← Back
Elevator apt, miscellaneous
106 GERRY STREET
BROOKLYN · BIN 3061454
💬 Discuss this project
2000Year Built
6Stories
D9Building Class
R6Zoning
49,484 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized8 Open Violations ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: 120 GERRY STREET HOUSING DEVELOPMENT FUN D CORPORAT · 22,850 sf lot · 2.17 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof8p · 3 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 63p · 3 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 21p · 1 filing · 2 docs
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1007/08/2026
120 GERRY STREET HOUSING DEVELOPMENT FUN D CORPORAT603/22/2026
SPARROW CONSTRUCTION303/22/2026
120 GERRY STREET LIMITED203/22/2026
OWNER OF 106 GERRY STREET203/22/2026
EXPERT ENTERPRISES203/21/2026
JOE GERRY SNA LLC103/21/2026
120_GERRY ST303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIBARI ENGINEERING, P.C.1310/23/2024
DESIGN AIDD ARCHITECTURE, DPC412/11/2023
ASHRAF CORP112/08/2022
IVAN DESIGN ENG. ANALYSIS, PLLC108/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor1007/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
J-J PLUMBING CORPPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031810/23/2024
Building Lifecycle
All (143)Filed (19)Permit Issued (13)Signed Off (6)Violation (60)Inspection (3)Objection (12)Special Inspection (30)
08/03/2026
Violation issued (HPD, open)
C
08/01/2026
Violation issued (HPD, open)
C
08/01/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
05/04/2026
Violation issued (HPD, open)
B
05/04/2026
Violation issued (HPD, open)
B
02/19/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, closed)
B
01/29/2026
Violation issued (HPD, closed)
B
01/29/2026
Violation issued (HPD, closed)
C
01/24/2026
Violation issued (HPD, closed)
C
12/17/2024
Signed off — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727087-I1
11/15/2024
Objection resolved — Addressed
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
11/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
10/24/2024
Objection raised — Scope
10/23/2024
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727087-P6
10/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
10/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/03/2024
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727087-P5
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2024
Signed off — Alteration
PROPOSE BOILER EQUIPMENT WORKS IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727080-I1
09/18/2024
Signed off — Alteration
B00726972-I1
08/29/2024
Signed off — Alteration
B00722829-I1
08/07/2024
Signed off — Alteration
B00727743-I1
07/26/2024
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727087-P4
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/24/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
06/06/2024
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727087-P3
05/06/2024
Violation issued (HPD, closed)
A
05/06/2024
Violation issued (HPD, closed)
A
05/06/2024
Violation issued (HPD, closed)
A
05/06/2024
Violation issued (HPD, closed)
A
05/06/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2024
Violation issued (HPD, closed)
C
04/29/2024
Violation issued (HPD, closed)
B
04/29/2024
Violation issued (HPD, closed)
B
04/29/2024
Violation issued (HPD, closed)
B
04/29/2024
Violation issued (HPD, closed)
B
04/29/2024
Violation issued (HPD, closed)
C
04/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/29/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
04/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
04/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
04/23/2024
Filed — Alteration
PROPOSE BOILER EQUIPMENT WORKS IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00727080-P2
04/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP01/17/2024
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP01/17/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/01/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC11/28/2023
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP08/08/2023
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP08/08/2023
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP08/08/2023
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP02/16/2023
DOB NOWBoiler EquipmentSigned-offJ-J PLUMBING CORP02/16/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/08/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/08/2022
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP09/01/2022
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP08/30/2022
BISEQISSUEDEXPERT ENTERPRISES INC06/04/2013
BISEQISSUEDSPARROW CONSTRUCTION CORP.12/26/2000
BIS—ISSUEDSPARROW CONSTRUCTION CORP.11/08/2000
BISEQISSUEDSPARROW CONSTRUCTION CORP.11/08/2000
BISEQISSUEDSPARROW CONSTRUCTION CORP.01/28/2000
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/27/2000
BIS—ISSUEDSPARROW CONSTRUCTION CORP.09/24/1999
BISEQISSUEDSPARROW CONSTRUCTION CORP.09/24/1999
BISPLISSUEDMEDCO PLUMBING INC07/16/1999
BIS—ISSUEDSPARROW CONSTRUCTION CORP.03/26/1999
BISEQISSUEDSPARROW CONSTRUCTION CORP.03/25/1999
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.03/10/1999
BIS—ISSUEDMACKROYCE DISMANTELING LTD10/03/1997
BIS—ISSUEDNOSTRAND CONTRACTING CORP09/22/1994
BISEQISSUEDNOSTRAND CONTRACTING CORP09/22/1994
2 jobs · most recent 05/28/2024
General Wiring
FiledStatusContractorScope
05/28/2024CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
08/26/2019Permit IssuedJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/24/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
11/15/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
11/15/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/15/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/15/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
10/23/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/23/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/23/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
10/23/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/23/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/23/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/23/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/23/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
04/29/2024Heating SystemsSAMI HAJJAR P.Especial
04/29/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
04/29/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
04/29/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
04/23/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
04/23/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
04/23/2024Heating SystemsSAMI HAJJAR P.Especial
04/23/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/18/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/18/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/18/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/18/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
03/18/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
Latest 25 of 113.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/29/2026B00722829-I1Request digital key ↗
08/29/2026B00722829-P1Request digital key ↗
08/29/2026B00722829-P2Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
12/03/2024340067064Open ↗
11/29/2024340067064Open ↗
11/20/2024340067064Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
06/04/2013340067064Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature28
09/25/2026B00727087-I1Open ↗
09/25/2026B00727087-I1Open ↗
09/23/2026B00727080-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/29/2026B00722829-P1Open ↗
08/29/2026B00722829-I1Open ↗
08/29/2026B00722829-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026B00727087-I1Open ↗
09/23/2026B00727080-I1Open ↗
09/19/2026B00727087-P2Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/04/2013340067064Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/04/2013340067064Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/04/2013340067064Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
12/16/2024340067064Open ↗
12/16/2024340067064Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis4
08/13/2026B00727087-I1Open ↗
08/13/2026B00726972-I1Open ↗
08/13/2026B00722829-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00727080-I1Open ↗
08/13/2026B00726972-I1Open ↗
08/13/2026B00727087-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/04/2013340067064Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/16/2024340067064Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/04/2013340067064Open ↗