← Back
BuildNYC
Over six families without stores
107 GREENPOINT AVENUE
BROOKLYN · Greenpoint · BIN 3064729
💬 Discuss this project
1885Year Built
4Stories
C1Building Class
R6AZoning
13,000 sfGross Floor Area
20Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: 105-115 Greenpoint Owner · 4,750 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop passive recreation use1p · 1 filing · 3 docs
Floor 4Structural work, cellar and first floor15p · 1 filing · 20 docs
Floor 3Structural work, cellar and first floor13p · 1 filing · 20 docs
Floor 2Structural work, cellar and first floor17p · 1 filing · 20 docs
Floor 1Structural work, cellar and first floor13p · 1 filing · 20 docs
CellarStructural work, cellar and first floor16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
105-115 Greenpoint Owner3407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gregg Rothstein Architect310/27/2021
Tang Studio Architect108/02/2021
Consulting Engineers Collaborative109/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tang Studio203/21/2026
Gregg Rothstein Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Eek Construction CoGeneral Contractor207/08/2026
Bestco General Electric MainElectrical103/21/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sia Inspections7306310/27/2021
Building Lifecycle
08/03/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT D2, 4th STORY, 2nd APARTMENT FROM…
HPD violation · open
11/21/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/10/2023
§ 27-2033 ADM code provide ready access to buildings heating system locked door at boiler room
HPD violation · closed
06/10/2023
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · closed
10/14/2022
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 2# 340188380. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00376602-I1
42 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEek Construction Co12/14/2021
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co09/03/2021
DOB NOWStructuralSigned-offEek Construction Co11/04/2020
BISOTISSUEDEek Construction Co11/05/2021
BISOTISSUEDEek Construction Co10/21/2020
BISOTISSUEDEek Construction Co06/15/2020
BISOTISSUEDEek Construction Co03/12/2020
BISPLISSUEDTop Dog Plumbing & Heating02/23/2018
BISPLISSUEDTop Dog Plumbing & Heating04/24/2017
BISMHISSUEDXia General Contracting I05/10/2016
BISPLISSUEDTop Dog Plumbing & Heating03/23/2016
BISPLISSUEDTop Dog Plumbing & Heating03/23/2016
BISMHISSUEDXia General Contracting I03/18/2016
BISOTISSUEDXia General Contracting I03/17/2016
BISPLISSUEDTop Dog Plumbing & Heating02/26/2016
BISOTISSUEDDionisos Construction10/23/2015
BISMHISSUEDMRMD NY06/08/2015
BISOTISSUEDMRMD NY02/23/2015
BISPLISSUEDTop Dog Plumbing & Heating02/06/2015
BISOTISSUEDMRMD NY12/31/2014
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/07/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/10/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/29/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
09/16/2020Fire-Resistant Penetrations and Joints—special
07/28/2020Structural Steel - WeldingSOFIA KAPELYANspecial
07/27/2020FinalSOFIA KAPELYANprogress
127 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account