← Back
Two family frame
107-05 104 STREET
QUEENS · South Ozone Park · BIN 4202872
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4-1Zoning
1,884 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,018 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR204/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495204/04/2025
Building Lifecycle
All (24)Filed (2)Permit Issued (2)Signed Off (2)Violation (7)Inspection (7)Special Inspection (4)
11/13/2025
Signed off — Alteration
Propose 3-piece bathroom at cellar floor. No change to use, bulk or egress.
Q01202244-I1
11/12/2025
Signed off — Alteration
Propose 3-piece bathroom at cellar floor. No change to use, bulk or egress.
Q01202244-S1
10/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/10/2025
Permit issued — General Construction
Q01202244-I1-GC
04/09/2025
Permit issued — Plumbing
Q01202244-S1-PL
04/04/2025
Filed — Alteration
Propose 3-piece bathroom at cellar floor. No change to use, bulk or egress.
Q01202244-I1
04/04/2025
Filed — Alteration
Propose 3-piece bathroom at cellar floor. No change to use, bulk or egress.
Q01202244-S1
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
08/21/2009
Violation issued (ECB, closed)
Zoning
08/21/2009
Violation issued (ECB, closed)
Construction
09/15/2006
Violation issued (ECB, closed)
Unknown
06/19/2006
Violation issued (ECB, closed)
Quality of Life
06/19/2006
Violation issued (ECB, closed)
Quality of Life
06/19/2006
Violation issued (ECB, closed)
Quality of Life
06/05/2006
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC04/10/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC04/09/2025
BISOTISSUEDN/A09/22/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/04/2025Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
04/04/2025Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
04/04/2025Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
04/04/2025Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01202244-I1Request digital key ↗
08/20/2026Q01202244-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01202244-I1Open ↗
08/13/2026Q01202244-S1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01202244-I1Open ↗
08/20/2026Q01202244-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01202244-S1Open ↗
09/01/2026Q01202244-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01202244-S1Open ↗
09/01/2026Q01202244-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01202244-I1Open ↗
08/20/2026Q01202244-S1Open ↗