1061 GRANT AVENUE
BRONX · BIN 2002634
💬 Discuss this project
1935Year Built
2Stories
C3Building Class
R7-1Zoning
4,722 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · Owner of record: 1061 MANAGEMENT LLC · 2,500 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Floor 225p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar1p · 1 filing · 2 docs
Basement28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT1207/08/2026
1061 MANAGEMENT LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/17/2024$1.2M—— → —$249/sf building
01/24/2019$365K—— → —$77/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES1309/12/2025
PRAMODRAY SHAH, P.E.107/15/2025
VASILIOS ARTEMIOU PE311/04/2024
LEE ENGINEERING, P.C.107/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1703/21/2026
KC EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor307/08/2026
INDY ELECTRIC CORP.Electrical103/22/2026
C.R.U. MECHAN & HEATIN INFire Protection107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161209/12/2025
SHAHRISH SHUVO ENGINEERIN8524107/15/2025
LEE ENGINEERING, P.C.2157107/16/2019
Building Lifecycle
All (113)Filed (18)Permit Issued (6)Signed Off (5)Violation (28)Inspection (14)Objection (12)Special Inspection (30)
12/17/2025
Signed off — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-S4
09/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/19/2025
Special inspection requirement — Metering
FAHAD FATEH
09/19/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/19/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/19/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
09/19/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/19/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/19/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/19/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/12/2025
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-A6
09/11/2025
Permit issued — Structural
X01023859-S4-ST
08/08/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Structural
07/15/2025
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-S4
07/14/2025
Special inspection requirement — Masonry
Shahrish Shuvo
07/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
07/03/2025
Special inspection requirement — Structural Cold-Formed Steel
Shahrish Shuvo
07/03/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
06/25/2025
Special inspection requirement — Final
PRAMODRAY SHAH
06/05/2025
Violation issued (HPD, closed)
A
05/30/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/30/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/30/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/30/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/30/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/30/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/22/2025
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-A5
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2025
Signed off — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-S3
02/03/2025
Signed off — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-S2
01/09/2025
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-A2
01/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2024
Objection resolved — Addressed
12/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2024
Signed off — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-S1
12/03/2024
Violation issued (HPD, closed)
I
11/27/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-A1
11/21/2024
Objection raised — Other
11/21/2024
Objection resolved — Addressed
11/20/2024
Objection raised — Other
11/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-P9
11/04/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-P6
10/31/2024
Filed — Alteration CO
Existing 2 story and basement, 4-Family to be converted into a 10-unit building
X01023859-P7
10/29/2024
Permit issued — General Construction
X01023859-I1-GC
09/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP09/11/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP10/29/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC08/14/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/17/2024
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP07/12/2024
DOB NOWSprinklersSigned-offC.R.U. MECHAN & HEATIN IN12/09/2022
BISPLISSUEDC.R.U. MECHAN & HEAT INC12/16/2022
BIS—ISSUEDKDK CONSTRUCTION CORP11/07/2022
BIS—ISSUEDKDK CONSTRUCTION CORP08/02/2021
BISPLISSUEDC.R.U. MECHAN & HEAT INC03/12/2021
BIS—ISSUEDKISHAN PLUMBING & HEATING03/10/2020
BIS—ISSUEDKISHAN PLUMBING & HEATING08/30/2019
1 project · most recent 09/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXF12AXVJU 84,000 BTU · Heat Pump Outdoor ×14
3MXS24WMVJU9 48,000 BTU · Heat Pump Outdoor ×4
2MXS18WMVJU9 18,000 BTU · Heat Pump Outdoor ×2
RXS12LVJU 84,000 BTU · Heat Pump Outdoor ×7
2MXS18LNMVJUA 54,000 BTU · Heat Pump Outdoor ×3
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×30
QTXEN150 150 CFM · Kitchen Exhaust ×30
1 project · most recent 09/12/2025
Sprinkler System
FiledStatusContractorScope
09/12/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/12/2025
Water/Sanitary
FiledStatusContractorScope
09/12/2025Signed-offA M B MECHANICAL INCWater/Sanitary
3 projects · most recent 07/05/2024
General Wiring Lighting
FiledStatusContractorScope
07/05/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
04/29/2021CompleteBDS ELECTRIC CORP.General Wiring, Lighting
05/04/2019CompleteINDY ELECTRIC CORP.General Wiring
1 project · most recent 09/12/2025
Steel Masonry Wood
FiledStatusContractorScope
09/12/2025Signed-offMJH CONSTRUCTION CORPSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
09/19/2025Permanent certificateFAHAD FATEHenergy_progress
09/19/2025MeteringFAHAD FATEHenergy_progress
09/19/2025Lighting controlsFAHAD FATEHenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/19/2025Exterior lighting powerFAHAD FATEHenergy_progress
09/19/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/19/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/19/2025Interior lighting powerFAHAD FATEHenergy_progress
09/19/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/19/2025Fenestration areasFAHAD FATEHenergy_progress
09/19/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
09/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/14/2025MasonryShahrish Shuvospecial
07/03/2025Structural Steel - DetailsShahrish Shuvospecial
07/03/2025Structural Cold-Formed SteelShahrish Shuvospecial
07/03/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
06/25/2025FinalPRAMODRAY SHAHprogress
05/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/30/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/30/2025Fenestration areasFAHAD FATEHenergy_progress
05/30/2025Exterior lighting powerFAHAD FATEHenergy_progress
05/30/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 118.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch17
08/21/2026X01023859-P4Request digital key ↗
08/21/2026X01023859-P2Request digital key ↗
08/21/2026X01023859-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/26/2026X00194277-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION8
10/11/2023220688101Open ↗
10/03/2023220688101Open ↗
08/25/2023220688101Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
12/16/2022220688101Open ↗
11/09/2022220688101Open ↗
08/03/2021220688101Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/13/2021220688101Open ↗
—220688101Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/22/2023220688101Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/18/2022220688101Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026X00194277-I1Open ↗
08/21/2026X01023859-P4Open ↗
08/21/2026X01023859-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/31/2026X01023859-S4Open ↗
08/29/2026X01023859-A6Open ↗
08/29/2026X01023859-A6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/29/2026X01023859-S3Open ↗
08/31/2026X01023859-S4Open ↗
08/29/2026X01023859-A6Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/05/2019220688101Open ↗
03/19/2019220688101Open ↗
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/22/2023220688101Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/22/2023220688101Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/19/2019220688101Open ↗
▸BISHEATING SYSTEMS1
02/21/2023220688101Open ↗
▸BISSCHEDULE B - PLUMBING1
03/29/2021220688101Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/13/2026X01023859-A2Open ↗
08/13/2026X01023859-A1Open ↗
08/13/2026X01023859-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
03/19/2019220688101Open ↗
▸BISSTREET TREE SIGNOFF1
08/08/2023220688101Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01023859-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/21/2026X01023859-P3Open ↗
08/21/2026X01023859-P2Open ↗
08/21/2026X01023859-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/19/2019220688101Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/05/2019220688101Open ↗
03/19/2019220688101Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/22/2023220688101Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/22/2023220688101Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/21/2023220688101Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2023220688101Open ↗
▸BISFENESTRATION AREAS1
08/22/2023220688101Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/21/2023220688101Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/22/2023220688101Open ↗
▸Inspections & Test Reports2
▸BISMECHANICAL SYSTEMS1
02/21/2023220688101Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/21/2023220688101Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSUPERSEDING LETTER3
08/03/2021220688101Open ↗
03/18/2021220688101Open ↗
09/03/2019220688101Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/01/2023220688101Open ↗
03/18/2021220688101Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/19/2019220688101Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/11/2019220688101Open ↗
03/19/2019220688101Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/22/2023220688101Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
02/01/2023220688101Open ↗
04/01/2021220688101Open ↗
▸BISBOROUGH INTAKE FORM1
11/09/2022220688101Open ↗
▸BISEFILING COVER SHEET1
03/19/2019220688101Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification6
08/21/2026X01023859-P1Open ↗
08/21/2026X01023859-I1Open ↗
08/21/2026X01023859-A6Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
03/19/2019220688101Open ↗
▸BISMAINTENANCE INFORMATION1
08/22/2023220688101Open ↗
▸BISPERMANENT CERTIFICATE1
08/22/2023220688101Open ↗
▸BISCHIMNEYS AND VENTS1
02/21/2023220688101Open ↗