← Back
Primarily 2 family with 1 store or office
106A NASSAU AVENUE
BROOKLYN · Greenpoint · BIN 3345095
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
2,520 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: ASSTA 106A LLC · 1,111 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar4p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASSTA 106A LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIB CONSULTING209/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARKANICS CORP4600209/15/2023
Building Lifecycle
All (26)Filed (2)Permit Issued (1)Signed Off (1)Violation (10)Inspection (3)Objection (2)Special Inspection (7)
10/03/2023
Signed off — Alteration
Propose to provide plumbing plans for Cellar floor only of existing Mixed use Building. No change in use egress or occupancy of building.
B00587396-I1
09/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Barkan
09/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
Malcolm Barkan
09/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Malcolm Barkan
09/22/2023
Special inspection requirement — Maintenance information
Malcolm Barkan
09/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Malcolm Barkan
09/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Malcolm Barkan
09/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Malcolm Barkan
09/15/2023
Filed — Alteration
Propose to provide plumbing plans for Cellar floor only of existing Mixed use Building. No change in use egress or occupancy of building.
B00587396-P1
09/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2022
Permit issued — Plumbing
B00587396-I1-PL
11/22/2022
Objection raised — Scope
11/22/2022
Objection resolved — Addressed
11/08/2022
Filed — Alteration
Propose to provide plumbing plans for Cellar floor only of existing Mixed use Building. No change in use egress or occupancy of building.
B00587396-I1
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC12/20/2022
1 project · most recent 06/29/2021
FiledStatusContractorScope
06/29/2021CompleteCITY WIDE ELECL CONTS INC4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/22/2023Fire-Resistant Penetrations and JointsMalcolm Barkanspecial
09/22/2023Tenant Protection Plan ComplianceMalcolm Barkanspecial
09/22/2023Energy Code Compliance InspectionsMalcolm Barkanprogress
09/22/2023Maintenance informationMalcolm Barkanenergy_progress
09/22/2023HVAC-R and service water heating equipmentMalcolm Barkanenergy_progress
09/22/2023HVAC-R and service water heating system controlsMalcolm Barkanenergy_progress
09/22/2023HVAC-R and service water piping design and insulationMalcolm Barkanenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B00587396-P1Request digital key ↗
08/15/2026B00587396-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B00587396-I1Open ↗
08/28/2026B00587396-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B00587396-I1Open ↗
08/29/2026B00587396-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00587396-I1Open ↗
08/29/2026B00587396-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B00587396-P1Open ↗
08/15/2026B00587396-I1Open ↗