106-56 GUY BREWER BOULEVARD
QUEENS · South Jamaica · BIN 4532364
💬 Discuss this project
2005Year Built
2Stories
S1Building Class
R7AZoning
1,906 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · Owner of record: 10656 Guy R Brewer BLVD · 2,340 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Foundation Center11p · 1 filing · 20 docs
Floor 1Foundation Center8p · 1 filing · 20 docs
CellarFoundation Center10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2024$700K—— → —$367/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arcalhek708/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A M Plumbing CompanyGeneral Contractor203/22/2026
Epc ElectricalElectrical103/21/2026
A&A Building ConsultantsGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519708/05/2026
Building Lifecycle
All (56)Filed (7)Permit Issued (1)Inspection (4)Objection (14)Special Inspection (30)
08/05/2026
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P6
06/06/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/06/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/06/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/01/2026
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P5
06/01/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/01/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/01/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/14/2026
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P4
05/14/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/14/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/14/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
05/07/2026
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P3
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/07/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
05/07/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
05/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/07/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2026
Objection resolved — Addressed
02/17/2026
Objection raised — Cost
01/12/2026
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P2
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/03/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
08/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/20/2025
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-P1
05/13/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/28/2025
Permit issued — General Construction
Q01093066-I1-GC
12/11/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
10/08/2024
Objection resolved — Addressed
10/08/2024
Objection resolved — Addressed
10/08/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/18/2024
Objection raised — Zoning
09/18/2024
Objection raised — Scope
09/12/2024
Objection raised — Zoning
09/12/2024
Objection raised — Zoning
09/12/2024
Objection raised — Fire_Protection
09/12/2024
Objection raised — Accessibility
08/29/2024
Filed — Alteration CO
PROPOSING THE REMOVAL OF THE EXIST GARAGE. 1ST FLOOR CHANGE OCCUPANCY FROM COMMERCIAL TO COMMUNITY FACILITY FOR NON PROFIT. At 2nd floor change use from Res apart to accessory sleeping accommodations for Care taker in connection with non-profit use.
Q01093066-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA&A Building Consultants04/28/2025
BISPLISSUEDDavid Jablon12/26/2006
BISMHISSUEDJobe Development11/29/2006
BIS—ISSUEDJobe Develoment11/15/2006
BISEQISSUEDJobe Develoment11/15/2006
BIS—ISSUEDJobe Develoment12/02/2005
BISEQISSUEDJobe Develoment12/02/2005
BISPLISSUEDDavid Jablon11/09/2005
BISEQISSUEDJobe Develoment11/19/2004
BIS—ISSUEDJobe Develoment11/19/2004
BIS—ISSUEDJobe Develoment08/06/2004
BISEQISSUEDJobe Develoment08/06/2004
1 project · most recent 03/26/2025
General Wiring
FiledStatusContractorScope
03/26/2025CompleteEpc ElectricalGeneral Wiring
1 project · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026Permit IssuedA&A Building Consultants1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/13/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/06/2026Fenestration areasYounes Abouyaalaenergy_progress
06/06/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/06/2026Fenestration air leakageYounes Abouyaalaenergy_progress
06/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/06/2026Interior lighting powerYounes Abouyaalaenergy_progress
06/06/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/06/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/01/2026Interior lighting powerYounes Abouyaalaenergy_progress
06/01/2026Fenestration air leakageYounes Abouyaalaenergy_progress
06/01/2026Fenestration areasYounes Abouyaalaenergy_progress
06/01/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/01/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/01/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/01/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/14/2026Interior lighting powerYounes Abouyaalaenergy_progress
05/14/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/14/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/14/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
05/14/2026Fenestration air leakageYounes Abouyaalaenergy_progress
05/14/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
05/14/2026Fenestration areasYounes Abouyaalaenergy_progress
05/07/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/07/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/07/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
05/07/2026Fenestration areasYounes Abouyaalaenergy_progress
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Foundation CenterOfficeCellar, Floors 1, 2
Project Q01093066 Alteration CO · Permit Entire · 08/29/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026Q01093066-P4Request digital key ↗
08/16/2026Q01093066-I1Request digital key ↗
08/16/2026Q01093066-P6Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/16/2026Q01093066-P1Open ↗
08/16/2026Q01093066-I1Open ↗
08/13/2026Q01093066-P2Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q01093066-P4Open ↗
09/01/2026Q01093066-P4Open ↗
08/28/2026Q01093066-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026Q01093066-P6Open ↗
08/16/2026Q01093066-P5Open ↗
08/16/2026Q01093066-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01093066-P4Open ↗
08/28/2026Q01093066-P1Open ↗
08/28/2026Q01093066-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/16/2026Q01093066-I1Open ↗
08/16/2026Q01093066-P6Open ↗
08/16/2026Q01093066-P4Open ↗
Showing 3 of 7 on file for this type
▸Other Documents8
▸DOB NOWProperty Ownership Certification7
08/16/2026Q01093066-P5Open ↗
08/16/2026Q01093066-P3Open ↗
08/16/2026Q01093066-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q01093066-I1Open ↗