← Back
Two family converted from one family
107-28 113 STREET
QUEENS · South Ozone Park · BIN 4203395
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R4AZoning
1,328 sfGross Floor Area
2Units
5 Open Violations 2 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,400 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic4p · 1 filing · 18 docs
Floor 211p · 1 filing · 18 docs
Floor 110p · 1 filing · 18 docs
Cellar12p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE GENERAL CONTRACTOR403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RICHARD JIMENEZ ARCHITECTURE312/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969108/22/2023
Building Lifecycle
All (44)Filed (3)Permit Issued (2)Violation (18)Inspection (5)Special Inspection (16)
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
RAYMOND CALAMARI
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
RAYMOND CALAMARI
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RAYMOND CALAMARI
12/16/2024
Special inspection requirement — Maintenance information
RAYMOND CALAMARI
12/12/2024
Filed — Alteration
General restoration of a fire damaged 2 family detached dwelling, including minor structural work. Plumbing work to be filed subsequently. No change to use, egress or occupancy.
Q00920169-P1
07/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/31/2024
Permit issued — Plumbing
Q00920169-S2-PL
05/28/2024
Filed — Alteration
General restoration of a fire damaged 2 family detached dwelling, including minor structural work. Plumbing work to be filed subsequently. No change to use, egress or occupancy.
Q00920169-S2
11/03/2023
Violation issued (ECB, closed)
Construction
11/03/2023
Violation issued (ECB, closed)
Construction
11/03/2023
Violation issued (ECB, closed)
Construction
11/02/2023
Violation issued (ECB, closed)
Construction
09/22/2023
Permit issued — General Construction
Q00920169-I1-GC-CX
08/22/2023
Filed — Alteration
General restoration of a fire damaged 2 family detached dwelling, including minor structural work. Plumbing work to be filed subsequently. No change to use, egress or occupancy.
Q00920169-I1
08/21/2023
Special inspection requirement — Maintenance information
Jose Pena
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Pena
08/18/2023
Special inspection requirement — Fenestration air leakage
Jose Pena
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
08/18/2023
Special inspection requirement — Interior lighting power
Jose Pena
08/18/2023
Special inspection requirement — Air barrier - visual inspection
Jose Pena
08/18/2023
Special inspection requirement — Insulation placement and R values
Jose Pena
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Pena
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jose Pena
08/18/2023
Special inspection requirement — Structural Wood Frame
Jose Pena
08/18/2023
Special inspection requirement — Fenestration areas
Jose Pena
08/16/2023
Special inspection requirement — Final
Jose Pena
05/21/2018
Violation issued (HPD, open)
B
10/02/2015
Violation issued (ECB, closed)
Construction
10/02/2015
Violation issued (ECB, closed)
Construction
05/13/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2015
Violation issued (ECB, closed)
Construction
04/03/2015
Violation issued (ECB, open)
Construction
02/15/2015
Violation issued (ECB, open)
Construction
02/15/2015
Violation issued (ECB, open)
Construction
02/15/2015
Violation issued (ECB, closed)
Construction
01/13/2015
Violation issued (ECB, closed)
Construction
01/10/2015
Violation issued (ECB, closed)
Construction
11/15/1998
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/31/2024
DOB NOWGeneral ConstructionPermit IssuedPR09/22/2023
BISPLISSUEDSAMCO MECHANICAL CORP.12/10/1998
BISOTISSUEDNA12/10/1998
2 projects · most recent 12/12/2023
General Wiring
FiledStatusContractorScope
12/12/2023Permit IssuedKENNETH ELECTRIC INCGeneral Wiring
08/28/2023CancelledPOWER ON ELECTRIC CORP—
1 project · most recent 12/12/2024
Wood
FiledStatusContractorScope
12/12/2024Signed-offINFINITI ESC PLUMBING CORWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/16/2024HVAC-R and service water heating equipmentRAYMOND CALAMARIenergy_progress
12/16/2024HVAC-R and service water heating system controlsRAYMOND CALAMARIenergy_progress
12/16/2024HVAC-R and service water piping design and insulationRAYMOND CALAMARIenergy_progress
12/16/2024Maintenance informationRAYMOND CALAMARIenergy_progress
08/21/2023Maintenance informationJose Penaenergy_progress
08/18/2023Fenestration and door U-factor and product ratingsJose Penaenergy_progress
08/18/2023Fenestration air leakageJose Penaenergy_progress
08/18/2023Fire-Resistant Penetrations and JointsJose Penaspecial
08/18/2023Interior lighting powerJose Penaenergy_progress
08/18/2023Air barrier - visual inspectionJose Penaenergy_progress
08/18/2023Insulation placement and R valuesJose Penaenergy_progress
08/18/2023Structural Stability – Alterations of existing buildingsJose Penaspecial
08/18/2023Fire-Resistance Rated ConstructionJose Penaprogress
08/18/2023Structural Wood FrameJose Penaprogress
08/18/2023Fenestration areasJose Penaenergy_progress
08/16/2023FinalJose Penaprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q00920169-I1Request digital key ↗
08/21/2026Q00920169-P1Request digital key ↗
08/21/2026Q00920169-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00920169-S2Open ↗
08/13/2026Q00920169-P1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00920169-S2Open ↗
08/29/2026Q00920169-S2Open ↗
08/29/2026Q00920169-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q00920169-I1Open ↗
08/21/2026Q00920169-P1Open ↗
08/21/2026Q00920169-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q00920169-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q00920169-I1Open ↗
08/21/2026Q00920169-P1Open ↗
08/21/2026Q00920169-S2Open ↗