← Back
Two family converted from one family
107-08 76 STREET
QUEENS · Ozone Park · BIN 4189757
💬 Discuss this project
1950Year Built
2.5Stories
B3Building Class
R4AZoning
2,484 sfGross Floor Area
2Units
Two family converted from one family · 4,020 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof13p · 1 filing · 20 docs
Floor 229p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar29p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2022$785K—Private party → Private party$316/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZELTA DESIGN804/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EPAC BUILDING CONSULTING INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL AMERICAN CONSTRUCTIONGeneral Contractor507/08/2026
VILLAGE P & H NY INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373404/16/2024
ZELTA INSPECT LLC7764304/16/2024
Building Lifecycle
All (59)Filed (8)Permit Issued (5)Signed Off (1)Inspection (5)Objection (10)Special Inspection (30)
12/06/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/01/2024
Permit issued — Plumbing
Q00839526-S1-PL
07/16/2024
Signed off — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-S3
06/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
04/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
04/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
04/22/2024
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-P4
04/16/2024
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-P3
04/10/2024
Special inspection requirement — Insulation placement and R values
ERIK LIEPINS
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
04/10/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
04/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
04/10/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
04/10/2024
Special inspection requirement — Final
ERIK LIEPINS
04/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ERIK LIEPINS
04/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
04/10/2024
Special inspection requirement — Ventilation and air distribution system
ERIK LIEPINS
04/10/2024
Special inspection requirement — Fenestration air leakage
ERIK LIEPINS
04/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
04/10/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
04/10/2024
Special inspection requirement — Fenestration areas
ERIK LIEPINS
04/10/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
04/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
04/10/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
04/10/2024
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
04/10/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
03/06/2024
Permit issued — Construction Fence
Q00839526-S3-FN
03/05/2024
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-S3
11/29/2023
Objection resolved — Addressed
11/15/2023
Objection raised — Other
11/06/2023
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-P2
11/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
11/02/2023
Special inspection requirement — Interior lighting power
ERIK LIEPINS
11/02/2023
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
11/02/2023
Special inspection requirement — Maintenance information
ERIK LIEPINS
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
11/02/2023
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
11/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
11/02/2023
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
11/02/2023
Special inspection requirement — Final
ERIK LIEPINS
07/28/2023
Permit issued — Plumbing
Q00839526-S1-PL
07/20/2023
Permit issued — Structural
Q00839526-S2-ST
07/19/2023
Permit issued — Mechanical Systems
Q00839526-I1-GC-CX
07/06/2023
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-S2
07/06/2023
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-P1
06/20/2023
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-S1
03/23/2023
Objection raised — Zoning
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Zoning
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Admin
03/23/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Zoning
03/23/2023
Objection resolved — Addressed
03/17/2023
Filed — Alteration CO
Propose 1-story & attic vertical enlargement on existing 1-story with cel house; convert exist 1 family into 2 family units with new partitions, and finishes; relocate entrance from right to left side of the building; install new deck at rear; obtain CO.
Q00839526-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC11/01/2024
DOB NOWConstruction FenceSigned-offALL AMERICAN CONSTRUCTION03/06/2024
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC07/28/2023
DOB NOWStructuralPermit IssuedALL AMERICAN CONSTRUCTION07/20/2023
DOB NOWMechanical SystemsPermit IssuedALL AMERICAN CONSTRUCTION07/19/2023
1 project · most recent 04/22/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2024Signed-offALL AMERICAN CONSTRUCTIONAir Conditioning Systems
Cooling
Lg ARUN038GSS4 3 tons · Vrf Outdoor ×2
ARUN060GSS4 5 tons · Vrf Outdoor ×2
LUU470HHV 46,000 BTU · Condensing Unit ×1
LUU480HHV 46,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/22/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2024Permit IssuedVILLAGE P & H NY INCGas, Water/Sanitary
1 project · most recent 04/29/2024
General Wiring
FiledStatusContractorScope
04/29/2024Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 project · most recent 04/22/2024
Wood
FiledStatusContractorScope
04/22/2024Permit IssuedVILLAGE P & H NY INCWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/06/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
04/24/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
04/24/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
04/24/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
04/10/2024Insulation placement and R valuesERIK LIEPINSenergy_progress
04/10/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
04/10/2024Mechanical SystemsERIK LIEPINSspecial
04/10/2024Structural Stability – Alterations of existing buildingsKY FUspecial
04/10/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
04/10/2024FinalERIK LIEPINSprogress
04/10/2024Fenestration and door U-factor and product ratingsERIK LIEPINSenergy_progress
04/10/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
04/10/2024Ventilation and air distribution systemERIK LIEPINSenergy_progress
04/10/2024Fenestration air leakageERIK LIEPINSenergy_progress
04/10/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
04/10/2024Shutoff dampersERIK LIEPINSenergy_progress
04/10/2024Fenestration areasERIK LIEPINSenergy_progress
04/10/2024Interior lighting powerERIK LIEPINSenergy_progress
04/10/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
04/10/2024Maintenance informationERIK LIEPINSenergy_progress
04/10/2024Air barrier - visual inspectionERIK LIEPINSenergy_progress
04/10/2024Lighting controlsERIK LIEPINSenergy_progress
11/02/2023HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
11/02/2023Interior lighting powerERIK LIEPINSenergy_progress
11/02/2023Air barrier - visual inspectionERIK LIEPINSenergy_progress
11/02/2023Maintenance informationERIK LIEPINSenergy_progress
Latest 25 of 42.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026Q00839526-S1Request digital key ↗
08/23/2026Q00839526-S2Request digital key ↗
08/23/2026Q00839526-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00839526-P2Open ↗
08/13/2026Q00839526-P1Open ↗
08/13/2026Q00839526-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00839526-I1Open ↗
08/13/2026Q00839526-P2Open ↗
08/13/2026Q00839526-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00839526-S2Open ↗
08/28/2026Q00839526-S1Open ↗
08/28/2026Q00839526-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00839526-S2Open ↗
08/23/2026Q00839526-S1Open ↗
08/23/2026Q00839526-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00839526-S2Open ↗
08/28/2026Q00839526-P2Open ↗
08/28/2026Q00839526-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00839526-I1Open ↗
08/13/2026Q00839526-P3Open ↗
08/13/2026Q00839526-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026Q00839526-S2Open ↗
08/23/2026Q00839526-S1Open ↗
08/23/2026Q00839526-P4Open ↗
Showing 3 of 8 on file for this type
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/13/2026Q00839526-P1Open ↗
08/13/2026Q00839526-P3Open ↗
08/13/2026Q00839526-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00839526-P3Open ↗
08/13/2026Q00839526-P1Open ↗
08/13/2026Q00839526-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00839526-P2Open ↗
08/13/2026Q00839526-I1Open ↗
08/13/2026Q00839526-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026Q00839526-P3Open ↗
08/23/2026Q00839526-P1Open ↗
08/15/2026Q00839526-P2Open ↗
Showing 3 of 4 on file for this type