Two family frame
107-34 164 PLACE
QUEENS · BIN 4216483
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4-1Zoning
2,998 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,004 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivil
Floor 221p · 2 filings · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD CONSTRUCTION2807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2023$1.3M—— → —$434/sf building
07/23/2021$520K—Private party → ISK DEVELOP CORP— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/08/2026
ARCHITECTURAL CONCEPT512/19/2022
GRACE ENGINEERING PLLC.112/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
ARCHITECTUAL CONCEPT1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor1407/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/08/2026
ARCHITECTURAL CONCEPT3642412/19/2022
Building Lifecycle
All (73)Filed (6)Permit Issued (8)Signed Off (3)Violation (1)Inspection (13)Objection (12)Special Inspection (30)
06/30/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343792-I1
01/14/2026
Permit issued — Solar
Q01343792-I1-SL
01/08/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343792-I1
08/05/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/22/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/17/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/05/2023
Permit issued — Curb Cut
Q08054242-I1-CC
08/23/2023
Signed off — Alteration
Application filing to install temporary construction fence.
Q00586844-I1
03/01/2023
Signed off — Alteration
Application filing to install new plumbing fixtures.
Q00586843-I1
02/02/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/21/2022
Special inspection requirement — Metering
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
12/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
12/19/2022
Filed — Alteration
Application filing to install new plumbing fixtures.
Q00586843-P1
12/19/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — Metering
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
12/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
12/15/2022
Filed — Alteration
INSTALLATION OF CURBCUT AS PER DRAWING.
Q08054242-I1
12/05/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
11/14/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2022
Permit issued — General Construction
Q00586832-I1-GC-CX
07/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/12/2022
Permit issued — Plumbing
Q00586843-I1-PL
05/12/2022
Permit issued — Earth Work
Q00586832-I1-GC-CX
05/12/2022
Permit issued — Construction Fence
Q00586844-I1-FN
03/23/2022
Permit issued — Foundation
Q00586832-I1-GC-CX
12/23/2021
Special inspection requirement — Metering
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
12/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
12/17/2021
Permit issued — Construction Fence
Q00586844-I1-FN
12/08/2021
Objection raised — Structural
12/08/2021
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/14/2026
DOB NOWCurb CutPermit IssuedMORELL BUILDERS INC10/05/2023
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC08/11/2022
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/12/2022
DOB NOWEarth WorkPermit IssuedMORELL BUILDERS INC05/12/2022
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC05/12/2022
DOB NOWFoundationPermit IssuedMORELL BUILDERS INC03/23/2022
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC12/17/2021
BISOTISSUEDSUNRUN INSTALLATION SVC04/07/2023
1 project · most recent 09/02/2021
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2021Permit IssuedMORELL BUILDERS INCAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
A.O. Smith GCV 40 40,000 BTU · Water Heater ×6
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×15
SP-B90 100 CFM · Kitchen Exhaust ×6
Ducts & Piping
Williamson GWA 70 70,000 BTU · Boiler ×6
4 projects · most recent 01/08/2026
General Wiring
FiledStatusContractorScope
01/08/2026CompleteSUNRUN SOLAR ELECTL CORP—
04/10/2023CancelledSUNRUN SOLAR ELECTL CORP—
02/03/2023CompleteSUPREME ELECTRIC CORPGeneral Wiring
06/01/2022CancelledSUPREME ELECTRIC CORPGeneral Wiring
1 project · most recent 09/02/2021
Wood
FiledStatusContractorScope
09/02/2021Permit IssuedMORELL BUILDERS INCWood
1 project · most recent 01/08/2026
FiledStatusContractorScope
01/08/2026Signed-offSUNRUN INSTALLATION SVC82 panels, 33.62 kw, 861.94 roof_area_sqft
1 project · most recent 09/02/2021
Earthwork
FiledStatusContractorScope
09/02/2021Permit IssuedMORELL BUILDERS INCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/05/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/17/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
02/02/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/05/2022Pass-Final Fence Non-Directive 14PassView ↗
11/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
12/21/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/21/2022HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
12/21/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
12/21/2022HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
12/21/2022MeteringMUZAFFAR JAMALenergy_progress
12/21/2022Maintenance informationMUZAFFAR JAMALenergy_progress
12/21/2022Permanent certificateMUZAFFAR JAMALenergy_progress
12/21/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
12/19/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/19/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
12/19/2022HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
12/19/2022HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
12/19/2022Permanent certificateMUZAFFAR JAMALenergy_progress
12/19/2022MeteringMUZAFFAR JAMALenergy_progress
12/19/2022Maintenance informationMUZAFFAR JAMALenergy_progress
12/19/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
12/23/2021Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
12/23/2021Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
12/23/2021Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
12/23/2021Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/23/2021Heating SystemsMUZAFFAR JAMALspecial
12/23/2021MasonryMUZAFFAR JAMALspecial
12/23/2021Mechanical Systems—special
12/23/2021Smoke Control Systems TestingMUZAFFAR JAMALspecial
12/23/2021Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
Latest 25 of 72.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026Q00586832-P1Request digital key ↗
08/29/2026Q00586832-P3Request digital key ↗
08/27/2026Q00586844-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
05/03/2024440777330Open ↗
03/01/2024440777330Open ↗
02/05/2024440777330Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
07/11/2023440746935Open ↗
09/22/2022440746935Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1132
05/03/2024440777330Open ↗
02/05/2024440777330Open ↗
▸BISWORK PERMIT APPLICATION1
04/07/2023440777330Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00586832-P1Open ↗
08/13/2026Q00586832-I1Open ↗
08/13/2026Q00586832-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00586832-I1Open ↗
▸Seals & Professional Certifications85
▸DOB NOWProgress Inspector Seal & Signature52
09/25/2026Q00586832-P3Open ↗
09/25/2026Q00586832-P3Open ↗
09/25/2026Q00586832-P3Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026Q00586832-P3Open ↗
09/25/2026Q00586832-P3Open ↗
09/25/2026Q00586832-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00586844-I1Open ↗
08/27/2026Q00586843-I1Open ↗
08/27/2026Q00586843-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/05/2023440777330Open ↗
09/22/2022440746935Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/05/2023440777330Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2022440746935Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/05/2023440777330Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00586832-I1Open ↗
08/13/2026Q00586832-P1Open ↗
08/13/2026Q00586832-P3Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
04/11/2023440746935Open ↗
10/26/2022440746935Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/07/2023440777330Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00586843-I1Open ↗
08/27/2026Q00586843-P1Open ↗
08/13/2026Q00586832-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00586832-I1Open ↗
08/13/2026Q00586843-I1Open ↗
▸BISNYCECC ANALYSIS1
04/05/2023440777330Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/05/2023440777330Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/05/2023440777330Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/05/2023440777330Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/05/2023440777330Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/25/2023440746935Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/05/2023440777330Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01343792-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/05/2023440777330Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
04/05/2023440777330Open ↗
09/22/2022440746935Open ↗
▸BISADDITIONAL INFORMATION2
07/25/2023440746935Open ↗
04/11/2023440746935Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION3
09/22/2022440746935Open ↗
09/22/2022440746935Open ↗
09/22/2022440746935Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026Q00586832-I1Open ↗
08/13/2026Q00586832-P3Open ↗
08/13/2026Q00586832-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00586832-P3Open ↗
08/13/2026Q00586832-I1Open ↗
08/13/2026Q00586832-P1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00586832-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00586832-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00586832-I1Open ↗