Office with commercial, 1-6 stories
107-24 37 AVENUE
QUEENS · North Corona · BIN 4437230
💬 Discuss this project
1960Year Built
2Stories
O5Building Class
R6BZoning
25,000 sfGross Floor Area
2Units
22 Open Violations 7 unresolved · 15 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: BLANS DEVELOPMENT CORP. · 13,027 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof47p · 1 filing · 20 docs
Floor 269p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J K CONSTRUCTION NY407/08/2026
BLANS DEVELOPMENT2603/22/2026
BLANS DEVELOPEMNT CORP103/22/2026
OWNER OF 37-16 108 STREET203/22/2026
PLANS DEVELOPMENT403/21/2026
ENN JAY REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR103/21/2026
RICHARD MONTANA, ARCHITECT2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SENTINEL BUILDERS, LLCGeneral Contractor607/08/2026
ADVANCED PLBG LLCPlumbing307/08/2026
ADVANCED PLUMBING LLCFire Protection207/08/2026
J.K.CONSTRUCTION NEW YORKGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY CONTROL LABORATOR406708/22/2025
Building Lifecycle
All (157)Filed (12)Permit Issued (10)Violation (44)Inspection (13)Objection (48)Special Inspection (30)
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
04/07/2026
Permit issued — Structural
Q00875742-S3-ST
04/03/2026
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P6
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
03/05/2026
Permit issued — Plumbing
Q00875742-S5-PL
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Mechanical Systems
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Shutoff dampers
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Final
EDWIN DEGUZMAN
02/20/2026
Permit issued — Mechanical Systems
Q00875742-S2-MS
01/30/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
12/05/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Special inspection requirement — Sprinkler Systems
EDWIN DEGUZMAN
10/15/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Scope
09/05/2025
Objection raised — Scope
09/04/2025
Special inspection requirement — Insulation placement and R values
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMUEL BAUTISTA
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Interior lighting power
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Lighting controls
EDWIN DEGUZMAN
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P5
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P4
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P2
08/22/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Admin
08/05/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P3
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Mechanical Systems
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Lighting controls
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
07/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/05/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
01/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2025
Permit issued — Sprinklers
Q00875742-S4-EW-SP
01/22/2025
Permit issued — Plumbing
Q00875742-S5-PL
12/10/2024
Permit issued — General Construction
Q00875742-I1-GC
10/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSENTINEL BUILDERS, LLC04/07/2026
DOB NOWPlumbingSigned-offADVANCED PLBG LLC03/05/2026
DOB NOWMechanical SystemsPermit IssuedSENTINEL BUILDERS, LLC02/20/2026
DOB NOWSprinklersPermit IssuedADVANCED PLUMBING LLC01/22/2025
DOB NOWPlumbingSigned-offADVANCED PLBG LLC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedSENTINEL BUILDERS, LLC12/10/2024
DOB NOWSidewalk ShedPermit IssuedJ.K.CONSTRUCTION NEW YORK07/23/2024
DOB NOWPlumbingSigned-offADVANCED PLBG LLC01/16/2024
DOB NOWSprinklersPermit IssuedADVANCED PLUMBING LLC01/16/2024
DOB NOWGeneral ConstructionPermit IssuedSENTINEL BUILDERS, LLC11/28/2023
BISSPISSUEDAURA PLUMBING INC04/11/2013
BISOTISSUEDGALCON ENTERPRISES INC08/31/2011
BISPLISSUEDAURA PLUMBING INC10/29/2010
BISOTISSUEDATLAS CONSTRUCTION OF NY10/22/2010
BISPLISSUEDTHE PLUMBING COMPANY INC06/15/2010
BISPLISSUEDQUEENS MAINTENANCE CO INC03/06/2009
BISBLISSUEDQUEENS MAINTENANCE CO INC03/05/2009
BISPLISSUEDTHE PLUMBING COMPANY, INC03/04/2009
BIS—ISSUEDBLANS DEVELOPMENT CORP02/12/2009
BISPLISSUEDTHE PLUMBING COMPANY, INC01/28/2009
BISSPISSUEDTHE PLUMBING.COMPANY, INC01/28/2009
BISMHISSUEDAIR DOCS INC12/04/2008
BISPLISSUEDBENNIATI PLUMBING & HEATING08/08/2008
BISOTISSUEDHILLTOP CONSTRUCTION MGMT INC04/08/2008
BISOTISSUEDHILLTOP CONSTRUCTION MANAGEMENT04/08/2008
BISOTISSUEDHILLTOP CONSTRUCTION MGMT INC04/08/2008
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP CORP03/25/2008
BISOTISSUEDHILLTOP CONSTRUCTION MGMT INC11/15/2007
BISOTISSUEDHILLTOP CONSTRUCTION MGMT INC11/15/2007
BISSPISSUEDTHE PLUMBING COMPANY IN10/30/2007
BISPLISSUEDTHE PLUMBBING COMPANY INC10/30/2007
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP CORP09/10/2007
BIS—ISSUEDBLANS DEVELOPMENT CORP.09/04/2007
BISOTISSUEDHILLTOP CONSTRUCTION MANAGEMENT07/26/2007
BISOTISSUEDBLANS DEV CORP12/06/2006
BISBLISSUEDSEICKEL & SONS PLMB.INC.04/14/1995
BISPLISSUEDSEICKEL & SONS PLMB.INC.04/14/1995
1 project · most recent 04/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedSENTINEL BUILDERS, LLCHeating and Air Conditioning Systems
Heat / Cool
Carrier 48GDCK05 4 tons · Rooftop Unit ×12
1 project · most recent 04/03/2026
Sprinkler System
FiledStatusContractorScope
04/03/2026Permit IssuedADVANCED PLUMBING LLCSprinkler System
1 project · most recent 04/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/03/2026Signed-offADVANCED PLBG LLCGas, Water/Sanitary
2 projects · most recent 02/26/2025
General Wiring
FiledStatusContractorScope
02/26/2025Permit IssuedA.S.K. ELECTRICAL CORPGeneral Wiring
07/29/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 04/03/2026
Steel
FiledStatusContractorScope
04/03/2026Permit IssuedSENTINEL BUILDERS, LLCSteel
1 project · most recent 07/23/2024
Sidewalk Shed
FiledStatusContractorScope
07/23/2024Permit IssuedJ.K.CONSTRUCTION NEW YORKSidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/05/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/05/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
01/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/12/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
05/12/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
05/12/2026Maintenance informationEDWIN DEGUZMANenergy_progress
05/12/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
03/31/2026Maintenance informationEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
03/02/2026Maintenance informationEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
03/02/2026Mechanical SystemsEDWIN DEGUZMANspecial
03/02/2026Shutoff dampersEDWIN DEGUZMANenergy_progress
03/02/2026FinalEDWIN DEGUZMANprogress
11/10/2025Sprinkler SystemsEDWIN DEGUZMANspecial
09/04/2025Insulation placement and R valuesEDWIN DEGUZMANenergy_progress
09/04/2025Sprayed fire-resistant materialsSAMUEL BAUTISTAspecial
09/04/2025Fire-Resistant Penetrations and JointsSAMUEL BAUTISTAspecial
09/04/2025Energy Code Compliance InspectionsEDWIN DEGUZMANprogress
09/04/2025FinalEDWIN DEGUZMANprogress
09/04/2025Interior lighting powerEDWIN DEGUZMANenergy_progress
09/04/2025Lighting controlsEDWIN DEGUZMANenergy_progress
07/18/2025HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
07/18/2025FinalEDWIN DEGUZMANprogress
Latest 25 of 47.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026Q00900728-I1Request digital key ↗
08/21/2026Q01083374-I1Request digital key ↗
08/17/2026Q00875742-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
10/04/2021401008636Open ↗
06/17/2021401008636Open ↗
09/27/2019401008636Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
04/17/2013420252069Open ↗
09/01/2011420476470Open ↗
10/29/2010420252069Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/19/2013420252069Open ↗
05/26/2011420250579Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
10/19/2010420252069Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026Q00875742-S2Open ↗
09/01/2026Q00875742-I1Open ↗
09/01/2026Q00875742-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026Q00900728-I1Open ↗
08/17/2026Q00875742-I1Open ↗
08/17/2026Q00875742-P6Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/16/2016421358284Open ↗
05/29/2013420252069Open ↗
05/07/2013420252069Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00875742-S2Open ↗
09/01/2026Q00875742-I1Open ↗
09/01/2026Q00875742-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE7
08/26/2013420252069Open ↗
06/20/2011420252069Open ↗
05/23/2011420252069Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
08/26/2013420252069Open ↗
06/20/2011420252069Open ↗
05/23/2011420252069Open ↗
▸BISSCHEDULE B - PLUMBING2
03/23/2011420252069Open ↗
10/19/2010420252069Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/19/2019421885776Open ↗
08/16/2016421358284Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
10/19/2010420252069Open ↗
10/19/2010420250579Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00900728-I1Open ↗
08/17/2026Q00875742-I1Open ↗
08/17/2026Q00875742-S5Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
11/28/2008410197451Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/19/2019421885776Open ↗
04/19/2019421885776Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
08/30/2011420476470Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/18/2022401008636Open ↗
08/06/2021401008636Open ↗
03/04/2021401008636Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/19/2013420252069Open ↗
06/10/2011420250579Open ↗
11/06/2009410197451Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
10/04/2021401008636Open ↗
09/27/2019401008636Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00900728-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
08/16/2016421358284Open ↗
06/19/2013420252069Open ↗
08/30/2011420476470Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
04/19/2019421885776Open ↗
04/19/2019421885776Open ↗
08/16/2016421358284Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION1
01/18/2022401008636Open ↗