ECB10/27/2022VACATED LOT OCCUPIED AND USED AS STORAGE IN VIOLATION OF VACATE ORDER# X159/2020. THERE IS CONSTRUCTION MATERIALS, EQUIPMENT, METAL BEAMS, PLATES, PIPES, REBARS, FLOOR, JOINTS, GAS CONTAINERS STORED AT THE PROP$25K due
ECB06/28/2022VACATED LOT OCCUPIED AND USED AS STORAGE IN VIOLATION OF VACATE ORDER # X159/2020. THERE IS CONSTRUCTION MATERIALS: METAL BEAMS, PLATES, PIPES, REBARS, FLOOR, JOINTS STORED ON THE LOT. THERE IS CONSTRUCTION EQU$2K due
DOB06/23/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB04/02/2021WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, DEMOLITION OF RETAINING WALL WITHOUT PERMIT, NO PLANS FILED FOR SAFETY MEASURES. RETAINING WALL DEMO WORK DONE ADJACENT TO MTA RAIL TRACK WHICH IS HAZARDO$12K due
ECB11/05/2020UNLAWFUL ACTS. FAILURE TO COMPLY W/ AN ORDER OF THE COMMISSIONER. NOTED:AT THE TIME OF INSPECTION WE NOTED THAT THE RESPONDENT HAD FAILED TOCOMMENCE ANY REPAIRS TO THE RW AS PREVIOUSLY DIRECTED W/ COMMISSIONER$2K due
ECB11/05/2020FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION. NOTED:AT THE TIME OF INSPECTION WE NOTED THAT THE RW LOCATED AT THE REAR OF THE PROPERTY,DIRECTLY ADJACENT TO METRO-NORTH RAILROAD,HAS STRUCTURALLY FAILED$6K due
DOB10/02/20201) IMMEDIATELY DEMOLISH CMU RW. 2) CREATE ON YOUR PROPERTY A STABLE SLOPE TO PROTECT METRO NORTH PROPERTY AND TRAFFIC
ECB04/12/2018FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION.NOTED:AT THE TIME OF INSPECTION WE OBSERVED THAT THE RETAINING WALL LOCATED AT THE REAR OF THE PROPERTY DIRECTLY ADJACENT TO THE METRO-NORTH RAILROAD HAS S$6K due
ECB04/12/2018REMOVED A WRITTEN POSTED VACATE ORDER.NOTED:AT TIME OF INSPECTION WE NOTED THA THE PREVIOUS POSTED VACATE (VACATE #:X070/18)AS PER THE VACATE POSTED ON APRIL,4,2018 ALL VEHICLES LOCATED AT THE PROPERTY WERE TO$2K due
ECB04/06/2018FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER.NOTED:AT THE TIMEOF INSPECTION WE NOTED THAT THE RESPONDENT HAD WILLFULLY IGNORED THE PREVIOUSLY POSTED VACATE ORDER AND HE HAD CONTINUED USING THE PARKING$5K due
ECB03/29/2018FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION. NOTED: AT THE TIME OF INSPECTION WE OBSERVED THAT THE RETAINING WALL LOCATED AT THE REAR OF THE PROPERTY DIRECTLY ADJACENT TO THE METRO NORTH RAILROAD HAS$6K due
ECB03/29/2018FAILURE TO IMMEDIATELY NOTIFY DEPARTMENT THAT A BUILDING OR STRUCTURE HAS BECOME POTENTIALLY COMPROMISED. NOTED: AT THE TIME OF INSPECTION RESPONDING TO AN MTA RAILROAD COMPLAINT, WE NOTED THAT THE EXISTING RET$2K due
ECB03/29/201828-216.1.1 COMPROMISED STRUCTURE. NEEDS TO BE DEMOLISHED AND REMOVED OR MADE SAFE AND SECURED. NOTED: AT THE TIME OF INSPECTION WE OBSERVED ALONG EXPOSURE #3 (REAR OF THE PROPERTY) THAT THE EXISTING RETAINING W$2K due
DOB03/29/2018REQUEST ADDITIONAL INFORMATION STRUCTURAL ASSESSMENT REPORT. OWNER.IS DIRECTED TO IMMED RETAIN A LICENSED STRUCTURAL ENGINEER & TO PROVIDE TO THE NYCDOB RWU A STRUCTURAL ASSESSMENT REPORT & DEMO, STABILIZATION & REPAIR DRAWINGS FOR THE R/W ADJACENT TO MTA RAILROAD NO LATER THAN APRIL 16, 2018