ECB01/29/2008FAILURE TO MAINTAIN EXTERIOR ROOF LEADERS HANGING OPEN. REMEDY: MAINTAIN ROOF LEADER & CONNECT TO SUBGRADE AS PER CODE.Nothing owed — awaiting certificate of correction
ECB09/05/2007WORK W/O PERMIT. WORK NOTED: AT THE FRONT OF THE PREMISES A CONCRETE DECK OF 7'D X 11'W X 2'-9" HIGH HAS BEEN ERECTED W/(BALUSTERED) RAILINGALONG THE PERIMETER THE DECK IS SURFACED BY CINDER BLOCKS AT THENothing owed — awaiting certificate of correction
Two family converted from one family · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.