← Back
Walk-up apt, over six families with stores
106 MESEROLE AVENUE
BROOKLYN · BIN 3330097
💬 Discuss this project
1931Year Built
4Stories
C7Building Class
C4-3AZoning
14,634 sfGross Floor Area
16Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 760-764 MANHATTAN AVE. E LLC · 5,000 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
644 730 MANHATTAN AVE R703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2016$11.0M—— → —$752/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PROSPECT ENGINEERING P.C208/01/2022
ZHENG & ASSOCIATES LLC204/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITECH DESIGN INCGeneral Contractor203/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
HP SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROSPECT ENGINEERING P.C.2775208/01/2022
ZHENG & ASSOCIATES LLC7330204/08/2022
Building Lifecycle
All (28)Filed (4)Permit Issued (3)Signed Off (3)Violation (1)Inspection (3)Special Inspection (14)
09/26/2022
Signed off — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ 1ST FLOOR.
B00714543-I1
09/26/2022
Signed off — Alteration
B00714638-I1
09/20/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2022
Signed off — Alteration
PROPOSAL TO INSTALL NON-LLUMINATED, ACCESSORY BUSINESS AWNING ON EXTERIOR WALL.
B00746640-I1
08/15/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/02/2022
Special inspection requirement — Energy Code Compliance Inspections
JUSTIN KIM
08/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUSTIN KIM
08/02/2022
Special inspection requirement — Final
JUSTIN KIM
08/01/2022
Filed — Alteration
PROPOSAL TO INSTALL NON-LLUMINATED, ACCESSORY BUSINESS AWNING ON EXTERIOR WALL.
B00746640-P1
07/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUSTIN KIM
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
JUSTIN KIM
07/27/2022
Special inspection requirement — Final
JUSTIN KIM
07/14/2022
Permit issued — General Construction
B00746640-I1-GC
06/27/2022
Filed — Alteration
PROPOSAL TO INSTALL NON-LLUMINATED, ACCESSORY BUSINESS AWNING ON EXTERIOR WALL.
B00746640-I1
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2022
Permit issued — Plumbing
B00714543-I1-PL
04/15/2022
Permit issued — General Construction
B00714638-I1-GC
04/08/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ 1ST FLOOR.
B00714543-I1
04/08/2022
Filed — Alteration
B00714638-I1
04/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
04/08/2022
Special inspection requirement — Lighting controls
Jinfar Liu
04/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
04/08/2022
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
04/08/2022
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
04/08/2022
Special inspection requirement — Interior lighting power
Jinfar Liu
04/08/2022
Special inspection requirement — Metering
Jinfar Liu
04/07/2022
Special inspection requirement — Final
Jinfar Liu
11/14/2018
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUNITECH DESIGN INC07/14/2022
DOB NOWPlumbingSigned-offHP SERVICES INC05/27/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC04/15/2022
1 project · most recent 06/12/2022
General Wiring
FiledStatusContractorScope
06/12/2022CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/02/2022Energy Code Compliance InspectionsJUSTIN KIMprogress
08/02/2022Structural Stability – Alterations of existing buildingsJUSTIN KIMspecial
08/02/2022FinalJUSTIN KIMprogress
07/27/2022Structural Stability – Alterations of existing buildingsJUSTIN KIMspecial
07/27/2022Energy Code Compliance InspectionsJUSTIN KIMprogress
07/27/2022FinalJUSTIN KIMprogress
04/08/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
04/08/2022Lighting controlsJinfar Liuenergy_progress
04/08/2022Energy Code Compliance InspectionsJinfar Liuprogress
04/08/2022Lighting in dwelling unitsJinfar Liuenergy_progress
04/08/2022Electrical motors and elevatorsJinfar Liuenergy_progress
04/08/2022Interior lighting powerJinfar Liuenergy_progress
04/08/2022MeteringJinfar Liuenergy_progress
04/07/2022FinalJinfar Liuprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/30/2026B00714543-I1Request digital key ↗
08/30/2026B00714638-I1Request digital key ↗
08/29/2026B00746640-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B00714638-I1Open ↗
08/31/2026B00714638-I1Open ↗
08/27/2026B00746640-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/30/2026B00714543-I1Open ↗
08/29/2026B00746640-I1Open ↗
08/29/2026B00746640-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B00714638-I1Open ↗
08/27/2026B00746640-P1Open ↗
08/25/2026B00746640-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/30/2026B00714543-I1Open ↗
08/13/2026B00714638-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00714543-I1Open ↗
08/13/2026B00714638-I1Open ↗