← Back
Three families
1066 77 STREET
BROOKLYN · Dyker Heights · BIN 3150103
💬 Discuss this project
1950Year Built
2Stories
C0Building Class
R4-1Zoning
2,475 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 2 filings · 11 docs
Floor 12p · 2 filings · 11 docs
Basement1p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2023$1.4M—— → —$545/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G ENGINEERING PC408/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor603/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778208/03/2023
Building Lifecycle
All (26)Filed (4)Permit Issued (3)Signed Off (2)Violation (8)Inspection (4)Special Inspection (5)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
08/11/2023
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00856971-I1
08/11/2023
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ELECTICAL HOT WATER HEATERS ON BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
B00856973-I1
08/09/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/03/2023
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ELECTICAL HOT WATER HEATERS ON BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
B00856973-P1
08/03/2023
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00856971-P1
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
08/03/2023
Special inspection requirement — Mechanical Systems
XIONGCAI GU
08/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
08/03/2023
Special inspection requirement — Final
XIONGCAI GU
05/26/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2023
Permit issued — General Construction
B00856971-I1-MS
04/13/2023
Permit issued — General Construction
B00856971-I1-GC
04/13/2023
Permit issued — Plumbing
B00856973-I1-PL
04/11/2023
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00856971-I1
04/11/2023
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW ELECTICAL HOT WATER HEATERS ON BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
B00856973-I1
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC04/13/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC04/13/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/13/2023
1 project · most recent 04/24/2023
General Wiring
FiledStatusContractorScope
04/24/2023CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/09/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/03/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
08/03/2023Mechanical SystemsXIONGCAI GUspecial
08/03/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
08/03/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
08/03/2023FinalXIONGCAI GUprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00856973-P1Request digital key ↗
08/27/2026B00856973-I1Request digital key ↗
08/27/2026B00856971-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00856973-P1Open ↗
08/27/2026B00856973-I1Open ↗
08/27/2026B00856971-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00856971-I1Open ↗
09/01/2026B00856971-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00856971-I1Open ↗