ECB09/25/2024RCA WAS ISSUED ON 07/26/2024 WITH CORRECTION DATE 09/24/2024 FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER- ROOF DRAIN NOT CONNECTED TO STORM SEWAGE/ COMBINED SEWAGE SYSTEM WHICH IS REQUIRED BY 1101$3K due
Two stories - detached, small or mid-size · 1,867 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.