← Back
Walk-up apt, over six families with stores
106 MAC DOUGAL STREET
MANHATTAN · BIN 1008690
💬 Discuss this project
1901Year Built
6Stories
C7Building Class
R7-2Zoning
11,364 sfGross Floor Area
24Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · 2,500 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof18p · 2 filings · 20 docs
Floor 117p · 3 filings · 20 docs
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INARA ELECTRIC CORP103/22/2026
KINSEY EQUITIES203/21/2026
EYCHNER ASSOCIATES1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK ARCHITECTURE212/02/2025
SOHAIL HUMAYUN P E INC505/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DONE RIGHT KITCHEN EXHAUSGeneral Contractor507/08/2026
EMPIRE PLUMBING INCPlumbing207/08/2026
SORIANO ENCARNACION, AMINElectrical103/21/2026
STERN ABRAHAMElectrical103/21/2026
ROMANELLO, WILLIAMElectrical103/21/2026
SYMMETRICAL CONSTRUC CORPGeneral Contractor104/09/2026
DIRNO CORPORATIONGeneral Contractor107/08/2026
SANG CHEUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOHAIL HUMAYUN P E INC8457307/08/2025
SD TESTING & INSPECTION S7010105/09/2024
ASHRAF CORPORATION1973107/15/2021
Building Lifecycle
All (57)Filed (7)Permit Issued (7)Violation (13)Inspection (6)Objection (12)Special Inspection (12)
12/02/2025
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF PLUMBING FIXTURES REPLACEMENT AND ALL ASSOCIATED HARDWARE AND PIPING AT BOTH GROUND AND BASEMENT LEVELS, ALSO TO MAKE ALL REQUIRED CORRECTIONS TO COMPLY WITH PL AND ALL APPLICABLE CODE.
M01046157-S6
11/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/26/2025
Violation issued (ECB, closed)
Construction
09/26/2025
Violation issued (ECB, open)
Construction
09/19/2025
Permit issued — General Construction
M01046157-S4-GC
07/28/2025
Objection resolved — Addressed
07/27/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Plumbing
07/22/2025
Objection raised — Other
07/08/2025
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF PLUMBING FIXTURES REPLACEMENT AND ALL ASSOCIATED HARDWARE AND PIPING AT BOTH GROUND AND BASEMENT LEVELS, ALSO TO MAKE ALL REQUIRED CORRECTIONS TO COMPLY WITH PL AND ALL APPLICABLE CODE.
M01046157-S4
07/07/2025
Special inspection requirement — Final
Mourad Kicha
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
05/05/2025
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF PLUMBING FIXTURES REPLACEMENT AND ALL ASSOCIATED HARDWARE AND PIPING AT BOTH GROUND AND BASEMENT LEVELS, ALSO TO MAKE ALL REQUIRED CORRECTIONS TO COMPLY WITH PL AND ALL APPLICABLE CODE.
M01046157-P2
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
05/01/2025
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
05/01/2025
Special inspection requirement — Final
SOHAIL HUMAYUN
10/24/2024
Violation issued (ECB, closed)
Construction
09/27/2024
Permit issued — Mechanical Systems
M01046157-I1-MS
07/09/2024
Permit issued — Mechanical Systems
M01046157-I1-MS
06/13/2024
Objection resolved — Addressed
05/30/2024
Objection resolved — Addressed
05/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2024
Objection raised — Fire_Protection
05/29/2024
Objection raised — Scope
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Scope
05/17/2024
Objection raised — Scope
05/09/2024
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF PLUMBING FIXTURES REPLACEMENT AND ALL ASSOCIATED HARDWARE AND PIPING AT BOTH GROUND AND BASEMENT LEVELS, ALSO TO MAKE ALL REQUIRED CORRECTIONS TO COMPLY WITH PL AND ALL APPLICABLE CODE.
M01046157-I1
04/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/28/2024
Violation issued (ECB, closed)
Construction
12/01/2023
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2022
Filed — Alteration
APPLICATION FLED TO INSTALL NEW PLUMBING FIXTURES, GAS COOKING EQUIPMENTS AND PIPINGS AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00555181-P1
03/09/2022
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
03/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
03/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
SOHAIL HUMAYUN
03/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
SOHAIL HUMAYUN
03/09/2022
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
02/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/14/2021
Permit issued — Mechanical Systems
M00555156-I1-MS
09/29/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2021
Permit issued — Plumbing
M31313490-I1-PL
07/28/2021
Permit issued — Mechanical Systems
M00555156-I1-MS
07/23/2021
Permit issued — Plumbing
M00555181-I1-PL
07/15/2021
Filed — Alteration
APPLICATION FLED TO INSTALL NEW PLUMBING FIXTURES, GAS COOKING EQUIPMENTS AND PIPINGS AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00555181-I1
07/15/2021
Filed — Alteration
APPLICATION FILED FOR NEW SS HOOD, DUCTWORK AND KITCHEN EXHAUST SYSTEM, SPLIT AIR CONDITIONING SYSTEM IN THE COMMERCIAL STORE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00555156-I1
10/09/2018
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSYMMETRICAL CONSTRUC CORP09/19/2025
DOB NOWMechanical SystemsPermit IssuedDIRNO CORPORATION09/27/2024
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT KITCHEN EXHAUS07/09/2024
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT KITCHEN EXHAUS10/14/2021
DOB NOWPlumbingPermit IssuedEMPIRE PLUMBING INC08/09/2021
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT KITCHEN EXHAUS07/28/2021
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC07/23/2021
BISOTISSUEDUNITECH DESIGN INC02/12/2020
BISPLISSUEDKATAN P & H INC09/29/2017
BISOTISSUEDMUSTAFA SHAHIN & AHMED S09/28/2017
BISOTISSUEDMICHELLE KUO CORP03/06/2013
BISEQISSUEDMICHELLE KUO CORP03/06/2013
BISPLISSUEDPREMIER FLOW PLBG AND HTG01/11/2012
BISEQISSUEDPL-EURO CONSTRUCTION CORP01/09/2012
BISOTISSUEDPL-EURO CONSTRUCTION CORP01/09/2012
BISEQISSUEDHI TECH BRIDGING06/16/2004
BISPLISSUEDADVANTAGE PLBG & MECH.COR01/27/2004
BISOTISSUEDLTI CONSTRUCTION CORP10/15/2003
BISPLISSUEDPRIME PIPING & HEATING IN03/24/2003
BISOTISSUEDACME MECH. CONTR. ICN.03/07/2003
BISFBISSUEDBLUE DIAMOND FUEL OIL CORP09/22/1994
BISFBISSUEDSO HO FUEL CO08/21/1990
2 projects · most recent 12/02/2025
Ventilation Systems Air Conditioning Systems
FiledStatusContractorScope
12/02/2025Permit IssuedSYMMETRICAL CONSTRUC CORPVentilation Systems
07/15/2021Permit IssuedDONE RIGHT KITCHEN EXHAUSAir Conditioning Systems, Ventilation Systems
1 project · most recent 03/15/2022
Gas Water/Sanitary
FiledStatusContractorScope
03/15/2022Signed-offEMPIRE PLUMBING INCGas, Water/Sanitary
1 project · most recent 10/03/2019
FiledStatusContractorScope
10/03/2019Permit IssuedINARA ELECTRIC CORP1 meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/26/2025Tenant Protection Plan Compliance—special
07/07/2025FinalMourad Kichaprogress
07/07/2025Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
05/05/2025Tenant Protection Plan Compliance—special
05/01/2025HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
05/01/2025Mechanical SystemsSOHAIL HUMAYUNspecial
05/01/2025FinalSOHAIL HUMAYUNprogress
03/09/2022Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
03/09/2022HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
03/09/2022HVAC-R and service water heating system controlsSOHAIL HUMAYUNenergy_progress
03/09/2022HVAC-R and service water heating equipmentSOHAIL HUMAYUNenergy_progress
03/09/2022Maintenance informationSOHAIL HUMAYUNenergy_progress
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00555156-I1Request digital key ↗
09/02/2026M00555181-I1Request digital key ↗
09/02/2026M00555181-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION8
02/14/2020123703199Open ↗
10/04/2017123290241Open ↗
09/29/2017123290241Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
02/14/2020123703199Open ↗
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit7
08/13/2026M00555156-I1Open ↗
08/13/2026M01046157-P2Open ↗
08/13/2026M01046157-S6Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M01046157-S4Open ↗
09/01/2026M00555181-P1Open ↗
09/01/2026M00555181-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00555156-I1Open ↗
09/02/2026M00555181-I1Open ↗
09/02/2026M00555181-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/13/2020123703199Open ↗
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
03/04/2013121545872Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01046157-S4Open ↗
08/22/2026M01046157-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/04/2013121545872Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
05/07/2012120900052Open ↗
02/23/2012120900052Open ↗
▸BISSCHEDULE B - PLUMBING1
11/23/2011120900052Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/25/2017123290241Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00555156-I1Open ↗
09/02/2026M00555181-I1Open ↗
09/02/2026M00555181-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/25/2017123290241Open ↗
03/08/2013121545872Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/22/2011120900052Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/22/2011120900052Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/13/2020123703199Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/04/2013121545872Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLANDMARKS APPROVAL3
03/13/2020123703199Open ↗
02/03/2020123703199Open ↗
09/25/2017123290241Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/13/2020123703199Open ↗
02/03/2020123703199Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/04/2013121545872Open ↗
11/22/2011120900052Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/13/2020123703199Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/13/2020123703199Open ↗
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
01/29/2020123703199Open ↗
09/25/2017123290241Open ↗
03/08/2013121545872Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
03/13/2020123703199Open ↗