ECB03/18/2022FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXP#1 ROOF OVER MAIN ENTRYWAY IN STATE OF DISREPAIR,MISSING SHINGLES,PARTIALLY COVERED W/A SILVER TARP. ALSO AT EXP#1 MISSING$12K due
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB12/07/2021FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.BLDG IN STATE OF DISREPAIR.MISSING ROOF SHINGLES,SOFFITS MISSING,JOIST OPEN TO ELEMENTS.REPAIR &/OR REPLACE$6K due
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/18/2021FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.ATOI OBSERVED BLDG INSTATE OF DISREPAIR.MISSING ROOF,SHINGLES,GUTTER,ROOF JOIST OPEN TO SEEELEMENT.REPAIR &/OR REPLACE$12K due
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB08/30/2021FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:NOTED:BLDG IN STATE OF DISREPAIR,MISSING ROOF SHINGLES,GUTTERS,ROOF JOISTS,OPEN TO ELEMENTS&RODENTS.COMPLY W/CODE.$12K due
DOB08/04/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB06/28/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED DURING INSPECTION OBSERVED BUILDING IN STATE OF DISREPAIR WITH SEVERAL DETERIORATED AND MISSING ROOF SHINGLES EXPOSED WOODEN ROOF JOISTS AND 1ST AND 2$12K due
DOB06/09/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB05/10/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: BLDG IN STATE OF DISREPAIR W/MISSING & DETERIORATED ROOF SHINGLES EXPOSED WOODEN JOISTS,AT EXP#1 BROKEN & MISSING A SECTION OF DOWNSPOUT AT EXP#4 PARTIA$12K due
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/09/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: BLDG IN STATE OF DISREPAIR W/DETERIORATED & MISSING ROOF SHINGLES,EXPOSED ROOF WOODEN JOISTS,AT EXP#2 BROKEN DOWNSPOUT W/A MISSING SECTIONS AT EXP#4 BRO$12K due
ECB01/08/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED:BLDG IN STATE OF DISREPAIR W/DETERIORATED & MISSING ROOF SHINGLES,EXPOSED ROOF WOODEN JOISTS,BROKEN DOWNSPOUT AT EXP-4 & DISREPAIR EXTERIOR WALLS.REMEDY:R$12K due
DOB12/23/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/02/2020FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS IN A CODE COMPLIANT MANNER. NOTED: BUILDING EXTERIOR WALLS IN DISREPAIR WITH DETERIORATED AND MISSING ROOF SHINGLES, EXPOSED ROOF WOOD JOISTS AND BROKEN RAIN GUTTER.,$6K due
Two stories - detached, small or mid-size · 2,554 sf lot · 0.58 FAR built · Flood zone X