← Back
BuildNYC
Two stories - detached, small or mid-size
106-50 PINEGROVE STREET
QUEENS · South Jamaica · BIN 4215271
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,710 sfGross Floor Area
1Units
11 Active Violations 10 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,700 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstallation of solar panels on existing5p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Unisolar211/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Centurion Solar EnergyGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Centurion Solar Energy9475211/25/2025
Building Lifecycle
12/12/2025
Signed off — Alteration
Q01219788-I1
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
12/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
12/10/2025
Special inspection requirement — Final
Andres Arias Londono
12/10/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
26 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCenturion Solar Energy06/10/2025
1 project · most recent 05/04/2025
FiledStatusContractorScope
05/04/2025CompleteBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/10/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
12/10/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
12/10/2025FinalAndres Arias Londonoprogress
12/10/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
11/11/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
11/11/2025FinalAndres Arias Londonoprogress
11/11/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account