← Back
Two family converted from one family
1066 82 STREET
BROOKLYN · Dyker Heights · BIN 3152298
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3XZoning
1,600 sfGross Floor Area
2Units
Two family converted from one family · 2,425 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAZZARENO CALLIPO P.E.308/14/2026
Building Lifecycle
All (40)Filed (3)Objection (18)Special Inspection (19)
09/10/2026
Objection raised — Inspections
09/10/2026
Objection raised — Inspections
08/31/2026
Objection resolved — Addressed
08/31/2026
Objection resolved — Open
08/31/2026
Objection resolved — Open
08/31/2026
Objection resolved — Addressed
08/31/2026
Objection resolved — Addressed
08/31/2026
Objection resolved — Addressed
08/28/2026
Objection raised — Scope
08/28/2026
Objection raised — Other
08/28/2026
Objection raised — Scope
08/28/2026
Objection raised — Scope
08/20/2026
Objection raised — Fire_Protection
08/20/2026
Objection raised — Zoning
08/20/2026
Objection raised — Admin
08/20/2026
Objection raised — Scope
08/20/2026
Objection raised — Scope
08/20/2026
Objection raised — Other
08/14/2026
Filed — Alteration CO
Plumbing alterations to existing one family residence.
B01437087-S1
08/14/2026
Filed — Alteration CO
Plumbing alterations to existing one family residence.
B01437087-S2
08/14/2026
Filed — Alteration CO
Plumbing alterations to existing one family residence.
B01437087-I1
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/12/2026
Special inspection requirement — Permanent certificate
08/12/2026
Special inspection requirement — Maintenance information
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/12/2026
Special inspection requirement — Permanent certificate
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
08/12/2026
Special inspection requirement — Concrete - Cast-In-Place
08/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/12/2026
Special inspection requirement — Insulation placement and R values
08/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/12/2026
Special inspection requirement — Fenestration air leakage
08/12/2026
Special inspection requirement — Lighting in dwelling units
08/12/2026
Special inspection requirement — Fenestration areas
08/12/2026
Special inspection requirement — Maintenance information
07/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/27/2026
Special inspection requirement — Mechanical Systems
07/27/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 08/14/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-P36 36,000 BTU · Vrf Outdoor ×3
Ventilation
Panasonic WHISPERCHOICE DC 0.3-SONE 150-CFM 75 CFM · Exhaust Fan ×3
1 project · most recent 08/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/14/2026——Gas, Storm, Water/Sanitary
1 project · most recent 08/14/2026
Concrete Wood
FiledStatusContractorScope
08/14/2026——Concrete, Wood
1 project · most recent 08/14/2026
Fence
FiledStatusContractorScope
08/14/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/12/2026HVAC-R and service water heating equipment—energy_progress
08/12/2026Permanent certificate—energy_progress
08/12/2026Maintenance information—energy_progress
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026HVAC-R and service water heating system controls—energy_progress
08/12/2026Permanent certificate—energy_progress
08/12/2026Energy Code Compliance Inspections—progress
08/12/2026Concrete - Cast-In-Place—special
08/12/2026Excavations - Sheeting, Shoring, and Bracing—special
08/12/2026Insulation placement and R values—energy_progress
08/12/2026Fenestration and door U-factor and product ratings—energy_progress
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026Fenestration air leakage—energy_progress
08/12/2026Lighting in dwelling units—energy_progress
08/12/2026Fenestration areas—energy_progress
08/12/2026Maintenance information—energy_progress
07/28/2026Structural Stability – Alterations of existing buildings—special
07/27/2026Mechanical Systems—special
07/27/2026Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026B01437087-S2Request digital key ↗
08/16/2026B01437087-S1Request digital key ↗
08/16/2026B01437087-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01437087-S2Open ↗
08/16/2026B01437087-S1Open ↗
08/16/2026B01437087-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01437087-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/16/2026B01437087-I1Open ↗