← Back
Zoned residential, not Manhattan
106 BURKE AVENUE
STATEN ISLAND · BIN 5041686
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3AZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: WALLACE AVENUE BUIDERS, LLC · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralCivil
Floor 21 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION504/09/2026
WALLACE AVENUE CONST.LLC703/22/2026
WALLACE AVENUE BUILDERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT408/12/2025
ISLAND ENGINEERING ASSOCIATES305/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor407/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264208/11/2025
Building Lifecycle
All (66)Filed (8)Permit Issued (6)Signed Off (6)Violation (1)Inspection (11)Objection (4)Special Inspection (30)
03/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Signed off — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-I1
01/27/2026
Signed off — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-S2
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/16/2025
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01109848-I1
12/16/2025
Signed off — Alteration
S01093426-I1
12/16/2025
Signed off — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-S1
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/02/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Scope
08/14/2025
Permit issued — Curb Cut
S01165128-S2-CC
08/12/2025
Filed — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-S2
08/11/2025
Filed — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-P1
07/15/2025
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
07/15/2025
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S01109848-P1
03/13/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/27/2025
Permit issued — Plumbing
S01165128-S1-PL
02/26/2025
Permit issued — Plumbing
S01109848-I1-PL
02/21/2025
Filed — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-S1
02/19/2025
Permit issued — Earth Work
S01165128-I1-GC-CX
02/14/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Scope
01/10/2025
Filed — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01165128-I1
01/09/2025
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
01/09/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
01/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
12/06/2024
Signed off — Full Demolition
FILED HEREWITH; FULL DEMOLITION OF A ONE FAMILY DWELLING. FENCE FILED UNDER #S01093426
S01095481-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC08/14/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/27/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/26/2025
DOB NOWEarth WorkPermit IssuedWALLACE AVENUE CONSTR LLC02/19/2025
DOB NOWFull DemolitionSigned-offWALLACE AVENUE CONSTR LLC11/07/2024
DOB NOWConstruction FenceSigned-offWALLACE AVENUE CONSTR LLC08/09/2024
1 project · most recent 08/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/12/2025Signed-offDUO PLUMBING & HTG CORP.Storm, Water/Sanitary
1 project · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 08/12/2025
Concrete Wood
FiledStatusContractorScope
08/12/2025Signed-offWALLACE AVENUE CONSTR LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
07/15/2025Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
07/15/2025Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
07/15/2025Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
07/15/2025Mechanical SystemsWILLIAM DURDEN, P.E.special
07/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
07/15/2025Subgrade InspectionsWILLIAM DURDEN, P.E.special
07/15/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
07/15/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
07/15/2025FinalWILLIAM DURDEN, P.E.progress
07/15/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
07/15/2025Footing and FoundationWILLIAM DURDEN, P.E.progress
07/15/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
07/15/2025HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
07/15/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
07/15/2025HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
07/15/2025Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
07/15/2025Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
07/15/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
07/15/2025Maintenance informationWILLIAM DURDEN, P.E.energy_progress
07/15/2025HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
07/15/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
07/15/2025Permanent certificateWILLIAM DURDEN, P.E.energy_progress
07/15/2025Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
07/15/2025Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
07/15/2025Fenestration areasWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 52.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026S01093426-I1Request digital key ↗
08/20/2026S01095481-I1Request digital key ↗
08/20/2026S01165128-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/23/2024520454311Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/31/2024520454311Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S01093426-I1Open ↗
08/20/2026S01165128-I1Open ↗
08/13/2026S01109848-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S01165128-P1Open ↗
09/02/2026S01165128-P1Open ↗
08/31/2026S01165128-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026S01165128-P1Open ↗
09/02/2026S01165128-P1Open ↗
08/31/2026S01165128-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026S01095481-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01095481-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01095481-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01095481-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01095481-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01165128-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01165128-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01165128-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01095481-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01095481-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01165128-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
07/23/2024520454311Open ↗
▸BISEFILING COVER SHEET1
07/23/2024520454311Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/20/2026S01095481-I1Open ↗
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026S01165128-I1Open ↗
08/13/2026S01165128-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01095481-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01165128-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01095481-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01165128-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026S01095481-I1Open ↗