← Back
Elevator apt, semi-fireproof without stores
Br Affordable
1065 BOSTON ROAD · BIN 2004190
💬 Discuss this project
1906Year Built
6Stories
D1Building Class
R6Zoning
76,400 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized15 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: BR AFFORDABLE HOUSING DEVELOPMENT FUND C ORPORATION · 27,024 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
Architecture
Roof4p · 2 filings · 20 docs
Basement2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARRY CONSTRUCTION GROUP607/08/2026
APARTMENT REHABILITATION CORP1004/09/2026
BR AFFORDABLE JV LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS103/18/2025
P. M. ARCHITECTURE, PC210/11/2024
ASR ENGINEERING PC107/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC403/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCORD POWER INCGeneral Contractor203/21/2026
HARRY CONSTRUCTION GROUPGeneral Contractor107/08/2026
LEMLE & WOLFF CONSTR CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561103/18/2025
METRIC CONSULTING AND INS1803210/11/2024
Building Lifecycle
All (97)Filed (5)Permit Issued (5)Signed Off (4)Violation (51)Objection (2)Special Inspection (30)
01/12/2026
Signed off — Alteration
Interior renovation work of corridors, cellar, roof, and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991349-I1
10/23/2025
Signed off — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080470-I1
10/23/2025
Permit issued — Suspended Scaffold
X01080470-I1-SC
08/10/2025
Violation issued (HPD, closed)
B
06/30/2025
Signed off — Alteration
Installation of 9.315 kw solar energy system on roof. No change of occupancy, use or egress
X01187298-I1
03/31/2025
Permit issued — Solar
X01187298-I1-SL
03/18/2025
Filed — Alteration
Installation of 9.315 kw solar energy system on roof. No change of occupancy, use or egress
X01187298-I1
03/13/2025
Signed off — Alteration
X01078671-I1
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
02/26/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
10/16/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/11/2024
Filed — Alteration
Interior renovation work of corridors, cellar, roof, and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991349-P1
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Lighting in dwelling units
09/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
09/27/2024
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
08/01/2024
Permit issued — Suspended Scaffold
X01080470-I1-SC
07/31/2024
Objection raised — Other
07/31/2024
Objection resolved — Addressed
07/23/2024
Filed — Alteration
OUTRIGGER FOR FACADE REPAIR.
X01080470-I1
07/12/2024
Permit issued — Sidewalk Shed
X01078671-I1-SH
07/11/2024
Filed — Alteration
X01078671-I1
06/24/2024
Permit issued — General Construction
X00991349-I1-GC-CX
05/22/2024
Violation issued (HPD, closed)
C
04/24/2024
Filed — Alteration
Interior renovation work of corridors, cellar, roof, and facade work as per plan. No change to use, egress, or occupancy under this filing.
X00991349-I1
10/27/2022
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
C
10/27/2022
Violation issued (HPD, closed)
A
01/29/2021
Violation issued (HPD, closed)
A
01/29/2021
Violation issued (HPD, closed)
A
01/29/2021
Violation issued (HPD, closed)
B
01/29/2021
Violation issued (HPD, closed)
B
01/29/2021
Violation issued (HPD, closed)
C
01/29/2021
Violation issued (HPD, closed)
C
07/09/2020
Violation issued (HPD, closed)
B
07/09/2020
Violation issued (HPD, closed)
A
07/09/2020
Violation issued (HPD, closed)
B
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP10/23/2025
DOB NOWSolarSigned-offACCORD POWER INC03/31/2025
DOB NOWSuspended ScaffoldSigned-offHARRY CONSTRUCTION GROUP08/01/2024
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/12/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR06/24/2024
2 projects · most recent 03/18/2025
FiledStatusContractorScope
03/18/2025CompleteACCORD POWER ELECTRIC LLC—
07/15/2024CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/26/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
02/26/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
02/26/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
02/26/2025FinalMalathi Ananthakrishnanprogress
02/26/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
10/16/2024Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
10/16/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
10/16/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/16/2024Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
10/16/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/16/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
10/16/2024Interior lighting powerSAMI HAJJAR P.Eenergy_progress
10/16/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/16/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/16/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/16/2024FinalSAMI HAJJAR P.Eprogress
10/16/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/27/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/27/2024Mechanical SystemsSAMI HAJJAR P.Especial
09/27/2024Tenant Protection Plan Compliance—special
09/27/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/27/2024FinalSAMI HAJJAR P.Eprogress
09/27/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
09/27/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
09/27/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
Latest 25 of 30.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X01078671-I1Request digital key ↗
08/21/2026X01080470-I1Request digital key ↗
08/20/2026X00991349-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026X00991349-P1Open ↗
08/31/2026X00991349-P1Open ↗
08/25/2026X01187298-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026X00991349-P1Open ↗
08/25/2026X01187298-I1Open ↗
08/25/2026X01187298-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X01078671-I1Open ↗
08/13/2026X00991349-P1Open ↗
08/13/2026X01187298-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00991349-I1Open ↗
08/13/2026X00991349-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01187298-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00991349-P1Open ↗
08/13/2026X00991349-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01080470-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01080470-I1Open ↗