued (HPD, open)
B
02/23/2017
Violation issued (HPD, open)
A
01/16/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC06/23/2026
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Permit IssuedRICHARD NEU—
1 project · most recent 06/17/2026
Sidewalk Shed
FiledStatusContractorScope
06/17/2026Permit IssuedGSR CONTRACTOR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/07/2026Fail-Final Sign Permit InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/12/2026MasonryNABIL ISHACspecial
08/12/2026FinalNABIL ISHACprogress
10/06/2022Interior lighting powerNABIL ISHACenergy_progress
10/06/2022Fire-Resistance Rated ConstructionNABIL ISHACprogress
09/23/2022Insulation placement and R valuesNABIL ISHACenergy_progress
09/23/2022Lighting controlsNABIL ISHACenergy_progress
09/23/2022Structural Stability – Alterations of existing buildingsNABIL ISHACspecial
09/23/2022FinalNABIL ISHACprogress
09/23/2022Fire-Resistant Penetrations and JointsNABIL ISHACspecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B08009473-I1Request digital key ↗
08/16/2026B01409801-I1Request digital key ↗
08/16/2026B01444862-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01409801-I1Open ↗
08/16/2026B01444862-I1Open ↗
08/13/2026B08009473-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026B08009473-I1Open ↗
08/24/2026B08009473-I1Open ↗
08/24/2026B08009473-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B08009473-I1Open ↗
08/24/2026B08009473-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B08009473-I1Open ↗