Miscellaneous hospital / health care facility
1055 63RD STREET
BROOKLYN · BIN 3430114
💬 Discuss this project
1931Year Built
9Stories
I9Building Class
R5BZoning
29,658 sfGross Floor Area
3Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: 1055 63RD LLC · 13,093 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 20 docs
Floor 3Under Construction10p · 1 filing · 20 docs
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1055 63 LLC603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEEL CORE ENGINEERING PLLC301/22/2026
LEONID SEGAL212/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BDP EXPEDITERS GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME PIPING & HEATING INFire Protection108/30/2026
PRIME PIPING & HEATING INPlumbing108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO5939201/22/2026
Building Lifecycle
All (63)Filed (5)Permit Issued (2)Objection (26)Special Inspection (30)
08/27/2026
Permit issued — Sprinklers
B01197727-S3-EW-SP
08/26/2026
Permit issued — Plumbing
B01197727-S2-PL
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
02/10/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Other
02/09/2026
Objection raised — Energy
02/09/2026
Objection raised — Mechanical
02/06/2026
Objection raised — Energy
02/06/2026
Objection raised — Admin
01/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HUB Consultation accepted on 04/04/2025. Vertical enlargement to Existing two story Building. Three Story and cellar Building.
B01197727-S3
01/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HUB Consultation accepted on 04/04/2025. Vertical enlargement to Existing two story Building. Three Story and cellar Building.
B01197727-S4
01/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HUB Consultation accepted on 04/04/2025. Vertical enlargement to Existing two story Building. Three Story and cellar Building.
B01197727-S2
01/14/2026
Objection raised — Admin
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/31/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HUB Consultation accepted on 04/04/2025. Vertical enlargement to Existing two story Building. Three Story and cellar Building.
B01197727-S1
12/31/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jose Lockhart
12/31/2025
Special inspection requirement — Structural Steel - Details
12/31/2025
Special inspection requirement — Structural Cold-Formed Steel
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/31/2025
Special inspection requirement — Ventilation and air distribution system
12/31/2025
Special inspection requirement — Maintenance information
12/31/2025
Special inspection requirement — Structural Steel - Welding
12/31/2025
Special inspection requirement — Structural Steel - High Strength Bolting
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jose Lockhart
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Lockhart
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Lockhart
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Lockhart
12/30/2025
Special inspection requirement — Maintenance information
Jose Lockhart
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jose Lockhart
12/22/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/25/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Special inspection requirement — Sprinkler Systems
07/23/2025
Special inspection requirement — Final
07/23/2025
Special inspection requirement — Mechanical Systems
07/23/2025
Special inspection requirement — Final
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Energy
06/13/2025
Objection raised — Scope
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Cost
06/13/2025
Objection raised — Admin
05/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HUB Consultation accepted on 04/04/2025. Vertical enlargement to Existing two story Building. Three Story and cellar Building.
B01197727-I1
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/09/2025
Special inspection requirement — Air barrier - visual inspection
04/09/2025
Special inspection requirement — Air barrier — testing
04/09/2025
Special inspection requirement — Permanent certificate
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN08/27/2026
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN08/26/2026
1 project · most recent 01/22/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/22/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-KA18NAHZ.TH 18,000 BTU · Condensing Unit ×8
PUMYP48NKMU3 48,000 BTU · Vrf Outdoor ×2
1 project · most recent 01/22/2026
Sprinkler System
FiledStatusContractorScope
01/22/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
1 project · most recent 01/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/22/2026Permit IssuedPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
01/12/2026Fire-Resistant Penetrations and Joints—special
12/31/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJose Lockhartspecial
12/31/2025Structural Steel - Details—special
12/31/2025Structural Cold-Formed Steel—special
12/31/2025HVAC-R and service water piping design and insulation—energy_progress
12/31/2025HVAC-R and service water heating equipment—energy_progress
12/31/2025HVAC-R and service water heating system controls—energy_progress
12/31/2025Ventilation and air distribution system—energy_progress
12/31/2025Maintenance information—energy_progress
12/31/2025Structural Steel - Welding—special
12/31/2025Structural Steel - High Strength Bolting—special
12/30/2025HVAC-R and service water heating equipmentJose Lockhartenergy_progress
12/30/2025Fire-Resistant Penetrations and JointsJose Lockhartspecial
12/30/2025Energy Code Compliance InspectionsJose Lockhartprogress
12/30/2025HVAC-R and service water piping design and insulationJose Lockhartenergy_progress
12/30/2025Maintenance informationJose Lockhartenergy_progress
12/30/2025HVAC-R and service water heating system controlsJose Lockhartenergy_progress
12/22/2025Structural Stability – Alterations of existing buildings—special
12/22/2025Structural Stability – Alterations of existing buildings—special
07/23/2025Sprinkler Systems—special
07/23/2025Final—progress
07/23/2025Mechanical Systems—special
07/23/2025Final—progress
04/09/2025Fire-Resistant Penetrations and Joints—special
04/09/2025Air barrier - visual inspection—energy_progress
Latest 25 of 39.
▾Documents — 24 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B01197727-S4Open ↗
08/13/2026B01197727-S1Open ↗
08/13/2026B01197727-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01197727-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01197727-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01197727-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B01197727-S4Open ↗
08/13/2026B01197727-I1Open ↗
08/13/2026B01197727-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01197727-S2Open ↗
09/02/2026B01197727-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01197727-S2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B01197727-S3Open ↗
08/13/2026B01197727-S2Open ↗
08/13/2026B01197727-S4Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01197727-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01197727-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01197727-I1Open ↗