← Back
One story retail building
107-08 JAMAICA AVENUE
QUEENS · Richmond Hill · BIN 4194632
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R6AZoning
2,146 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: LULOVE, LLC · 4,093 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof17p · 4 filings · 20 docs
Floor 113p · 6 filings · 20 docs
Cellar9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ETROG3207/08/2026
LULOVE1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JEON CONSULTING711/04/2022
MJ ENGINEERING & DESIGN103/24/2021
SOTIR ASSOCIATES102/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOTIR ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
718-HOME LLCGeneral Contractor707/08/2026
S.GOOLCHARAN CONSTRUCTIONGeneral Contractor303/21/2026
SMILE & SMILE GC INCGeneral Contractor303/21/2026
FIRST RESPONSE CLEANING CGeneral Contractor303/21/2026
JTJ STUDIO CORPGeneral Contractor107/08/2026
GARCIA, SALOMINOElectrical103/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
JUMPER PLBG & HTG CONT INElectrical103/21/2026
KRAATZ, OTTOElectrical103/21/2026
MECHANICAL RESPONSE INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JEON CONSULTING5119611/04/2022
ATLANTIC ENGINEERINGLABOR1381105/03/2022
AA BUILDING & INSPECTION1519111/02/2021
IP CONCRETE TESTING AND I6252111/02/2021
Building Lifecycle
All (69)Filed (9)Permit Issued (8)Signed Off (7)Violation (12)Inspection (6)Special Inspection (27)
06/21/2024
Signed off — Alteration
Q00473943-I1
02/07/2023
Signed off — Alteration
Q08016922-I1
12/20/2022
Permit issued — Mechanical Systems
Q08016922-I1-MS
11/04/2022
Filed — Alteration
Q08016922-I1
10/13/2022
Signed off — Alteration
Q00621882-I1
06/23/2022
Signed off — Alteration
Q00490455-I1
06/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/17/2022
Signed off — Alteration
REPLACE ROOF & REPAIR STRUCTURAL MEMBERS OF 1ST FL STORE IN FIRE DAMAGED BUILDING.
Q00526914-I1
06/17/2022
Signed off — Alteration
WORK TO INSTALL 2-GAS FURNACES, 1-W/C, 1-LAV, AND 3-ROOF DRAINS. THIS JOB IS RESTORING FIRE DAMAGED BUILDING IN CONJUNCTION WITH DOB# Q00526914.
Q00568082-I1
05/03/2022
Filed — Alteration
REPLACE ROOF & REPAIR STRUCTURAL MEMBERS OF 1ST FL STORE IN FIRE DAMAGED BUILDING.
Q00526914-P1
04/15/2022
Signed off — Alteration
TEMPORARY SHORING TO STABILIZE EXISTING FIRE DAMAGED BUILDING, AS PER PLANS.
Q00479737-I1
03/10/2022
Violation issued (FDNY_NOV, closed)
01/06/2022
Permit issued — Mechanical Systems
Q00621882-I1-GC-CX
11/02/2021
Filed — Alteration
Q00621882-I1
11/02/2021
Special inspection requirement — Metering
Younes Abouyaala
11/02/2021
Special inspection requirement — Lighting controls
Younes Abouyaala
11/02/2021
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
10/29/2021
Special inspection requirement — Fenestration areas
Younes Abouyaala
10/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/29/2021
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
10/29/2021
Special inspection requirement — Interior lighting power
Younes Abouyaala
10/29/2021
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
10/29/2021
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
10/29/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
10/29/2021
Special inspection requirement — Shutoff dampers
Younes Abouyaala
10/29/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/29/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
10/29/2021
Special inspection requirement — Masonry
Younes Abouyaala
10/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/29/2021
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
10/29/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
10/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/29/2021
Special inspection requirement — Final
NAVEEN KUMAR
10/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/15/2021
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
09/14/2021
Filed — Alteration
WORK TO INSTALL 2-GAS FURNACES, 1-W/C, 1-LAV, AND 3-ROOF DRAINS. THIS JOB IS RESTORING FIRE DAMAGED BUILDING IN CONJUNCTION WITH DOB# Q00526914.
Q00568082-P1
09/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
09/10/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2021
Permit issued — Plumbing
Q00568082-I1-PL
07/30/2021
Filed — Alteration
WORK TO INSTALL 2-GAS FURNACES, 1-W/C, 1-LAV, AND 3-ROOF DRAINS. THIS JOB IS RESTORING FIRE DAMAGED BUILDING IN CONJUNCTION WITH DOB# Q00526914.
Q00568082-I1
06/08/2021
Permit issued — Structural
Q00526914-I1-ST
05/26/2021
Filed — Alteration
REPLACE ROOF & REPAIR STRUCTURAL MEMBERS OF 1ST FL STORE IN FIRE DAMAGED BUILDING.
Q00526914-I1
05/06/2021
Permit issued — General Construction
Q00490455-I1-GC
04/26/2021
Permit issued — Structural
Q00479737-I1-ST
03/25/2021
Permit issued — Construction Fence
Q00473943-I1-FN
03/24/2021
Filed — Alteration
Q00490455-I1
03/24/2021
Filed — Alteration
TEMPORARY SHORING TO STABILIZE EXISTING FIRE DAMAGED BUILDING, AS PER PLANS.
Q00479737-I1
03/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
03/23/2021
Special inspection requirement — Masonry
BENJAMIN JEON
03/22/2021
Special inspection requirement — Energy Code Compliance Inspections
BENJAMIN JEON
03/16/2021
Permit issued — Construction Fence
Q00473943-I1-FN
03/03/2021
Special inspection requirement — Final
BENJAMIN JEON
03/03/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BENJAMIN JEON
02/24/2021
Filed — Alteration
Q00473943-I1
02/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSMILE & SMILE GC INC12/20/2022
DOB NOWMechanical SystemsSigned-offS.GOOLCHARAN CONSTRUCTION01/06/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/11/2021
DOB NOWStructuralSigned-off718-HOME LLC06/08/2021
DOB NOWGeneral ConstructionSigned-offJTJ STUDIO CORP05/06/2021
DOB NOWStructuralSigned-off718-HOME LLC04/26/2021
DOB NOWConstruction FenceSigned-off718-HOME LLC03/25/2021
DOB NOWConstruction FenceSigned-offFIRST RESPONSE CLEANING C03/16/2021
BISOTISSUED718 HOME IMPROVEMENT INC04/11/2016
BISPLISSUEDBT'S PLUMBING AND HEATING10/23/2015
BISOTISSUED718 HOME IMPROVEMENT INC10/23/2015
BISOTISSUEDMRMD NY CORP08/12/2013
BISPLISSUEDPLBG P & H INC04/24/2013
BISEQISSUEDMRMD NY CORP02/21/2013
BISMHISSUEDMRMD NY CORP02/21/2013
BISOTISSUEDMRMD NY CORP02/21/2013
BISPLISSUEDTHE PLUMBING & HTG SPECIA01/07/2013
BISMHISSUEDMRMD NY CORP01/02/2013
BISOTISSUEDMRMD NY CORP08/23/2012
BISEQISSUEDMRMD NY CORP08/23/2012
1 project · most recent 07/16/2021
General Wiring
FiledStatusContractorScope
07/16/2021CompleteINFINITI ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/15/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
11/02/2021MeteringYounes Abouyaalaenergy_progress
11/02/2021Lighting controlsYounes Abouyaalaenergy_progress
11/02/2021Air barrier - visual inspectionYounes Abouyaalaenergy_progress
10/29/2021Fenestration areasYounes Abouyaalaenergy_progress
10/29/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/29/2021Insulation placement and R valuesYounes Abouyaalaenergy_progress
10/29/2021Interior lighting powerYounes Abouyaalaenergy_progress
10/29/2021Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
10/29/2021Fenestration air leakageYounes Abouyaalaenergy_progress
10/29/2021Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
10/29/2021Shutoff dampersYounes Abouyaalaenergy_progress
10/29/2021Mechanical SystemsYounes Abouyaalaspecial
10/29/2021Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
10/29/2021MasonryYounes Abouyaalaspecial
10/29/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/29/2021Subgrade InspectionsYounes Abouyaalaspecial
10/29/2021Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
10/29/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/29/2021FinalNAVEEN KUMARprogress
10/29/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/15/2021Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
09/14/2021Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
03/24/2021Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
03/23/2021MasonryBENJAMIN JEONspecial
03/22/2021Energy Code Compliance InspectionsBENJAMIN JEONprogress
Latest 25 of 27.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/27/2026Q00473943-I1Request digital key ↗
08/27/2026Q00490455-I1Request digital key ↗
08/27/2026Q00479737-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00473943-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION11
04/21/2016421231866Open ↗
04/21/2016421231866Open ↗
10/26/2015421231866Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00621882-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026Q00621882-I1Open ↗
08/31/2026Q00621882-I1Open ↗
08/31/2026Q00621882-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/25/2026Q00568082-P1Open ↗
08/31/2026Q00621882-I1Open ↗
08/31/2026Q00621882-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00473943-I1Open ↗
08/27/2026Q00490455-I1Open ↗
08/27/2026Q00526914-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING3
06/18/2013420790594Open ↗
05/29/2013420790594Open ↗
12/04/2012420790594Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
10/16/2013420790594Open ↗
09/17/2013420790594Open ↗
07/10/2013420790594Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
▸BISEQUIPMENT USE PERMITS1
12/03/2013420790594Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/03/2013420790594Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/06/2017421558610Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00490455-I1Open ↗
08/27/2026Q00526914-I1Open ↗
08/27/2026Q00526914-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/26/2015421231866Open ↗
01/08/2013420790594Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/28/2012420560770Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/22/2013420560770Open ↗
10/30/2013420790594Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/28/2012420560770Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00621882-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00621882-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00621882-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00621882-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
12/04/2012420790594Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
12/03/2013420790594Open ↗
11/27/2013420560770Open ↗
▸BISSUPERSEDING LETTER1
10/19/2013420790594Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/27/2019421729605Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
06/27/2019421729605Open ↗
10/06/2017421558610Open ↗
10/26/2015421231866Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION1
10/06/2017421558610Open ↗
▸Other Documents3
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00621882-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00621882-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00621882-I1Open ↗