← Back
Primarily 2 family with 1 store or office
107-28 VAN WYCK EXPRESSWAY
QUEENS · South Ozone Park · BIN 4206254
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R3-2Zoning
2,400 sfGross Floor Area
3Units
4 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,120 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof10p · 6 filings · 20 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AT&T903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GT WIRELESS ENGINEERING, PLLC705/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES703/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEXT SOLUTIONS C.S. INCGeneral Contractor407/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor403/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
INTERCITY PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AIROSMITH8651205/23/2024
R MARSAC CONSULTING LLC329805/23/2024
CNS INSPECTION SERVICES7566107/05/2023
Building Lifecycle
All (70)Filed (7)Permit Issued (6)Signed Off (3)Violation (18)Inspection (3)Objection (26)Special Inspection (7)
03/10/2026
Signed off — Alteration
Installation of steel platform on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Q00871493-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Marsac
06/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH JOHNSTON
05/23/2024
Filed — Alteration
Installation of new gas piping from garage to OSP to roof. Related generator filed under separate application #Q00866242. No change in use, egress, or occupancy.
Q00868270-P1
03/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Marsac
03/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH JOHNSTON
02/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Permit issued — Plumbing
Q00868270-I1-PL
09/26/2023
Permit issued — Antenna
Q00871493-I1-AN
09/22/2023
Permit issued — General Construction
Q00866242-I1-GC-CX
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
07/13/2023
Objection raised — Fire_Protection
07/13/2023
Objection raised — Scope
07/13/2023
Objection raised — Structural
07/10/2023
Objection raised — Fire_Protection
07/10/2023
Objection raised — Zoning
07/06/2023
Filed — Alteration
Installation of new gas piping from garage to OSP to roof. Related generator filed under separate application #Q00866242. No change in use, egress, or occupancy.
Q00868270-I1
07/05/2023
Filed — Alteration
Installation of steel platform on ROOF. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Q00871493-I1
07/05/2023
Filed — Alteration
Installation of (1) non-emergency natural gas generator and steel frame on ROOF. No change to use, egress or occupancy. All in compliance with TPPN 5/98.
Q00866242-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Marsac
04/27/2023
Special inspection requirement — Final
John Nucatola
04/27/2023
Special inspection requirement — Mechanical Systems
John Nucatola
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2023
Signed off — Alteration
Modification of existing AT&T telecommunications site. Install (2) new antennas. Retrofit (1) existing equipment rack. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Q00607380-I1
07/26/2022
Violation issued (FDNY_NOV, closed)
06/01/2022
Permit issued — Antenna
Q00607380-I1-AN
05/20/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection resolved — Addressed
01/26/2022
Objection raised — 1998-AN AC 28-103.14.1-Adminis
01/26/2022
Objection raised — Other
01/26/2022
Objection raised — 1998-AN AC 28-103.14.1-TPPN-98
01/26/2022
Objection raised — 1998-AN AC 28-103.14.1-Adminis
01/26/2022
Objection raised — 2014-AN AC 28-104.7.1-Administ
01/24/2022
Filed — Alteration
Modification of existing AT&T telecommunications site. Install (2) new antennas. Retrofit (1) existing equipment rack. No change to use, egress, or occupancy. All in compliance with TPPN 5/98.
Q00607380-I1
03/25/2021
Signed off — Alteration
Modification of existing AT&T site. Replace 4 antennas and install 2 new RRH units on roof. Retrofit 1 existing equipment cabinet in cellar. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
Q00325022-I1
08/28/2020
Permit issued — Antenna
Q00325022-I1-AN
06/24/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
06/24/2020
Objection resolved — Addressed
06/24/2020
Objection raised — 1998-AN BC 501.3-Building Code
06/24/2020
Objection resolved — Addressed
06/24/2020
Objection raised — 2014-AN AC 28-104.7-Building C
06/24/2020
Objection resolved — Addressed
06/23/2020
Filed — Alteration
Modification of existing AT&T site. Replace 4 antennas and install 2 new RRH units on roof. Retrofit 1 existing equipment cabinet in cellar. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
Q00325022-I1
08/30/2018
Permit issued — Antenna
Q00071503-I1-AN
08/28/2018
Filed — Alteration
AT&T / Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal, retrofit and installation of cabinets in existing equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00071503-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINTERCITY PLBG & HTG CORP10/20/2023
DOB NOWAntennaSigned-offNEXT SOLUTIONS C.S. INC09/26/2023
DOB NOWGeneral ConstructionPermit IssuedNEXT SOLUTIONS C.S. INC09/22/2023
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP06/01/2022
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP08/28/2020
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR08/30/2018
BISOTISSUEDRAMAPO COMMUNICATION CORP10/20/2017
BISOTISSUEDBECHTEL INFRASTRUCTURE AN10/06/2014
BISOTISSUEDBECHTEL INFRASTRUCTURE AN03/06/2014
BISOTISSUEDQUANTA WIRELESS SOLUTIONS09/13/2011
BISOTISSUEDQUANTA WIRELESS SOLUTIONS07/07/2011
BISOTISSUEDBCI COMMUNICATIONS INC09/08/2010
BISOTISSUEDPCS CONTRACTING INC02/20/2008
BISOTISSUEDPIECE MANAGEMENT INC04/30/2001
1 project · most recent 05/23/2024
Gas
FiledStatusContractorScope
05/23/2024Signed-offINTERCITY PLBG & HTG CORPGas
1 project · most recent 12/06/2023
General Wiring
FiledStatusContractorScope
12/06/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/04/2024Fire-Resistant Penetrations and JointsRobert Marsacspecial
06/04/2024Tenant Protection Plan ComplianceJOSEPH JOHNSTONspecial
03/21/2024Fire-Resistant Penetrations and JointsRobert Marsacspecial
03/21/2024Tenant Protection Plan ComplianceJOSEPH JOHNSTONspecial
05/02/2023Tenant Protection Plan ComplianceRobert Marsacspecial
04/27/2023FinalJohn Nucatolaprogress
04/27/2023Mechanical SystemsJohn Nucatolaspecial
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/28/2026Q00071503-I1Request digital key ↗
08/24/2026Q00866242-I1Request digital key ↗
08/24/2026Q00871493-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026Q00325022-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
12/14/2016421410280Open ↗
10/10/2014421009027Open ↗
08/06/2014421009027Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
10/26/2017421410280Open ↗
10/10/2014421009027Open ↗
03/12/2014420369764Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
03/15/2019421410280Open ↗
10/26/2017421410280Open ↗
02/13/2017421410280Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00866242-I1Open ↗
08/22/2026Q00868270-I1Open ↗
08/22/2026Q00868270-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00866242-I1Open ↗
09/01/2026Q00866242-I1Open ↗
09/01/2026Q00868270-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00866242-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
10/10/2014421009027Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
12/14/2016421410280Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00325022-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00866242-I1Open ↗
08/22/2026Q00868270-P1Open ↗
08/22/2026Q00868270-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/14/2016421410280Open ↗
08/06/2014421009027Open ↗
10/15/2013420904221Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/22/2011420369764Open ↗
08/27/2010420239030Open ↗
02/13/2008410064950Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/15/2019421410280Open ↗
10/26/2017421410280Open ↗
08/06/2014421009027Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/15/2019421410280Open ↗
06/08/2015421009027Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/14/2017421410280Open ↗
06/08/2015420369764Open ↗
06/08/2015421009027Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/06/2014421009027Open ↗
10/15/2013420904221Open ↗
06/20/2011420369764Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/15/2019421410280Open ↗
06/08/2015420369764Open ↗
06/08/2015421009027Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
03/15/2019421410280Open ↗
12/14/2016421410280Open ↗
06/08/2015420369764Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
12/14/2016421410280Open ↗
08/06/2014421009027Open ↗
10/15/2013420904221Open ↗
▸BISADDITIONAL INFORMATION1
02/13/2017421410280Open ↗