← Back
Two stories - detached, small or mid-size
106-77 97 STREET
QUEENS · BIN 4191205
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R4AZoning
1,920 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,780 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR104/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281104/15/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/21/2026
Permit issued — Solar
Q01387561-I1-SL
04/15/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 17 MODULES, 7.395KW
Q01387561-I1
04/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/15/2026
Special inspection requirement — Final
Mina Makar
04/15/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR04/21/2026
2 jobs · most recent 09/09/2026
FiledStatusContractorScope
09/09/2026Permit IssuedISLAND ELECTRIC CORP—
04/15/2026CompleteISLAND ELECTRIC CORP—
1 job · most recent 04/15/2026
FiledStatusContractorScope
04/15/2026Signed-offMOMENTUM SOLAR17 panels, 7.39 kw, 299 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/15/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
04/15/2026Fire-Resistant Penetrations and JointsMina Makarspecial
04/15/2026Energy Code Compliance InspectionsMina Makarprogress
04/15/2026FinalMina Makarprogress
04/15/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01387561-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01387561-I1Open ↗
08/26/2026Q01387561-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01387561-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01387561-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01387561-I1Open ↗