ECB12/22/2025WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, THE STEEL FRAME AWNING IS SUPPORTED BY 6 STEEL COLUMNS ABOVE THE WOODEN DECK ARE INSTALLED AT EXPOSURE 3 ATTACHED TO THE MAIN BUILDING. MEASUREMENT APPROX$1K due
DOB06/03/2000VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB09/25/1996V-DOB VIOLATION - ACTIVE
DOB09/25/1996VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB11/16/2004ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. PREMISES ALTERED UNDER ALT 1 #401223056. REMEDY: OBTAIN VALID C OF O.Nothing owed — awaiting certificate of correction
ECB11/16/2004WORK WITHOUT A PERMIT. WORK NOTED: CELLAR INSTALLED AN ADDITIONAL 25'-0" LINEAR FEET OF INTERIOR SHEETROCK PARTITIONS CREATING 2 ADDITIONAL ROOMS. 1ST FLOOR FRONT-INSTALLED A FRONT DOOR AWNING-ATTACHED TO HOUSENothing owed — awaiting certificate of correction
ECB07/30/2000RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NO. OF FAMILIES. B'LDG DEPT RECORDS. INDICATE RESIDENCE IS LEGALLY APPROVED FOR OCCUPANCY BY 1 FAMILY. RESIDECE NOW ALTERED FOR ONothing owed — awaiting certificate of correction
Miscellaneous one family · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.