← Back
Two stories - detached, small or mid-size
106 OVERLOOK AVENUE
💬 Discuss this project
1978Year Built
2Stories
A1Building Class
R1-2Zoning
3,260 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,033 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC103/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNATION SOLAR SYSTEMSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842103/05/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/09/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01189480-I1
03/19/2025
Permit issued — Solar
S01189480-I1-SL
03/05/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01189480-I1
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
03/04/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
03/04/2025
Special inspection requirement — Final
CHRIS KIM
03/04/2025
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS03/19/2025
1 project · most recent 02/03/2025
FiledStatusContractorScope
02/03/2025CompleteGALLANT ELEC'L CONST, INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/04/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
03/04/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
03/04/2025Energy Code Compliance InspectionsCHRIS KIMprogress
03/04/2025FinalCHRIS KIMprogress
03/04/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01189480-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S01189480-I1Open ↗
08/31/2026S01189480-I1Open ↗
08/31/2026S01189480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01189480-I1Open ↗
08/31/2026S01189480-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01189480-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01189480-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01189480-I1Open ↗