← Back
BuildNYC
Two family brick
106 BAY 34 STREET
BROOKLYN · BIN 3185891
💬 Discuss this project
1925Year Built
2.75Stories
B1Building Class
R5Zoning
2,796 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 5,800 sf lot · 0.48 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 1 filing · 20 docs
BulkheadUnder Construction3p · 1 filing · 20 docs
PenthouseUnit PH1Under Construction1p · 1 filing · 20 docs
Floor 3Under Construction37p · 1 filing · 20 docs
Floor 2Under Construction37p · 1 filing · 20 docs
Floor 1Under Construction43p · 1 filing · 20 docs
CellarUnder Construction31p · 1 filing · 20 docs
Site & exteriorTemporary construction fenceUnder Construction92p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
106 BAY 34403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2025$2.1M—Private party → 106 BAY 34 LLC$737/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hsu & Associates610/06/2026
Ivan Shcherbakov604/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Epac Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Power RHCGeneral Contractor511/19/2026
Power RHCScaffold311/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LT Inspections9795408/04/2026
Building Lifecycle
11/17/2026
Permit renewed — Construction Fence
Renewed without changes
B01292122-S4-FN
11/17/2026
Permit issued — Support of Excavation
B01292122-S1-SE
11/17/2026
Permit renewed — Foundation
Renewed without changes
B01292122-S2-FO
11/17/2026
Permit issued — Foundation
B01292122-S2-FO
11/17/2026
Permit issued — General Construction
B01292122-I1-GC
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPower RHC11/17/2026
DOB NOWSupport of ExcavationPermit IssuedPower RHC11/17/2026
DOB NOWFoundationPermit IssuedPower RHC11/17/2026
DOB NOWFoundationPermit IssuedPower RHC11/17/2026
DOB NOWGeneral ConstructionPermit IssuedPower RHC11/17/2026
DOB NOWConstruction FencePermit IssuedPower RHC11/12/2026
DOB NOWFull DemolitionSigned-offPower RHC06/22/2026
DOB NOWConstruction FencePermit IssuedPower RHC05/14/2026
1 project · most recent 10/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/06/2026Permit IssuedPower RHCHeating and Air Conditioning Systems
1 project · most recent 10/06/2026
Concrete
FiledStatusContractorScope
10/06/2026Permit IssuedPower RHCConcrete
2 projects · most recent 10/06/2026
Fence
FiledStatusContractorScope
10/06/2026Permit IssuedPower RHCFence
10/23/2025Permit IssuedPower RHCFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/24/2026Final—progress
09/24/2026Concrete - Cast-In-Place—special
09/24/2026Subgrade Inspections—special
08/04/2026Excavations - Sheeting, Shoring, and Bracing—special
04/08/2026Concrete - Cast-In-Place—special
02/20/2026Maintenance information—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Duct leakage testing, insulation and design—energy_progress
01/26/2026Shutoff dampers—energy_progress
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026Sprinkler Systems—special
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Mechanical Systems—special
01/26/2026Final—progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026Maintenance information—energy_progress
12/16/2025Final—progress
10/20/2025DemolitionChih Hsuspecial
Latest 25 of 26.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account