← Back
One family attached or semi-detached
107-35 121 STREET
QUEENS · South Ozone Park · BIN 4205639
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R4BZoning
1,305 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/10/2021$611K—Private party → Private party$468/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP511/02/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275311/02/2023
Building Lifecycle
All (28)Filed (5)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (14)
11/03/2023
Signed off — Alteration
INTERIOR RENOVATION TO REPAIR MINOR FIRE DAMAGE AT CELLAR, FIRST AND SECOND FLOORS; CHANGE VINYL SIDING. REPLACE WINDOWS, RELOCATE KITCHEN ON FIRST FLOOR AND HWH IN CELLAR.
Q00887412-I1
11/02/2023
Filed — Alteration
INTERIOR RENOVATION TO REPAIR MINOR FIRE DAMAGE AT CELLAR, FIRST AND SECOND FLOORS; CHANGE VINYL SIDING. REPLACE WINDOWS, RELOCATE KITCHEN ON FIRST FLOOR AND HWH IN CELLAR.
Q00887412-P2
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Final
HARI SONI
11/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Final
HARI SONI
11/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
11/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
10/30/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH GC # Q00887412. INSTALLATION OF TWO NEW BATHROOMS AND LAUNDRY SINK, WASHER AND DRYER.
Q00887494-I1
10/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2023
Permit issued — Plumbing
Q00887494-I1-PL
07/05/2023
Permit issued — General Construction
Q00887412-I1-GC
06/21/2023
Filed — Alteration
INTERIOR RENOVATION TO REPAIR MINOR FIRE DAMAGE AT CELLAR, FIRST AND SECOND FLOORS; CHANGE VINYL SIDING. REPLACE WINDOWS, RELOCATE KITCHEN ON FIRST FLOOR AND HWH IN CELLAR.
Q00887412-P1
06/21/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GC # Q00887412. INSTALLATION OF TWO NEW BATHROOMS AND LAUNDRY SINK, WASHER AND DRYER.
Q00887494-P1
06/08/2023
Filed — Alteration
INTERIOR RENOVATION TO REPAIR MINOR FIRE DAMAGE AT CELLAR, FIRST AND SECOND FLOORS; CHANGE VINYL SIDING. REPLACE WINDOWS, RELOCATE KITCHEN ON FIRST FLOOR AND HWH IN CELLAR.
Q00887412-I1
06/08/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GC # Q00887412. INSTALLATION OF TWO NEW BATHROOMS AND LAUNDRY SINK, WASHER AND DRYER.
Q00887494-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/18/2023
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC07/05/2023
BISOTISSUEDSUNPOWER CORPORATION, SYS07/19/2022
1 project · most recent 07/20/2022
FiledStatusContractorScope
07/20/2022CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/02/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
11/02/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
11/02/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
11/02/2023FinalHARI SONIprogress
11/02/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
11/02/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
11/02/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
11/02/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
11/02/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
11/02/2023FinalHARI SONIprogress
11/02/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
11/02/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
11/02/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
11/02/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00887494-I1Request digital key ↗
08/24/2026Q00887494-P1Request digital key ↗
08/23/2026Q00887412-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/18/2022440734920Open ↗
▸BISWORK PERMIT APPLICATION1
07/19/2022440734920Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/24/2026Q00887494-I1Open ↗
08/13/2026Q00887412-P1Open ↗
08/13/2026Q00887494-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00887412-P2Open ↗
08/29/2026Q00887412-P2Open ↗
08/29/2026Q00887412-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00887494-I1Open ↗
08/13/2026Q00887412-P1Open ↗
08/13/2026Q00887494-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00887412-P2Open ↗
08/23/2026Q00887412-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/18/2022440734920Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/18/2022440734920Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/18/2022440734920Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/19/2022440734920Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00887494-I1Open ↗
08/13/2026Q00887412-P2Open ↗
08/13/2026Q00887494-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/18/2022440734920Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/21/2022440734920Open ↗
07/18/2022440734920Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/18/2022440734920Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/19/2022440734920Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/18/2022440734920Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
10/28/2022440734920Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/21/2022440734920Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/19/2022440734920Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/21/2022440734920Open ↗
07/18/2022440734920Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/19/2022440734920Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/19/2022440734920Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/19/2022440734920Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/01/2022440734920Open ↗
▸BISFINAL1
07/19/2022440734920Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/18/2022440734920Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/21/2022440734920Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/18/2022440734920Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
11/01/2022440734920Open ↗