← Back
BuildNYC
One family attached or semi-detached
106 MONAHAN AVENUE
STATEN ISLAND · BIN 5175390
💬 Discuss this project
2024Year Built
2Stories
A5Building Class
R3-1Zoning
1,383 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 2,564 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 213p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
Basement13p · 1 filing · 20 docs
Site & exteriorConstruction fence on property line1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect610/21/2024
Island Associates101/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Island Associates703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wallace Avenue ConstructionScaffold707/08/2026
Wallace Avenue ConstructionGeneral Contractor507/08/2026
A. J. Caruso Electrical IElectrical103/22/2026
DV PlumbingPlumbing107/08/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Island Engineering Associates264210/21/2024
Building Lifecycle
05/07/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00828448-I1-GC-CX
10/21/2024
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00828448-P3
10/21/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
10/21/2024
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWallace Avenue Construction05/07/2024
DOB NOWConstruction FenceSigned-offWallace Avenue Construction05/07/2024
DOB NOWPlumbingSigned-offDV Plumbing03/07/2024
DOB NOWConstruction FenceSigned-offWallace Avenue Construction02/01/2024
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating11/24/2023
DOB NOWCurb CutSigned-offWallace Avenue Construction06/28/2023
DOB NOWStructuralPermit IssuedWallace Avenue Construction05/08/2023
DOB NOWConstruction FenceSigned-offWallace Avenue Construction01/31/2023
DOB NOWConstruction FenceSigned-offWallace Avenue Construction02/02/2022
1 project · most recent 10/21/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/21/2024Signed-offDV PlumbingGas, Storm, Water/Sanitary
1 project · most recent 03/03/2024
General Wiring
FiledStatusContractorScope
03/03/2024CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 10/21/2024
Concrete Wood
FiledStatusContractorScope
10/21/2024Permit IssuedWallace Avenue ConstructionConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/05/2024Pass-Final PL - UndergroundPassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/21/2024Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
10/21/2024Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
10/21/2024Mechanical SystemsWILLIAM DURDEN, P.E.special
10/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
10/21/2024Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
10/21/2024Subgrade InspectionsWILLIAM DURDEN, P.E.special
10/21/2024Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
10/21/2024Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
10/21/2024FinalWILLIAM DURDEN, P.E.progress
10/21/2024Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
10/21/2024Footing and FoundationWILLIAM DURDEN, P.E.progress
10/21/2024Structural Wood FrameWILLIAM DURDEN, P.E.progress
10/21/2024HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
10/21/2024Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
10/21/2024Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
10/21/2024Maintenance informationWILLIAM DURDEN, P.E.energy_progress
10/21/2024Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
10/21/2024Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
10/21/2024HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
10/21/2024Permanent certificateWILLIAM DURDEN, P.E.energy_progress
10/21/2024Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
10/21/2024Fenestration areasWILLIAM DURDEN, P.E.energy_progress
10/21/2024Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
10/21/2024Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
10/21/2024HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 28.
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account