← Back
Elevator apt, semi-fireproof without stores
Br Affordable
1065 BOSTON ROAD · BIN 2004188
💬 Discuss this project
1906Year Built
6Stories
D1Building Class
R6Zoning
76,400 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized15 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION · 27,024 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARRY CONSTRUCTION GROUP607/08/2026
APARTMENT REHABILITATION CORP1207/08/2026
BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION103/22/2026
BR AFFORDABLE JV LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS103/18/2025
P. M. ARCHITECTURE, PC310/14/2024
ASR ENGINEERING PC107/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
PM ARCHITECTURE PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCORD POWER INCGeneral Contractor203/21/2026
HARRY CONSTRUCTION GROUPGeneral Contractor107/08/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561103/18/2025
METRIC CONSULTING AND INS1803310/14/2024
Building Lifecycle
All (77)Filed (6)Permit Issued (5)Signed Off (4)Violation (38)Special Inspection (24)
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
C
10/30/2025
Violation issued (HPD, closed)
B
10/30/2025
Violation issued (HPD, closed)
C
10/23/2025
Signed off — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080471-I1
10/23/2025
Permit issued — Suspended Scaffold
X01080471-I1-SC
10/10/2025
Signed off — Alteration
Interior renovation work of corridors, basement as per plan, roof replacement, parapet work and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991356-I1
07/01/2025
Signed off — Alteration
Installation of 9.315 kw solar energy system on roof. No change of occupancy, use or egress
X01187544-I1
03/31/2025
Permit issued — Solar
X01187544-I1-SL
03/18/2025
Filed — Alteration
Installation of 9.315 kw solar energy system on roof. No change of occupancy, use or egress
X01187544-I1
03/13/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01078707-I1
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
10/14/2024
Filed — Alteration
Interior renovation work of corridors, basement as per plan, roof replacement, parapet work and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991356-P2
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/11/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
10/11/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/26/2024
Filed — Alteration
Interior renovation work of corridors, basement as per plan, roof replacement, parapet work and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991356-P1
07/22/2024
Permit issued — Suspended Scaffold
X01080471-I1-SC
07/16/2024
Filed — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080471-I1
07/16/2024
Permit issued — Sidewalk Shed
X01078707-I1-SH
07/12/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01078707-I1
06/24/2024
Permit issued — General Construction
X00991356-I1-GC-CX
06/05/2024
Violation issued (HPD, closed)
A
06/05/2024
Violation issued (HPD, closed)
A
04/24/2024
Filed — Alteration
Interior renovation work of corridors, basement as per plan, roof replacement, parapet work and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991356-I1
01/23/2024
Violation issued (HPD, closed)
A
02/04/2022
Violation issued (HPD, closed)
B
02/04/2022
Violation issued (HPD, closed)
C
01/24/2022
Violation issued (HPD, closed)
A
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
A
08/27/2019
Violation issued (HPD, closed)
A
08/27/2019
Violation issued (HPD, closed)
A
10/02/2017
Violation issued (HPD, closed)
A
10/02/2017
Violation issued (HPD, closed)
A
11/14/2016
Violation issued (HPD, closed)
A
11/14/2016
Violation issued (HPD, closed)
B
11/14/2016
Violation issued (HPD, closed)
B
11/14/2016
Violation issued (HPD, closed)
C
11/14/2016
Violation issued (HPD, closed)
C
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP10/23/2025
DOB NOWSolarSigned-offACCORD POWER INC03/31/2025
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP07/22/2024
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/16/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR06/24/2024
2 projects · most recent 03/18/2025
FiledStatusContractorScope
03/18/2025CompleteACCORD POWER ELECTRIC LLC—
07/17/2024CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/16/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/16/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/16/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/16/2024FinalSAMI HAJJAR P.Eprogress
10/16/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/16/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
10/16/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
10/16/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
10/16/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/16/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
10/16/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/16/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
10/11/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/11/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/11/2024Tenant Protection Plan Compliance—special
10/11/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/11/2024FinalSAMI HAJJAR P.Eprogress
10/11/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/11/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
10/11/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/11/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
10/11/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
10/11/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
10/11/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026X00991356-I1Request digital key ↗
08/21/2026X00991356-P2Request digital key ↗
08/21/2026X00991356-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026X00991356-P2Open ↗
09/29/2026X00991356-P2Open ↗
09/01/2026X00991356-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026X00991356-I1Open ↗
08/21/2026X00991356-P1Open ↗
08/19/2026X01187544-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026X00991356-P2Open ↗
09/01/2026X00991356-I1Open ↗
09/01/2026X00991356-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026X00991356-I1Open ↗
08/21/2026X00991356-P1Open ↗
08/13/2026X00991356-P2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00991356-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01187544-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026X00991356-P1Open ↗
08/21/2026X00991356-I1Open ↗
08/13/2026X00991356-P2Open ↗
▸DOB NOWCalculations1
08/13/2026X01080471-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01080471-I1Open ↗