1061 83 STREET
BROOKLYN · BIN 3152304
💬 Discuss this project
1899Year Built
2.5Stories
A1Building Class
R3XZoning
1,600 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2023$2.1M—Private party → Private party$1,312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC602/11/2025
HALO ARCHITECTURE PLLC402/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KIT RENOVATION CORPGeneral Contractor607/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FACTORY ENGINEERING WORKS8855402/11/2025
HALO ARCHITECTURE PLLC8021302/11/2025
MSM ENGINEERING SERVICES,8449602/11/2025
Building Lifecycle
All (70)Filed (10)Permit Issued (6)Signed Off (4)Inspection (6)Objection (14)Special Inspection (30)
04/22/2025
Signed off — Alteration
PROPOSE HORIZONTAL EXTENSION ON EXISTING 1 FAMILY WITH INTERIOR RENOVATION & FLOOR FINISH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01000788-S1
04/22/2025
Signed off — Alteration
PROPOSE HORIZONTAL EXTENSION ON EXISTING 1 FAMILY WITH INTERIOR RENOVATION & FLOOR FINISH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01000788-I1
04/18/2025
Signed off — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-I1
04/18/2025
Signed off — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-S1
04/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
03/11/2025
Special inspection requirement — Fenestration air leakage
Hanli Liu
03/11/2025
Special inspection requirement — Fenestration areas
Hanli Liu
03/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Hanli Liu
03/11/2025
Special inspection requirement — Air barrier - visual inspection
Hanli Liu
03/11/2025
Special inspection requirement — Interior lighting power
Hanli Liu
03/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kui He
03/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
02/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/19/2025
Permit issued — Plumbing
B00979378-S1-PL
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/11/2025
Filed — Alteration
PROPOSE HORIZONTAL EXTENSION ON EXISTING 1 FAMILY WITH INTERIOR RENOVATION & FLOOR FINISH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01000788-P2
02/11/2025
Filed — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-P4
02/11/2025
Filed — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-P3
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kui He
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
02/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
02/11/2025
Special inspection requirement — Air barrier - visual inspection
Hanli Liu
02/11/2025
Special inspection requirement — Interior lighting power
Hanli Liu
02/11/2025
Special inspection requirement — Fenestration air leakage
Hanli Liu
02/11/2025
Special inspection requirement — Fenestration areas
Hanli Liu
02/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Hanli Liu
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Scope
01/29/2025
Objection raised — Admin
01/23/2025
Filed — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-P2
01/23/2025
Filed — Alteration
PROPOSE HORIZONTAL EXTENSION ON EXISTING 1 FAMILY WITH INTERIOR RENOVATION & FLOOR FINISH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01000788-P1
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
01/22/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/10/2025
Permit issued — General Construction
B01000788-I1-GC
12/24/2024
Permit issued — General Construction
B00979378-I1-GC
12/05/2024
Permit issued — Structural
B01000788-S1-ST
03/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2024
Filed — Alteration
PROPOSE HORIZONTAL EXTENSION ON EXISTING 1 FAMILY WITH INTERIOR RENOVATION & FLOOR FINISH AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01000788-S1
03/19/2024
Special inspection requirement — Structural Steel - Details
Kui He
03/15/2024
Special inspection requirement — Post-installed Anchors
Kui He
03/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kui He
03/14/2024
Special inspection requirement — Final
Kui He
03/13/2024
Filed — Alteration
Proposed interior demolition work on existing 1 family building as per plans. No change in use, egress, or occupancy under this application.
B00979378-P1
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
02/16/2024
Objection resolved — Addressed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL02/19/2025
DOB NOWGeneral ConstructionSigned-offKIT RENOVATION CORP01/10/2025
DOB NOWGeneral ConstructionSigned-offKIT RENOVATION CORP12/24/2024
DOB NOWStructuralSigned-offKIT RENOVATION CORP12/05/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL01/25/2024
DOB NOWGeneral ConstructionSigned-offKIT RENOVATION CORP12/27/2023
BISEQISSUEDSALVATORE BASILE, INC.10/21/1993
1 project · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
03/11/2025Fire-Resistant Penetrations and JointsHanli Liuspecial
03/11/2025Energy Code Compliance InspectionsHanli Liuprogress
03/11/2025Fenestration air leakageHanli Liuenergy_progress
03/11/2025Fenestration areasHanli Liuenergy_progress
03/11/2025Fenestration and door U-factor and product ratingsHanli Liuenergy_progress
03/11/2025Air barrier - visual inspectionHanli Liuenergy_progress
03/11/2025Interior lighting powerHanli Liuenergy_progress
03/11/2025Structural Stability – Alterations of existing buildingsKui Hespecial
03/11/2025Fire-Resistance Rated ConstructionHanli Liuprogress
02/13/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/13/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/11/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/11/2025Structural Stability – Alterations of existing buildingsKui Hespecial
02/11/2025Energy Code Compliance InspectionsHanli Liuprogress
02/11/2025Fire-Resistance Rated ConstructionHanli Liuprogress
02/11/2025Air barrier - visual inspectionHanli Liuenergy_progress
02/11/2025Interior lighting powerHanli Liuenergy_progress
02/11/2025Fenestration air leakageHanli Liuenergy_progress
02/11/2025Fenestration areasHanli Liuenergy_progress
02/11/2025Fenestration and door U-factor and product ratingsHanli Liuenergy_progress
02/11/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/11/2025Fire-Resistant Penetrations and JointsHanli Liuspecial
01/22/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/22/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/22/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
Latest 25 of 32.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026B00979378-I1Request digital key ↗
08/25/2026B00979378-P4Request digital key ↗
08/25/2026B00979378-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01000788-I1Open ↗
08/13/2026B01000788-P1Open ↗
08/13/2026B01000788-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B01000788-I1Open ↗
08/13/2026B01000788-P1Open ↗
08/13/2026B01000788-P2Open ↗
▸Seals & Professional Certifications31
▸DOB NOWSpecial Inspector Seal & Signature11
09/10/2026B01000788-S1Open ↗
09/10/2026B01000788-S1Open ↗
09/10/2026B01000788-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/10/2026B01000788-S1Open ↗
08/31/2026B01000788-I1Open ↗
08/31/2026B01000788-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026B00979378-P2Open ↗
08/25/2026B00979378-P1Open ↗
08/25/2026B00979378-S1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026B00979378-P2Open ↗
08/25/2026B00979378-P1Open ↗
08/25/2026B00979378-S1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026B01000788-I1Open ↗
08/13/2026B01000788-P1Open ↗
08/13/2026B01000788-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01000788-I1Open ↗
08/13/2026B01000788-P1Open ↗
08/13/2026B01000788-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B01000788-P2Open ↗
08/13/2026B01000788-I1Open ↗
08/13/2026B01000788-P1Open ↗